Powered by Made-in-China.com

Gold Ore Mineral Processing Mining Equipment with Flotation Flowchart
US$30,000.00-1,000,000.00
1 set
Sample price:US$40000.00/set.Request sample
Product profile
Customization
AvailableCapacity
2-2000t/HApplication
Gold RecoverySupply Range
PackageManufacturing Period
3-8 MonthsInstallation
Indoor and OutdoorSupply Mode
One-Stop SolutionTransport Package
ContainerizedTrademark
HZEOrigin
ChinaProduction Capacity
5 Sets/YearKey features
One-Stop EPC Service: Comprehensive solutions from feasibility studies and design to manufacturing, installation, and training.
Integrated Manufacturing: Own 50,000 sqm factory with complete manufacturing routes, ensuring quality and cost control.
Advanced 3D Design: 3D modeling for equipment, process flow, and steel structure to shorten construction and reduce costs.
Expert Technical Team: Team includes senior engineers, university professors, and top technical experts for reliable support.
Cloud-Based Management: Customer files uploaded to cloud for real-time access to documents, videos, and project progress.
Flexible Capacity: Processing capacity ranges from 2 to 2000 tons per hour to suit various plant scales.
Multi-Metal Recovery: Effective recovery of gold, silver, copper, lead, zinc, and iron using flotation and gravity methods.
Global Service Network: Services available worldwide with support for indoor and outdoor installation and commissioning.
Company profile

Business Type: Manufacturer/FactoryExport Year: 2014-08-01Nearest Port: QINGDAOAverage Response Time: ≤15hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW
AI-Powered supplier vetting
SummaryYantai Huize Mining Engineering Co., Ltd. (HZE) is identified as a China-based manufacturer/factory and limited company specializing in mineral-processing and mining equipment. The supplier reports ISO 9000, ISO 9001, ISO 14000, and ISO 14001 certifications, 21–30 quality-control staff, more than 10 production lines, and 41–50 years of total R&D-engineer experience. Reported production includes 58 complete mineral-processing plants, 162 ball mills, 360 flotation machines, 188 jaw crushers, and 196 gold-leaching tanks. The company states it has self-operated import/export rights and that exports represent 51%–70% of sales. Evidence is insufficient to verify after-sales service, customization capability, or broad customer-case experience. Trade records show one transaction each associated with Tanzania and RAMANI INVESTMENT LIMITED for sleeves and springs, but these records do not establish performance or project success.
Supplier typeThe supplier is described as a Manufacturer/Factory and a limited company headquartered in Yantai, Shandong, China. Its stated offerings cover a broad range of mineral-processing equipment, although one associated-company classification identifies a trading-company nature, creating some classification inconsistency.
CertificationsThe supplier reports ISO 9000, ISO 9001, ISO 14000, and ISO 14001 management-system certifications. These stated certifications support the presence of formal quality and environmental management systems.
R&D capabilityThe supplier reports 41–50 years of total R&D-engineer experience and describes a company philosophy focused on detail and quality improvement. This supports an established technical development function, but no specific patents, proprietary technologies, or documented innovations are provided.
Production capacityThe supplier reports more than 10 production lines, 21–30 quality-control staff, and substantial output figures: 58 complete mineral-processing plants, 162 ball mills, 360 flotation machines, 188 jaw crushers, and 196 gold-leaching tanks. These figures explicitly support significant production capacity.
Product Q&A
Q:What is the main business scope of HZE?
A:
HZE provides mineral processing EPC, project consultation, engineering design, equipment manufacturing, installation, commissioning, training, operation management, spare parts supply, and technical support.
Q:What are the core advantages of HZE?
A:
HZE offers one-stop service, owns a 50,000 sqm manufacturing plant, has its own R&D center and design institute, and employs an expert team including university professors and senior engineers.
Q:How does HZE use 3D design in projects?
A:
HZE uses 3D software for equipment, process flow, pipelines, steel structures, and packaging design. This improves quality, shortens construction time, and reduces project costs.
Q:What service features does HZE provide to customers?
A:
HZE provides close cooperation, detailed pre-sales planning, cloud-based customer files for real-time monitoring, and ongoing technical guidance and training during production.
Q:What is the typical manufacturing period?
A:
The manufacturing period is generally 3-8 months, with off-season lead times of 1-3 months and peak season lead times of 3-6 months.
Send Inquiry
*To:
Yantai Huize Mining Engineering Co., Ltd.
Yantai Huize Mining Engineering Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Gold Ore Gravity Concentration Equipment with Processing Flowchart
US$30,000.00-500,000.00
1 set(MOQ)
Raw Ore Mineral Processing Gold Mining Equipment
US$10,000.00-5,000,000.00
1 set(MOQ)
Rock Gold Mineral Processing Plant Mining Equipments From Gandong/Jiangxi Well-Tech International Mining Equipment
US$19,000.00-20,000.00
1 Piece(MOQ)
Gold Ore Small Scale Mineral Processing Equipment with Flotation Flowchart
US$30,000.00-1,000,000.00
1 set(MOQ)
Gold Ore Gravity Separation Equipment with Processing Flowchart
US$30,000.00-500,000.00
1 set(MOQ)
Gold Mineral Processing Plant Mining Equipments From Gandong
US$19,000.00-20,000.00
1 Piece(MOQ)
Premium Underground Gold Mining Equipment with Rotary Kiln
US$126.00
1 Piece(MOQ)
Small Scale Gold Mining Equipment for Rock Stone Gold Plant
US$19,000.00-20,000.00
1 Piece(MOQ)
Wanrun Hot Sale Portable Gold Mining Equipment with Trommel for River and Stream Operations
US$4,509.59
1 Piece(MOQ)
High Quality and Lower Cost Material Flotation Equipment Use for Mining Ores
US$12,000.00-60,000.00
1 Piece(MOQ)
Gold Mining Equipment for Sale
US$50,000.00
1 set(MOQ)
Mining Flotation Separator Equipment for Ore
US$16,000.00-20,000.00
1 Piece(MOQ)
5-50tph Gold Mining Equipment Manufacturer
US$50,000.00
1 set(MOQ)
Stone Gold Plant Complete Set Machine Include Water Pump Slurry Pump All Auxiliary Equipment
US$19,000.00-20,000.00
1 Piece(MOQ)
Gold Mining Equipment for Rubber Belt Vacuum Filter
Negotiable
1 Piece(MOQ)
Gold Finding Equipment Black Sand Shaking Tables for Gold Processing Plant High Recovery
US$1,200.00-1,260.00
1 Piece(MOQ)
Mining Equipment for Gold, Copper, Lead&Zinc, Alluvial Gold, etc
US$12,300.00
1 Set(MOQ)
DALI UK-30 Dump Truck Underground Gold Mining Equipment Price
US$580,000.00
1 Piece(MOQ)
Hot Sale New Type Ceramic Kiln Plant Designed Production Line Mining Equipment
US$20,000.00
1 Piece(MOQ)



















