SourcingAI
Try for free
Powered by Made-in-China.com
Multi-Station Power Transformer Test System Parallelizes Operations for Maximum Throughput
US$150,000.00-700,000.00
1 Set

Product profile

After-sales Service

All Series

Warranty

1 Year

Max Diameter of Workpiece

Na

Model NO.

Test System

Mass Scope of Workpiece

>20000kg

Type

Power Transformer Test System

Maxcapacity

Na

Accuracy Grade

1

Load Way

Na

Loading Method

Na

Display

PC Software Display

Control

Computer Control

Weight

Depends on The Specific Situation.

Power Source

AC380V

Oil Cylinder Position

Na

Test Object

Power Transformers / Distribution Transformers / S

Data Acquisition

Multi-Channel High-Speed Data Acquisition

Safety Protection

Grid-Isolated Operation / Interlock Protection / E

Phase Control

Output Phase Sequence Configurable (Optional)

Standards

IEC 60076 / IEC 61439 / IEC 60947

Transport Package

Containerized Packing / Export Wooden Packing

Origin

China

Key features

Multi-Station Parallel Operations: Divides testing into specialized stations for unmanned efficiency and high throughput.
Comprehensive Test Coverage: Supports routine, type, and special tests including DGA, partial discharge, and impulse voltage.
High Accuracy Measurement: Ensures stable performance with precision data acquisition and reporting capabilities.
Modular & Customizable Design: Flexible configuration allows easy expansion and customization based on specific needs.
Advanced Safety Protection: Features grid-isolated operation, interlock protection, and multi-level safety interlocks.
IEC Standards Compliance: Fully compliant with IEC 60076, IEC 61439, and IEC 60947 international standards.
Remote & On-site Support: Provides manuals, videos, remote training, and on-site engineer service when necessary.
Fast Response Time: Price quotes provided within 6 hours; urgent inquiries handled with priority.

Company profile

Shanghai Lanqi Electric Co., Ltd.
Years of Export ExperienceFlexible CustomizationQuality AssuranceR&D Capabilities
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 14 Years CertifiedNearest Port: Shanghai PortAverage Response Time: >24h CertifiedTerms of Payment: T/T

About Our Factory & Business Background

Address127d, Building 7, No. 438 Xinnongpuyin Road, Zhujing Town, Jinshan District, 201599 Shanghai, Shanghai, China
Plant Area200 square meters
Number of Employees10
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Set
Supply Chain Partners10

Our Production Capability & Technical Expertise

Main ProductsPartial Discharge Test, High Voltage Tester, AC Hipot Tester, DC Hipot Tester, Impulse Voltage Generator, High Voltage Insulation Equipment, Transformer Testing Instrument
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2011-04-27
Main MarketsSouth America, Southeast Asia/ Mideast
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:How is your product quality?
A:
We are a manufacturer, so preferential price and high quality can guarantee.
Q:How soon can I get a price?
A:
Usually provide within 6 hours once receiving inquiry. If you are very urgent, please call us then we will do in priority.
Q:What are your terms of delivery?
A:
EXW, FOB, CFR, CIF, etc. Please select your most convenient and cost effective.
Q:What if there is difficulty in using?
A:
We will first provide equipment operation manual, operation video, or provide training through remote video call. If necessary, engineers will serve on door.
Q:What is the leading time for production?
A:
That depends on order qty and product item. For normal items, usually within 3 working days. Delivery time is determined by the logistics, generally is 5-7 days.

Send Inquiry

*To:Shanghai Lanqi Electric Co., Ltd.Shanghai Lanqi Electric Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like