Powered by Made-in-China.com

Column Mould Formwork for Accurate and Precise Construction
US$50.00-100.00
1 Square Meter
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearsModel NO.
MPCertification
ISO, CEMaterial
SteelType
Wall FormworkCode
6061-T6Construction Period
5 DaysLoad Capacity
60knAfter Sale Service
AvailableTransport Package
StandardTrademark
MACPEXOrigin
ChinaHS Code
8480411000Production Capacity
50000Key features
No Plastering Required: Smooth surface after removal eliminates the need for additional plastering costs.
High Load Capacity: Supports 60 KN per square meter, ensuring stability and preventing shifting.
Fast Construction Speed: Construction period is 3-5 days per storey with easy installation and dismantling.
Cost-Effective Scrap Value: Scrap value is approximately 50% of the new panel price.
Crane-Free Assembly: Does not require a crane for shifting, allowing efficient use of other equipment.
Durable Aluminum Material: Made from 6061-T6 aluminum alloy, firm enough to prevent bursting.
ISO and CE Certified: Meets international quality and safety standards with ISO and CE certifications.
1-Year Warranty: Comprehensive 1-year warranty coverage for peace of mind.
Company profile
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤4.44h
About Our Factory & Business Background
AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the construction period for one storey?
A:
The construction period is 3-5 days per storey.
Q:Does the formwork require a crane for assembly?
A:
No, it does not require a crane for shifting and assembly, allowing the crane to be used for other activities.
Q:Is plastering needed after removing the formwork?
A:
No, the smooth effect after removing the formwork means there is no need to plaster.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:What is the scrap value of the aluminum formwork?
A:
The scrap value is about 50% of the new panel.
Send Inquiry
*To:
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Full Steel Formwork Precast Mould Building Steel Formwork for Walls, Round Columns, and Piers
US$98.87-100.87
100 Meters(MOQ)
Lianggong Formwork Reusable Modular Concrete PP Plastic Mold for Wall/Slab/ Column Construction
US$33.00-35.00
300 Square Meters(MOQ)
Concrete Columns and Wall Metal Forms Mold Building Template Formwork for Construction
US$92.00-138.00
500 Square Meters(MOQ)
Column Mould Formwork for Accurate Construction Results
US$50.00-100.00
1 Square Meter(MOQ)
Column Mould Formwork for Accurate and Reliable Construction Results
US$50.00-100.00
1 Square Meter(MOQ)
H20 Timber Beam Formwork System for Core Wall and Columns Mould Construction
US$140.00-250.00
1,000 Square Meters(MOQ)
Column Mould Formwork for Precise Construction
US$50.00-100.00
1 Square Meter(MOQ)
Aluminum Column Mould Formwork for Accurate Construction
US$50.00-100.00
1 Square Meter(MOQ)
Precise Dimensions and Aluminum Frame Formwork for Wall Concrete Construction
US$118.00-120.00
20 Pieces(MOQ)
Modern Steel Tie Rod Timber Beam Formwork Molds for Concrete Walls and Columns
US$80.00-120.00
500 Square Meters(MOQ)
Reusable Adjustable Metal Shuttering Steel Frame Plywood Concrete Mould Formwork for Slab Wall and Column Formwork
US$99.00-180.00
1,000 Meters(MOQ)
Building Material Concrete Plastic Mold ABS Concrete Shuttering Plastic Formwork for Wall Column and Slab Construction
US$50.77
100 Square Meters(MOQ)
Concrete Casting Columns and Wall Metal Forms Mold Building Template for Formwork
US$92.00-138.00
500 Square Meters(MOQ)
OEM Custom Modern Design Concrete Molds Wall Column Formwork for Construction Engineering
US$70.00-135.00
100 Pieces(MOQ)



















