Powered by Made-in-China.com
48.6mm Pressed Scaffolding Fixed Coupler Right Angle Clamp for Building Scaffold System
US$0.99
1,000-4,999 Pieces
US$0.80
5,000+ Pieces
Sample price:US$0.01/piece.Request sample
Product profile
Customization
AvailableConnection Type
Pin ConnectionFinish
GalvanizedModel NO.
48Material
SteelType
Scaffold CouplersFramework
Combined ScaffoldingConstruction Properties
Building ScaffoldLapping Form
Full ScaffoldingApplication
Decorations, ConstructionsFeature
Cost Effective, No Welding, High Quality, etcTransport Package
Standard PackagingSpecification
Compatible with 48-48 steel pipes. The national stTrademark
RenzhongOrigin
ChinaProduction Capacity
2000 Tons/MonthKey features
The scaffold coupler firmly connects the steel pipes and is easy to install and disassemble, while remaining durable.
The scaffold coupler are prone to loosen and slip off. The thickened clasps are used for reinforcement to ensure a secure and stable locking and prevent detachment.
The scaffold coupler are forged with thickened material, ensuring a tight fit and high pressure resistance, and they are not prone to deformation.
Scaffold coupler are used for assembling the building frame, ensuring the stability of construction and enhancing the safety of lifting operations.
The scaffold coupler are superior to ordinary fasteners. They have a tight fit and are resistant to twisting, and they are not likely to loosen even after long-term use.
The scaffold coupler is precisely cast and reinforced with locking clips, providing strong and durable fastening that does not loosen over time.
Company profile

Business Type: Trading CompanyExport Year: 2019-08-30Nearest Port: Shanghai Port, Tianjin PortAverage Response Time: ≤5.16hTerms of Payment: T/T, LC, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA
About Our Factory & Business Background
AddressWuxi, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsStainless Steel Tube, Stainless Steel Sheet, Scaffolding, Stainless Steel Coil, Scaffolding Pipe, Stainless Steel Pipe, Stainless Steel Plate, Scaffolding Coupler, 304 Stainless Steel Sheet, 304 Stainless Steel Plate
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:How can we trust your company?
A:
We specialize in steel business for many years, you are welcome to investigate in any way,,anyway,you can place an order on Made-in-China,with trade assurance,which can ensure your payment.
Q:How do you guarantee the quality?
A:
1.We have passed ISO9001,SGS,CE and other certifications;
2.Always have pre-production samples before mass production,and always do finalinspection before shipment;
3. Acceptable third-party inspection.
Q:About the product price?
A:
Due to the cyclical changes in raw material prices, prices vary from period to period. You can consult us, you can communicate with us online through the platform, WeChat, WhatsApp and other platforms, and we will reply within 24 hours. Please give us your requirements and specifications (steel grade, size, quantity, destination port), and we will work out the best price at the first time.
Q:Can I visit your factory?
A:
Of course, we welcome customers from all over the world to visit our factory. However, some factories are not open to the public.
Q:Can you send samples?
A:
Of course, we can send samples to all over the world,our samples are free,but customers need to bear the express cost.
Send Inquiry
*To:
Jiangsu Renzhong Metal Products Co., Ltd.
Jiangsu Renzhong Metal Products Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Scaffolding Scaffold Formworks Coupler Formwork Steel Rapid Clip Fast Spring Clamps for Construction Formwork
US$0.20-0.50
1,000 Pieces(MOQ)
Heavy Duty Galvanized Scaffolding Fixed Pipe Clamp with Double Flat Welding Base for Construction Scaffold Tube
US$0.03-0.05
3,000 Pieces(MOQ)
Drop Forged Pressed Galvanized Swivel Coupler Double Scaffold Clamp for Scaffolding
US$0.40-1.50
1 Piece(MOQ)
Scaffolding Scaffold Formworks Coupler Clip Formwork Steel Rapid Fast Spring Clamps for Construction Formwork
US$0.20-0.50
1,000 Pieces(MOQ)
Hot Sale Scaffolding Material JIS Pressed Fixed Coupler Swivel Clamp
US$0.10-0.20
10,000 Pieces(MOQ)
Scaffold Steel Pressed Clamps for Tubular Scaffolding System
US$0.30-0.50
10,000 Pieces(MOQ)
Galvanized Left Right Pressed Scaffolding Clamp Pair for H Frame
US$1.00-1.20
1,000 Pieces(MOQ)
Pressed Steel Scaffolding Oyster Coupler Clamp for Construction
US$0.50-3.50
10,000 Pieces(MOQ)
Bestcon British Type Scaffolding Double Coupler Right Angle Pipe Clamp
US$0.50-3.50
10,000 Pieces(MOQ)
Drop Forged Galvanized Scaffolding Putlog Coupler, High Strength Scaffold Clamp for Tube Fitting
US$0.0015-0.0025
500 Pieces(MOQ)
High Strength Galvanized Pressed Steel Scaffold Clamp for Scaffolding System Fittings
US$1.31-1.45
1,000 Pieces(MOQ)
Factory Hot Sales Fixed Right Angle Forged Scaffolding Clamps Scaffold Clamp for Pipe Bolt Scaffold
US$1.00-2.00
2,000 Pieces(MOQ)
Scaffolding Fixed Joint Coupler Right Angle Steel Clamp for Building Maintenance Safety
US$1.23-1.53
500 Pieces(MOQ)
Load Capacity Coupler Scaffolding Clamp Right Angle Coupler Swivel Clamps
US$0.65-1.26
1,000 Pieces(MOQ)
High Strength Scaffolding Clamp for Tube and Pipe Frame Structure Scaffold Clamp Scaffold Coupler
US$1.31-1.45
1,000 Pieces(MOQ)



















