SourcingAI
Try for free
Powered by Made-in-China.com
H20 Formwork for Fast Construction Periods
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Fast Construction Period: Achieve 3-5 days construction period per storey with H20 formwork solutions.
No Crane Required: Machine assistance allows shifting and assembly without crane, saving time.
No Plastering Needed: Smooth surface after removal eliminates the need for additional plastering.
High Load Capacity: Supports 60 KN per square meter ensuring stability and uniform load distribution.
Durable Material: Constructed from high-quality Aluminium alloy 6061-T6 for firmness and longevity.
High Scrap Value: Scrap value is approximately 50% of the new panel cost.
Easy Installation: Workers can easily learn to install and dismantle after a short training period.
ISO and CE Certified: Product meets international safety and quality standards with ISO and CE certification.

Company profile

Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤7.23h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the construction period for this formwork?
A:
The construction period is 3-5 days per storey.
Q:Does this formwork require a crane for installation?
A:
No, it does not require a crane for shifting and assembly.
Q:Is plastering required after removing the formwork?
A:
No, the smooth effect after removal means there is no need to plaster.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:What material is used for the formwork?
A:
The formwork is made of Aluminium alloy 6061-T6.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Panel Formwork for Fast Construction Periods

Panel Formwork for Fast Construction Periods

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com
H20 Timber Beam for Modular Housing Construction Fast Formwork Cycle
Made-in-China.com
H20 Formwork for Efficient Construction Periods

H20 Formwork for Efficient Construction Periods

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com
Modular Table Formwork System for Fast Concrete Slab Construction
Made-in-China.com
Cost-Effective Red Formwork Systems for Fast Wall Construction
Made-in-China.com