Powered by Made-in-China.com
H20 Formwork for Fast Construction Periods
US$50.00-100.001 Square Meter

H20 Formwork for Fast Construction Periods
US$50.00-100.00
1 Square Meter
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearsModel NO.
MPCertification
ISO, CEMaterial
SteelType
Wall FormworkCode
6061-T6Construction Period
5 DaysLoad Capacity
60knAfter Sale Service
AvailableTransport Package
StandardTrademark
MACPEXOrigin
ChinaHS Code
8480411000Production Capacity
50000Key features
Fast Construction Period: Achieve 3-5 days construction period per storey with H20 formwork solutions.
No Crane Required: Machine assistance allows shifting and assembly without crane, saving time.
No Plastering Needed: Smooth surface after removal eliminates the need for additional plastering.
High Load Capacity: Supports 60 KN per square meter ensuring stability and uniform load distribution.
Durable Material: Constructed from high-quality Aluminium alloy 6061-T6 for firmness and longevity.
High Scrap Value: Scrap value is approximately 50% of the new panel cost.
Easy Installation: Workers can easily learn to install and dismantle after a short training period.
ISO and CE Certified: Product meets international safety and quality standards with ISO and CE certification.
Company profile

Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤7.23h
About Our Factory & Business Background
AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the construction period for this formwork?
A:
The construction period is 3-5 days per storey.
Q:Does this formwork require a crane for installation?
A:
No, it does not require a crane for shifting and assembly.
Q:Is plastering required after removing the formwork?
A:
No, the smooth effect after removal means there is no need to plaster.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:What material is used for the formwork?
A:
The formwork is made of Aluminium alloy 6061-T6.
Send Inquiry
*To:
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.*Content:
0/4000
Supplier replies will be sent to your registered email
You may also like
Panel Formwork for Fast Construction Periods
US$50.00-100.00
1 Square Meter(MOQ)
Doka Supplier Lianggong Manufacture H20 Formwork System for Fast Floor Construction
US$55.00-100.00
500 Square Meters(MOQ)
H20 Timber Beam for Modular Housing Construction Fast Formwork Cycle
US$100.00-120.00
500 Square Meters(MOQ)
H20 Formwork for Efficient Construction Periods
US$50.00-100.00
1 Square Meter(MOQ)
Lianggong Reusable Fast Assembly H20 Timber Beam Plywood Panel Wall Formwork for Concrete Pouring and Building Construction
US$68.00-88.00
300 Square Meters(MOQ)
Lianggong Advanced Fast H20 Timber Beam Table Slab Formwork for Concrete Construction
US$60.00-90.00
100 Square Meters(MOQ)
Lianggong Fast Efficient H20 Timber Beam Table Formwork for Building Construction
US$60.00-90.00
100 Square Meters(MOQ)
Modular Table Formwork System for Fast Concrete Slab Construction
US$70.00-90.00
300 Square Meters(MOQ)
Factory H20 Wooden Pine/Spruce Timber Beans for Formwork for Concrete Slab Construction
US$7.00-9.00
300 Meters(MOQ)
Lianggong H20 Timber Beam Table Formwork for Slab Construction
US$290.00-300.00
100 Pieces(MOQ)
H20 Beam Timber Formwork H20 Beam Formwork for Construction Timber Beam Form Formwork Slab Formwork Tunnel Formwork H20 Timber Beam Steel Formwork
US$60.87-100.87
100 Square Meters(MOQ)
Fast Customizable Construction Building Formwork Rapid Clamp for Board
US$1.60-3.00
200 Pieces(MOQ)
Fast Assembly Light-Duty Steel Frame Concrete Wall Formwork Panel OEM Custom Modular Wedge Pin Quick-Release System for Rapid Construction Project
US$70.00-120.00
300 Square Meters(MOQ)
High Quality 1.5m-5.9m H20 Solid Wood Beam Formwork for Slab Concrete Construction
US$5.45-5.91
500 Meters(MOQ)
Cost-Effective Red Formwork Systems for Fast Wall Construction
US$99.00-130.00
100 Square Meters(MOQ)
High Strength Adjustable Drop Head Slab Formwork for Fast Cycling Concrete Construction
US$28.00-30.00
100 Meters(MOQ)
Yellow Wooden Laminated H20 Timber Beam Formwork for Construction
US$4.99-8.99
200 Meters(MOQ)



















