SourcingAI
Try for free
Powered by Made-in-China.com
Distribution Transformer Test System with Tan Delta and Capacitance Measurement
US$150,000.00-700,000.00
1 Set

Product profile

After-sales Service

All Series

Warranty

1 Year

Max Diameter of Workpiece

Na

Model NO.

DTTS

Mass Scope of Workpiece

>20000kg

Type

Distribution Transformer Test System

Maxcapacity

Na

Accuracy Grade

1

Load Way

Na

Loading Method

Na

Display

PC Software Display

Control

Computer Control

Weight

Depends on The Specific Situation.

Power Source

AC380V

Oil Cylinder Position

Na

Test Object

Power Transformers / Distribution Transformers / S

Data Acquisition

Multi-Channel High-Speed Data Acquisition

Safety Protection

Grid-Isolated Operation / Interlock Protection / E

Phase Control

Output Phase Sequence Configurable (Optional)

Standards

IEC 60076 / IEC 61439 / IEC 60947

Transport Package

Containerized Packing / Export Wooden Packing

Specification

Na

Trademark

Launch

Origin

China

HS Code

8504349000

Key features

Comprehensive Testing Capabilities: Supports routine and type tests including tan delta, capacitance, partial discharge, and DGA.
Modular & Customizable Design: Modular configuration allows easy expansion and customization based on specific needs.
High Accuracy Measurement: Ensures stable test performance with high accuracy for all measurement parameters.
Multi-Level Safety Protection: Features grid-isolated operation, interlock protection, and safety interlocks for high voltage.
PLC-Based Centralized Control: Enables automatic switching, sequencing, data recording, and report output.
1-Year Warranty Coverage: Includes comprehensive warranty for all mechanical and electrical components.
Remote Technical Support: Provides operation manuals, videos, and remote video call training for users.
Fast Response Time: Price quotes provided within 6 hours; urgent inquiries handled with priority.

Company profile

Shanghai Lanqi Electric Co., Ltd.
Years of Export ExperienceFlexible CustomizationQuality AssuranceR&D Capabilities
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 14 Years CertifiedNearest Port: Shanghai PortAverage Response Time: >24h CertifiedTerms of Payment: T/T

About Our Factory & Business Background

Address127d, Building 7, No. 438 Xinnongpuyin Road, Zhujing Town, Jinshan District, 201599 Shanghai, Shanghai, China
Plant Area200 square meters
Number of Employees10
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Set
Supply Chain Partners10

Our Production Capability & Technical Expertise

Main ProductsPartial Discharge Test, High Voltage Tester, AC Hipot Tester, DC Hipot Tester, Impulse Voltage Generator, High Voltage Insulation Equipment, Transformer Testing Instrument
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2011-04-27
Main MarketsSouth America, Southeast Asia/ Mideast
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:How is the product quality?
A:
We are a manufacturer, so we can guarantee preferential prices and high quality.
Q:How soon can I get a price?
A:
We usually provide a quote within 6 hours of receiving an inquiry. For urgent needs, please call us for priority handling.
Q:What are your terms of delivery?
A:
We offer EXW, FOB, CFR, and CIF. Please select the most convenient and cost-effective option for you.
Q:What if I have difficulty using the equipment?
A:
We first provide operation manuals, videos, or remote video training. If necessary, engineers will serve on-site.
Q:What is the lead time for production?
A:
It depends on order quantity and product item. Normal items usually take within 3 working days. Delivery time is generally 5-7 days depending on logistics.

Send Inquiry

*To:Shanghai Lanqi Electric Co., Ltd.Shanghai Lanqi Electric Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like