H20 Formwork for Strong and Durable Construction
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

No Plastering Required: Smooth surface after removal eliminates the need for additional plastering costs.
High Load Capacity: Supports 60 KN per square meter, ensuring stability and uniform load distribution.
Crane-Free Assembly: Does not require crane assistance for shifting, allowing crane to be used for other tasks.
Fast Construction Speed: Construction period is only 3-5 days per storey for efficient project completion.
High Scrap Value: Scrap value is approximately 50% of the new panel price, offering economic benefits.
Easy Installation: Workers can easily learn to install and dismantle after a short training period.
Durable Material: Made from high-quality Aluminium alloy 6061-T6 for strong and durable construction.
Versatile Application: Perfect for walls, stairs, columns, and slabs with monolithic casting capabilities.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤5.11h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the material of the H20 Formwork?
A:
The formwork is made from high-quality Aluminium alloy 6061-T6.
Q:How long does the construction period take?
A:
The construction period is 3-5 days per storey.
Q:Is crane assistance required for installation?
A:
No, it does not require crane for shifting and assembly, allowing the crane to be used for other activities.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:Do I need to plaster after removing the formwork?
A:
No, there is no need to plaster due to the smooth effect after removing the formwork.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Durable H20 Timber Beam Formwork for Efficient Concrete Construction
Made-in-China.com
Durable Formwork Solutions for Strong Walls and Columns

Durable Formwork Solutions for Strong Walls and Columns

US$75.00-129.00
100 Square Meters(MOQ)
Made-in-China.com
Durable Formwork Systems for Strong Column and Wall Structures
Made-in-China.com
H20 Formwork for Strong and Long-Lasting Construction
Made-in-China.com