Powered by Made-in-China.com
Data-Integrated Distribution Test Transformer System Connects Seamlessly with Enterprise Management Software Platforms
US$150,000.00-700,000.00
1 Set
Product profile
After-sales Service
All SeriesWarranty
1 YearMax Diameter of Workpiece
NaModel NO.
Test SystemMass Scope of Workpiece
>20000kgType
Distribution Transformer Test SystemMaxcapacity
NaAccuracy Grade
1Load Way
NaLoading Method
NaDisplay
PC Software DisplayControl
Computer ControlWeight
Depends on The Specific Situation.Power Source
AC380VOil Cylinder Position
NaTest Object
Power Transformers / Distribution Transformers / SData Acquisition
Multi-Channel High-Speed Data AcquisitionSafety Protection
Grid-Isolated Operation / Interlock Protection / EPhase Control
Output Phase Sequence Configurable (Optional)Standards
IEC 60076 / IEC 61439 / IEC 60947Transport Package
Containerized Packing / Export Wooden PackingSpecification
300*300*300Trademark
LAUNCHOrigin
ChinaHS Code
8504349000Key features
Integrated Testing Platform: Combines voltage regulator, power supply, and measuring systems for comprehensive transformer testing.
High Accuracy Measurement: Ensures stable test performance with precision measurement capabilities for routine and type tests.
Modular Customizable Design: Features modular configuration allowing easy expansion and customization based on specific needs.
Advanced Safety Interlocks: Multi-level safety interlocks designed for secure high-voltage operation during testing.
PLC Centralized Control: Automated PLC-based control with data recording and report output capabilities.
Comprehensive Test Coverage: Supports routine, type, and special tests including DGA, partial discharge, and impulse tests.
1-Year Warranty Coverage: Provides a 1-year warranty for all series of the distribution transformer test system.
Remote Technical Support: Offers operation manuals, videos, and remote video call training for equipment usage.
Company profile
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 14 Years CertifiedNearest Port: Shanghai PortAverage Response Time: >24h CertifiedTerms of Payment: T/T
About Our Factory & Business Background
Address127d, Building 7, No. 438 Xinnongpuyin Road, Zhujing Town, Jinshan District, 201599 Shanghai, Shanghai, China
Plant Area200 square meters
Number of Employees10
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Set
Supply Chain Partners10
Our Production Capability & Technical Expertise
Main ProductsPartial Discharge Test, High Voltage Tester, AC Hipot Tester, DC Hipot Tester, Impulse Voltage Generator, High Voltage Insulation Equipment, Transformer Testing Instrument
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2011-04-27
Main MarketsSouth America, Southeast Asia/ Mideast
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:How is the product quality?
A:
We are a manufacturer, so we can guarantee preferential prices and high quality.
Q:How soon can I get a price quote?
A:
We usually provide a quote within 6 hours of receiving an inquiry. For urgent requests, please call us for priority handling.
Q:What are your terms of delivery?
A:
We offer EXW, FOB, CFR, and CIF. Please select the option that is most convenient and cost-effective for you.
Q:What if I have difficulty using the equipment?
A:
We first provide operation manuals and videos, or offer training via remote video call. If necessary, engineers will serve on-site.
Q:What is the lead time for production?
A:
It depends on order quantity and product item. For normal items, it is usually within 3 working days. Delivery takes 5-7 days via logistics.
Send Inquiry
*To:
Shanghai Lanqi Electric Co., Ltd.
Shanghai Lanqi Electric Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Fully Automated Transformer Test System with Load Free Losses Heating Test of Distribution Transformers
US$5,400.00-79,000.00
1 Set(MOQ)
Complete Set Intelligent Transformer Temperature Rise Test System with Data Recording Function
US$1,000.00-50,000.00
1 Set(MOQ)
China Supplier Distribution Transformer Test System Epbz-III
US$5,400.00-79,000.00
1 Set(MOQ)
Automatic High Voltage Transformer Test System Integrated Transformer Test Unit with Control Bench
US$5,000.00-70,000.00
1 Set(MOQ)
Transformer Test Bench Short Circuit Test (SC Test) Load Losses Test System
US$4,890.00-68,990.00
1 Set(MOQ)
Computer Control Valve Test Equipment with Data Collection and Pressure Collection Test System
US$16,000.00-17,000.00
1 Piece(MOQ)
Automatic Transformer Test Bench Power Transformer Factory Ex-Works Test System
US$4,890.00-68,990.00
1 Set(MOQ)
Dual Stage AC Dielectric Test System with 75kV Primary 75kV Secondary Transformer
US$3,699.00-3,799.00
1 sets(MOQ)
Integrated Transformer Hipot Test Bench Power Frequency Withstand Voltage Test System
US$11,999.00-12,999.00
1 Set(MOQ)
Power or Distribution Transformer 400kv Impulse Voltage Generator Test System
US$50,000.00
1 Piece(MOQ)
5kVA/50kV AC Hipot Withstand Voltage Test System with Dry Type Testing Transformer
US$399.00-1,999.00
1 Piece(MOQ)
GDYD-1010D HV Hipot Test system 10kVA/100kV with Gas Type transformer
US$3,580.00-6,800.00
1 Set(MOQ)
Integrated CT/PT Transformer Test System for Accurate Results
Negotiable
1 Piece(MOQ)
Distribution Transformer Test System with Tan Delta and Capacitance Measurement
US$150,000.00-700,000.00
1 Set(MOQ)
Integrated Distribution and Power Transformer Full-Function Test System
US$150,000.00-700,000.00
1 Set(MOQ)
China Manufacturer Distribution Automatic Integrated Transformer Comprehensive Routine Test System
US$50,000.00-200,000.00
1 Piece(MOQ)



















