Powered by Made-in-China.com
Advanced Climate Control Heat Exchange System for HVAC Solutions
US$117.00
1 sets
US$93.00
2-4 sets
US$56.00
5+ sets
Sample price:US$16.00/piece.Request sample
Product profile
Customization
AvailableWarranty
1 YearCertification
CE, ISOModel NO.
Finned tube heat exchangerApplication
Heat ExchangerPrinciple
Mixing Heat ExchangerStyle
Plate TypeMaterial
Stainless SteelPplication
Heavy Industry Cooling and HeatingWeight (Kg)
100Video Outgoing-Inspection
ProvidedMachinery Testreport
ProvidedYpe
Tube Heat ExchangerMaximum Working Pressure
4.5 MPaFrame Material
Galvanized, Galvanize Steel, SsFin Material
Aluminum, Copper, SsDimension(L*W*H)
CustomizedTube Material
Copper, Ss, Titanium, Cu-NiTransport Package
Steel Frame Wooden BoxSpecification
1cn*1cn*1cnTrademark
TUOFANGOrigin
Henan, ChinaHS Code
73059000Production Capacity
5000Key features
Customized Dimensions: Dimension (L*W*H) is fully customizable to meet specific project requirements.
Wide Material Selection: Plates available in Aluminum, Stainless Steel, and Titanium for various environments.
High Thermal Efficiency: Achieves 85% efficiency for gas-gas and 90% for gas-liquid heat transfer applications.
Optimized Airflow Design: Herringbone corrugated fins reduce pressure drop by 22% for better energy performance.
Smart Control System: Optional IoT-enabled fan speed adjustment with PID logic for precise thermal management.
Comprehensive Certifications: Compliant with CE, ISO 9001, ISO 14001, and ASME Sec. VIII standards.
Flexible Customization: Offers full customization including multi-pass designs, anti-frost coils, and dust filters.
Low Noise Operation: Standard noise level is 60dB(A) with optional low-noise versions available.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 4 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤1.17h
About Our Factory & Business Background
AddressNo. 13 Jinhui Avenue, Jinhui District, Yanling County, Xuchang City, Henan Province
Plant Area3000 square meters
Number of Employees19
Registered Capital10,000,000 RMB
Terms of PaymentLC, D/P, T/T, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Set
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsHeat Exchanger, Air Cooled Heat Exchanger, Shell and Tube Heat Exchanger, Plate Heat Exchanger, Finned Tube, Radiator, Spiral Plate Heat Exchanger
Production Lines6
Production MachinesShearing machine, Laser welding machine, High-frequency sealing machine, Laser cutting machine
QA/QC inspectors2 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers5 people
Traceability of Raw MaterialsNo
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2021-11-05
Main MarketsSouth Asia
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Cooperated with Fortune 500No
Product Q&A
Q:How can I trust your company if I haven't done business with you before?
A:
Our company is a gold medal supplier with authoritative certificates such as CE, ISO9001, and Alibaba on-site inspection certificates.
Q:What is the minimum order quantity?
A:
We mainly deal with wholesale, but we can set the MOQ as 1 piece if you insist on buying just one.
Q:How can I get a sample and how long does it take?
A:
Free samples are provided after price confirmation. Samples are ready in 3-7 days and arrive in 3-5 days via express.
Q:What payment methods do you accept?
A:
We accept T/T, L/C, Western Union, and Paypal.
Q:What are the shipment terms and delivery time?
A:
We offer FOB, CFR, and CIF terms with a delivery time of 15-50 days.
Send Inquiry
*To:
Henan Tuofang Energy Saving Technology Co., Ltd.
Henan Tuofang Energy Saving Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Liquid Cooling System for Efficient HVAC Solutions
US$68.00-318.00
1 Piece(MOQ)
Advanced Energy Efficient Heat Exchange System for Galvanizing
US$2,000.00-10,000.00
1 Set(MOQ)
Advanced Cooling Solutions: High-Efficiency Refrigeration Heat Exchange System
US$0.80-10.00
1 pieces(MOQ)
Advanced Elliptical Heat Exchange System for Maximum Efficiency
US$1.40-5.00
1 Piece(MOQ)
Advanced Customizable Heat Exchange Systems for Optimal Performance
US$128.00-1,780.00
1 Piece(MOQ)
Advanced Customized Heat Exchanger Systems for Power Generation
US$299.00-1,000.00
1 Piece(MOQ)
Innovative Refrigeration System Featuring Advanced Heat Exchange Technology
US$468.00-3,060.00
1 Piece(MOQ)
Advanced Industrial Heat Exchanger System for Efficient Factory Ventilation
US$63.00-129.00
1 sets(MOQ)
Premium Heat Transfer for HVAC Systems
US$50.00-2,000.00
1 Piece(MOQ)
Heat Exchanger Unit for Temperature Control System
US$100.00-10,000.00
1 Piece(MOQ)
The Energy Saving Heat Exchange System for Electroplate
US$2,000.00-10,000.00
1 Set(MOQ)
High-Efficiency Heat Transfer for HVAC Systems
US$50.00-2,000.00
1 Piece(MOQ)
High-Performance Heat Exchange System for Independent Pool Circulation
US$50,000.00
1 Set(MOQ)
High-Performance Stainless Steel Cooling System for Optimal Heat Exchange
US$142.00-169.00
1 units(MOQ)
Advanced Heat Recovery System with CE Certification for Energy Efficiency
US$2,000.00-10,000.00
1 Set(MOQ)
Heat Recovery Ventilation System Indoor Climate Solution
US$121.00-130.00
1 Piece(MOQ)
High Quality Anti-Corrosion Waste Heat Recovery System for Sinter Lines
US$1,400,000.00-5,000,000.00
1 Piece(MOQ)
Popular Choice Low Consumption Waste Heat Recovery System for Metallurgy Firms
US$1,400,000.00-5,000,000.00
1 Piece(MOQ)
HVAC Systems for Fresh Air Condition/Return Air Condition Ventilation Unit
US$290.00-355.00
5 Pieces(MOQ)
Wholesale Pricing Anti-Corrosion Waste Heat Recovery System for Sinter Lines
US$1,400,000.00-5,000,000.00
1 Piece(MOQ)



















