Powered by Made-in-China.com

Column Mould Formwork for Precise and Accurate Construction
US$50.00-100.00
1 Square Meter
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearsModel NO.
MPCertification
ISO, CEMaterial
SteelType
Wall FormworkCode
6061-T6Construction Period
5 DaysLoad Capacity
60knAfter Sale Service
AvailableTransport Package
StandardTrademark
MACPEXOrigin
ChinaHS Code
8480411000Production Capacity
50000Key features
Fast Construction Period: 3-5 days per storey with efficient installation process.
No Plastering Required: Smooth surface finish after removal eliminates plastering costs.
High Load Capacity: Supports 60 KN per square meter for uniform load distribution.
Crane-Free Assembly: Does not require crane for shifting, optimizing site efficiency.
High Scrap Value: Approximately 50% of new panel value upon retirement.
Durable Material: Constructed from high-quality Aluminium alloy 6061-T6.
Easy Installation: Workers can learn to install and dismantle after short training.
ISO and CE Certified: Meets international safety and quality standards.
Company profile
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤5.74h
About Our Factory & Business Background
AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the construction period for one storey?
A:
The construction period is 3-5 days per storey.
Q:Do I need a crane for assembly?
A:
No, the system does not require a crane for shifting and assembly.
Q:Is plastering required after removing the formwork?
A:
No, the smooth effect eliminates the need for plastering.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:What material is used for the formwork?
A:
It is made of Aluminium alloy 6061-T6.
Send Inquiry
*To:
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Aluminum Column Mould Formwork for Accurate Construction
US$50.00-100.00
1 Square Meter(MOQ)
Column Mould Formwork for Accurate and Reliable Construction Results
US$50.00-100.00
1 Square Meter(MOQ)
Modern Steel Tie Rod Timber Beam Formwork Molds for Concrete Walls and Columns
US$80.00-120.00
500 Square Meters(MOQ)
Building Material Concrete Plastic Mold ABS Concrete Shuttering Plastic Formwork for Wall Column and Slab Construction
US$50.77
100 Square Meters(MOQ)
Column Mould Formwork for Accurate Construction Results
US$50.00-100.00
1 Square Meter(MOQ)
Reusable Adjustable Metal Shuttering Steel Frame Plywood Concrete Mould Formwork for Slab Wall and Column Formwork
US$99.00-180.00
1,000 Meters(MOQ)
Column Mould Formwork for Accurate and Precise Construction
US$50.00-100.00
1 Square Meter(MOQ)
Round Mould Concrete Metal Steel Column Formwork for Road and Bridge Construction
US$3.90-19.90
500 Pieces(MOQ)
Concrete Casting Columns and Wall Metal Forms Mold Building Template for Formwork
US$92.00-138.00
500 Square Meters(MOQ)
Lianggong Formwork Reusable Modular Concrete PP Plastic Mold for Wall/Slab/ Column Construction
US$33.00-35.00
300 Square Meters(MOQ)
Concrete Columns and Wall Metal Forms Mold Building Template Formwork for Construction
US$92.00-138.00
500 Square Meters(MOQ)
Full Steel Formwork Precast Mould Building Steel Formwork for Walls, Round Columns, and Piers
US$98.87-100.87
100 Meters(MOQ)
OEM Custom Modern Design Concrete Molds Wall Column Formwork for Construction Engineering
US$70.00-135.00
100 Pieces(MOQ)
H20 Timber Beam Formwork System for Core Wall and Columns Mould Construction
US$140.00-250.00
1,000 Square Meters(MOQ)
Hot Selling Formwork Concrete Mold and Steel or Aluminum Formwork for Construction
US$200.00-800.00
40 Pieces(MOQ)



















