SourcingAI
Try for free
Powered by Made-in-China.com
Aluminum Panel Mould Formwork for High Rise
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

Panel

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Fast Construction Speed: 3-5 days per storey with easy installation after short training.
High Load Capacity: 60 KN per square meter ensuring stability and preventing shifting.
Cost Saving Design: Smooth finish eliminates plastering needs and saves cleaning costs.
Crane Efficiency: No crane required for assembly, allowing crane use for other tasks.
High Scrap Value: Scrap value is about 50% of the new panel cost.
Durable Material: Made of Aluminium alloy 6061-T6, firm enough to prevent bursting.
Certified Quality: ISO and CE certified for reliable performance and safety.
Available Support: After-sales service available with 1-year warranty coverage.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤4.39h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the material of the aluminum formwork?
A:
The material is Aluminium alloy 6061-T6, which is firm and durable.
Q:How long does it take to construct one storey?
A:
The construction period is 3-5 days per storey.
Q:Is a crane required for installation?
A:
No, it does not require a crane for shifting and assembly.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:Do I need to plaster the walls after removing the formwork?
A:
No, the smooth effect after removing the formwork means there is no need to plaster.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Panel Formwork for Quick High Rise Building Construction
Made-in-China.com
Lightweight Aluminum Formwork for High Rise Buildings Hot Sale
Made-in-China.com