Powered by Made-in-China.com
Offshore Wind Rotor Hub Casting Megawatt Wind Turbine Hub Built to Drawing
US$3,860.00
1-2 Tons
US$3,640.00
3+ Tons
Product profile
Customization
AvailableType
Chemical Hardening SandCasting Method
Thermal Gravity CastingSand Core Type
Resin Sand CoreApplication
MW Wind TurbinesMachining
CNC MachiningMaterial
IronSurface Treatment
CustomizedSurface Roughness
Based on Customer RequirementsStandard
ASMECertification
CE, RoHS, ISO 9001:2000, ISO 9001:2008, ISO9001:2015,ISO 14001,ISO 45001:2018One-Stop Supply
Casting + MachiningNDT Method
Ut, Mt,PTMin. Temp
-40°C Impact TestedMax Capacity
60,000 Tons/YearNodularity Rate
≥90%Machining Accuracy
±0.01 mmSystem Position
Wind Turbine Rotor SystemTurbine Type
Offshore Wind Main HubOEM Service
Built to DrawingTransport Package
CustomizedSpecification
customizableTrademark
HNHJOrigin
ChinaProduction Capacity
60000 Tons/YearKey features
From casting to CNC machining, every process is completed in one factory for better quality control.
Each wind turbine hub casting is manufactured according to customer drawings, ensuring accurate interfaces and assembly compatibility.
Comprehensive inspection helps reduce quality risks before shipment.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 18 years CertifiedNearest Port: lianyungang portAverage Response Time: ≤0.12h
About Our Factory & Business Background
AddressXiawo Town, Shangjie District , Zhengzhou, Henan, China
Plant Area30857.93 square meters
Number of Employees200
Registered Capital70,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months, 3-6 months, 6-12 months Off Season Lead Time: 1-3 months, 3-6 months, 6-12 months
Minimum Order Quantity1 set
Supply Chain Partners30
Our Production Capability & Technical Expertise
Main ProductsAbsorption Tower, Distillation Column,Wind power equipment components
Production Lines1
Production MachinesMedium Frequency Furnace, Luosha Machine, Shot Blasting Machine, Vertical Lathe, Boring Machine, CNC Gantry, Horizontal Lathe
QA/QC inspectors6 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers6 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment1996-08-18
Main MarketsEurope, Southeast Asia/ Mideast
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff1
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Cooperated with Fortune 500No
Product Q&A
Q:Why is machining allowance important for a MW wind turbine hub?
A:
Insufficient machining allowance may prevent critical surfaces from reaching the required tolerances, while excessive allowance increases machining time and cost. Proper casting process planning helps balance manufacturing efficiency and dimensional accuracy.
Q:Why do some wind projects require low-temperature ductile iron?
A:
For turbines operating in cold climates or offshore environments, low-temperature ductile iron provides better impact toughness, helping maintain structural reliability under demanding service conditions.
Q:What usually determines the manufacturing lead time?
A:
Lead time mainly depends on casting size, tooling requirements, machining scope, inspection standards, and production scheduling rather than casting alone. Confirming technical details early helps avoid delays during production.
Send Inquiry
*To:
HENAN PROVINCE CHEMICAL MACHINERY MANUFACTURING CO., LTD.
HENAN PROVINCE CHEMICAL MACHINERY MANUFACTURING CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Custom Closed Blade Sand Casting Fan Rotor Hub for Ventilation
US$70.00-95.00
50 Pieces(MOQ)
Cast Iron Wheel Hub for Automobile and Truck Spare Parts
US$1,000.00-1,200.00
1 Ton(MOQ)
Sand Casting 5MW+ Wind Turbine Hub Ductile Iron Wind Turbine Casting
US$2,397.00-2,555.00
1 Ton(MOQ)
Tractor Parts Case Cast Iron Front Axle Parts Wheel Hubs
US$1,000.00-1,200.00
1 Ton(MOQ)
Low Temperature Ductile Iron Rotor Hub Castings Utility-Scale Wind Turbine Hub
US$2,370.00-2,600.00
1 Ton(MOQ)
OEM Different Size of Car Gray Cast Iron and Steel Wheel Hub
US$1,000.00-1,200.00
1 Ton(MOQ)
Deepwater Offshore Wind Main Hub OEM Cast Iron Casting with Precision Machining
US$64,600.00-66,500.00
1 Piece(MOQ)
Tractor and Forklift Cast Iron Wheel Hub Axle Hub, Wheel Rim
US$1,000.00-1,200.00
1 Ton(MOQ)
Agriculture Machinery Part Ductile Cast Iron Main Shaft Shell Wheel Hub
US$2.34
100 Pieces(MOQ)
Cast Iron Hubs for Industrial/Machinery/Agricultural Farm Forklift/Truck/Tractor Parts
US$0.60-150.00
100 Pieces(MOQ)
Densen Customized Sand Casting Products High-Quality Aluminum Casting Electrical Machinery Wheel Hub
US$1.00-2.00
1,000 kg(MOQ)
Grey Iron Ductile Iron Hub Casting and Parts for Agricultural and Construction Machinery Manufacturer Customized
US$0.60-150.00
100 Pieces(MOQ)
Custom Made Sand Casting 1045 Steel Wheel Hub in China
US$1,000.00-1,500.00
1 Ton(MOQ)
Custom Sand Cast Iron Fan Hub Industrial Centrifugal Ventilator
US$70.00-95.00
50 Pieces(MOQ)
Custom Precision CNC Machining Aluminum Alloy Investment Casting Wheel Hub
US$177.00-243.00
100 Pieces(MOQ)
Factory Supply Casting Process Knott Type 900kg 1500kg 1800kg Trailer Hub
US$11.00-15.00
500 Pieces(MOQ)



















