Powered by Made-in-China.com
Drop Forged Construction Building Material Scaffold System Scaffolding Coupler for Russian Market
US$0.40-2.00
1 Piece
Sample price:US$0.95/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
YesWarranty
YearsModel NO.
SC-122Material
SteelType
FixedStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Floor Type ScaffoldingLapping Form
Full ScaffoldingErection Position
External ScaffoldingMove Method
Attached Lifting ScaffoldingScaffolding Part Type
Scaffolding CouplersConstruction Properties
Building ScaffoldRaw Material
MetalGrand
Q235Surface Treatment
Electro Galvaznied/Hot DIP GalvanizedUsage
48.3/48.6mm PipeProduction Procedure
PressedMarket
OverseasFunction
ExportTransport Package
PalletSpecification
48.6mmTrademark
HUAYOUOrigin
ChinaHS Code
7308400000Production Capacity
5000000pieces/YearKey features
Customizable Raw Material: Available in Q235 or Q355 steel grades to meet specific project requirements.
Customizable Surface Treatment: Options include Electro Galvanized or Hot DIP Galvanized for enhanced corrosion resistance.
Comprehensive After-Sales Service: Dedicated support team available to assist with product inquiries and technical issues.
High Production Capacity: 5000 square meter workshop with over 100 staff capable of loading 10 containers daily.
Near Port Location: Located in Tianjin, a major port city ensuring efficient global cargo transport.
Competitive Pricing: Low cost labor and proximity to raw material sites ensure cost-effective solutions.
Mature Mould Technology: Extensive range of mature moulds available to meet diverse international standards.
Quality Assurance: ISO 9001 and SGS certified with over 10 years of experienced workforce.
Company profile

Business Type: Other, Group CorporationExport Year: 2019-03-19Nearest Port: Tianjin PortAverage Response Time: ≤3.82hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, FCA
About Our Factory & Business Background
AddressRm331-332, Huaying Building, Airport Economic Zone, Tianjin City, Tianjin, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsScaffolding, Scaffold, Scaffolding System, Ringlock Scaffolding, Building Material, Formwork, Machine, Hardware, Metal Work, Construction
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:Where is the loading port?
A:
Tianjin Xin port
Q:What's the MOQ of the product?
A:
Different item has different MOQ, can be negotiated.
Q:What certificates do you have?
A:
We have ISO 9001, SGS etc.
Q:Can I get some samples?
A:
Yes, Sample is free, but shipping cost is on your side.
Q:How long is the production cycle after ordering?
A:
Generally need around 20-30 days.
Send Inquiry
*To:
Tianjin Huayou Scaffolding Co., Ltd.
Tianjin Huayou Scaffolding Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
48.3mm Forged Steel Right Angle Double Coupler for Brazil Standard Construction
US$1.61-1.68
3,000 Pieces(MOQ)
En74-1 Bb Standard Forged Steel Double Coupler for Germany Construction Scaffolding Pipes
US$2.00-2.50
5,000 Pieces(MOQ)
Premium Drop Forged Scaffolding Swivel Coupler for Construction
US$0.90
10,000 Pieces(MOQ)
Swivel Fixed Forged Us Scaffolding Coupler for Construction
US$0.90-1.50
100 Pieces(MOQ)
Swivel Scaffolding Clamp 48.3mm Steel Pipe Coupler for Building Construction Accessories
US$0.92-1.00
5,000 Pieces(MOQ)
Heavy-Duty Forged Swivel Coupler for Reliable Scaffolding Solutions
US$1.00-1.50
1 Piece(MOQ)
Drop Forged Steel 360 Degree Clamp/Swivel Coupler for American Construction Scaffolding
US$2.80-5.00
500 Pieces(MOQ)
Scaffolding Building Scaffold Packed by Bags and Pallet Retaining Coupler for Tube
US$0.80-1.50
1,000 Pieces(MOQ)
Efficient Forged Scaffolding Clamp Scaffold Coupler BS1139 for Quick Installations.
US$0.52
3,000 Pieces(MOQ)
Durable Scaffold Tube Clamp Swivel Coupler for Robust Scaffolding Systems
US$0.90
5,000 Pieces(MOQ)
Fixed Drop Forged Scaffolding Coupler
US$3.05-3.10
1,000 Pieces(MOQ)
Stainless Steel & Carbon Steel Scaffolding Coupler, Fixed/Swivel Type, Galvanized Finish, Scaffold Pipe Clamp for Building
US$0.002-0.008
1,000 Pieces(MOQ)
Hot Sale Drop Forged American Double Coupler Used for Scaffolding
US$2.10-2.20
1,000 Pieces(MOQ)
Scaffolding Couplers Building Scaffold Packed by Bags and Pallet Drop Forged Pressed Coupler
US$0.80-1.50
1,000 Pieces(MOQ)



















