Powered by Made-in-China.com

H20 Formwork for Reliable and Sturdy Construction
US$50.00-100.00
1 Square Meter
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearsModel NO.
MPCertification
ISO, CEMaterial
SteelType
Wall FormworkCode
6061-T6Construction Period
5 DaysLoad Capacity
60knAfter Sale Service
AvailableTransport Package
StandardTrademark
MACPEXOrigin
ChinaHS Code
8480411000Production Capacity
50000Key features
High Load Capacity: Supports 60 KN per square meter for uniform load distribution.
No Plastering Required: Smooth finish eliminates plastering costs after removal.
Crane-Free Assembly: Does not require crane for shifting and assembly.
Fast Construction Period: 3-5 days per storey construction cycle.
Durable Material: Made from Aluminium alloy 6061-T6 for reliability.
High Scrap Value: Scrap value is about 50% of the new panel.
Easy Installation: Workers can learn installation after short training.
ISO and CE Certified: Meets international safety and quality standards.
Company profile
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤4.66h
About Our Factory & Business Background
AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:Does the installation require a crane?
A:
No, it does not require a crane for shifting and assembly.
Q:Is plastering needed after removing the formwork?
A:
No, the smooth effect eliminates the need for plastering.
Q:What is the construction period per storey?
A:
The construction period is 3-5 days per storey.
Q:What is the scrap value of the panels?
A:
The scrap value is about 50% of the new panel.
Send Inquiry
*To:
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Reliable H20 Timber Beam Formwork for Custom Wall Column Construction
US$65.00-80.00
300 Square Meters(MOQ)
Durable H20 Timber Beams From Reliable Formwork Manufacturer for Wall and Column
US$68.00-88.00
100 Square Meters(MOQ)
Lianggong Manufacturer Reliable H20 Timber Beam Formwork for Sturdy Wall and Column Construction
US$60.00-70.00
100 pieces(MOQ)
Lightweight and Sturdy Al65 Formwork for Reliable Building Projects
US$75.00-129.00
100 Square Meters(MOQ)
Reliable Timber Beam for Durable Slab Formwork and Construction Needs
US$6.00-8.00
1,000 Meters(MOQ)
Reliable Construction H20 Timber Beam Wall Formwork for Concrete Wall Pouring
US$90.00-100.00
100 Square Meters(MOQ)
Lianggong Manufacture High-Quality H20 Timber Beam Wall and Column Formwork for Construction
US$90.00-100.00
200 Square Meters(MOQ)
Reliable Sturdy Plastic Formwork for Slab and Column Construction Projects
US$8.90-15.00
100 Pieces(MOQ)
H20 Timber Beam Formwork System for Core Wall and Columns Construction
US$60.87-70.87
100 Meters(MOQ)
Heavy-Duty Formwork for Reliable Construction and Project Execution
US$40.00-50.00
100 Square Meters(MOQ)
Reliable Foundation Formwork for Construction and Engineering Needs
US$40.00-45.00
100 Square Meters(MOQ)
H20 Formwork for Strong and Long-Lasting Construction
US$50.00-100.00
1 Square Meter(MOQ)
Reliable Concrete Formwork for Fast and Easy Construction
US$99.00-119.00
100 Square Meters(MOQ)
Sturdy Lightweight Plastic Formwork for Residential and Industrial Construction
US$8.90-15.00
100 Pieces(MOQ)
Versatile and Sturdy Formwork for All Construction Applications
US$40.00-50.00
100 Square Meters(MOQ)
Lianggong Popular Reliable H20 Timber Beam Formwork for Wall/Column/Slab
US$100.00-200.00
500 Square Meters(MOQ)
Strong Reliable Plastic Formwork for Slab and Beam Construction Projects
US$8.90-15.00
100 Pieces(MOQ)
Construction Adjustable Arced Wall Column Steel Formwork System with H20 Timber Beam and Plywood for Concrete
US$60.00-70.00
100 Meters(MOQ)
Lianggong Table H20 Timber Beam Formwork for Concrete Construction with Steel Prop and Tripod
US$49.00-59.00
100 Square Meters(MOQ)
Advanced Steel Formwork for Reliable Scaffolding and Construction
US$9.00-25.00
50 Pieces(MOQ)



















