SourcingAI
Try for free
Powered by Made-in-China.com
H20 Formwork for Efficient Construction Periods
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Fast Installation: Workers can easily install and dismantle after short training.
No Plastering Required: Smooth finish eliminates plastering costs after removal.
High Load Capacity: Supports 60 KN per square meter for uniform load distribution.
No Crane Needed: Allows crane to be used for other delayed activities.
Durable Material: Made of firm Aluminium alloy 6061-T6 that prevents bursting.
High Scrap Value: Scrap value is approximately 50% of the new panel price.
Versatile Application: Suitable for walls, stairs, columns, slabs, beams, and more.
ISO and CE Certified: Meets international safety and quality standards.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤5.11h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the construction period per storey?
A:
The construction period is 3-5 days per storey.
Q:Does the formwork require a crane for assembly?
A:
No, it does not require a crane for shifting and assembly.
Q:Is plastering needed after removing the formwork?
A:
No, the smooth effect eliminates the need for plastering.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:What material is used for the formwork?
A:
It is made of Aluminium alloy 6061-T6.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

H20 Formwork for Efficient Construction Works

H20 Formwork for Efficient Construction Works

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com
Durable H20 Timber Beam Formwork for Efficient Concrete Construction
Made-in-China.com
H20 Formwork for Fast Construction Periods

H20 Formwork for Fast Construction Periods

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com
Panel Formwork for Efficient Construction Periods

Panel Formwork for Efficient Construction Periods

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com
Durable Steel Frame Formwork for Efficient Wall Construction
Made-in-China.com