SourcingAI
Try for free
Powered by Made-in-China.com
6061-T6 Aluminum Formwork for Rapid Construction
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Rapid Construction Period: Construction period is 3-5 days per storey for efficient project completion.
No Plastering Required: Smooth surface after removal eliminates the need for additional plastering costs.
High Load Capacity: Supports 60 KN per square meter ensuring stability and uniform load distribution.
Crane-Free Assembly: Does not require crane for shifting and assembly, optimizing crane usage.
High Scrap Value: Scrap value is approximately 50% of the new panel cost.
Durable Material: Made from 6061-T6 Aluminum alloy, firm enough to prevent bursting.
Easy Installation: Workers can easily learn to install and dismantle after short training.
Versatile Applications: Suitable for wall, slab, beam, column, and stair formwork solutions.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤3.75h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the construction period for this formwork?
A:
The construction period is 3-5 days per storey.
Q:Does this system require a crane for assembly?
A:
No, it does not require a crane for shifting and assembly.
Q:Is plastering needed after removing the formwork?
A:
No, the smooth effect after removal means there is no need to plaster.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:What is the scrap value of the panels?
A:
The scrap value is about 50% of the new panel.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

6061-T6 Aluminum Formwork for Speedy Construction

6061-T6 Aluminum Formwork for Speedy Construction

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com
Aluminium Alloy 6061-T6 Moduar Formwork for Building House
Made-in-China.com
6061-T6 Aluminum Formwork for Fast Construction

6061-T6 Aluminum Formwork for Fast Construction

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com
6061-T6 Aluminum Formwork for Concrete Works Construction
Made-in-China.com
Korea Aluminum Formwork System for Concrete Construction
Made-in-China.com