Powered by Made-in-China.com

H20 Formwork for Strong and Durable Construction
US$50.00-100.00
1 Square Meter
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearsModel NO.
MPCertification
ISO, CEMaterial
SteelType
Wall FormworkCode
6061-T6Construction Period
5 DaysLoad Capacity
60knAfter Sale Service
AvailableTransport Package
StandardTrademark
MACPEXOrigin
ChinaHS Code
8480411000Production Capacity
50000Key features
No Plastering Required: Smooth surface after removal eliminates the need for additional plastering costs.
High Load Capacity: Supports 60 KN per square meter, ensuring stability and uniform load distribution.
Crane-Free Assembly: Does not require crane assistance for shifting, allowing crane to be used for other tasks.
Fast Construction Speed: Construction period is only 3-5 days per storey for efficient project completion.
High Scrap Value: Scrap value is approximately 50% of the new panel price, offering economic benefits.
Easy Installation: Workers can easily learn to install and dismantle after a short training period.
Durable Material: Made from high-quality Aluminium alloy 6061-T6 for strong and durable construction.
Versatile Application: Perfect for walls, stairs, columns, and slabs with monolithic casting capabilities.
Company profile
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤5.08h
About Our Factory & Business Background
AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the material of the H20 Formwork?
A:
The formwork is made from high-quality Aluminium alloy 6061-T6.
Q:How long does the construction period take?
A:
The construction period is 3-5 days per storey.
Q:Is crane assistance required for installation?
A:
No, it does not require crane for shifting and assembly, allowing the crane to be used for other activities.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:Do I need to plaster after removing the formwork?
A:
No, there is no need to plaster due to the smooth effect after removing the formwork.
Send Inquiry
*To:
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Durable H20 Timber Beams From Reliable Formwork Manufacturer for Wall and Column
US$68.00-88.00
100 Square Meters(MOQ)
Quick Assembly H20 Timber Beam Formwork Solutions Table Formwork for Durable Slab and Beam Construction
US$70.00-80.00
300 Square Meters(MOQ)
China Supplier Lianggong Hot-Selling Advanced Durable H20 Timber Beam Formwork for Construction
US$100.00-200.00
500 Square Meters(MOQ)
Premium Steel Wood Formwork for Durable Wall and Column Construction
US$98.00-105.00
100 Square Meters(MOQ)
Practical Hot Popular Strong Durable Circular H20 Timber Beam Formwork for Construction
US$6.00-10.00
1,000 Meters(MOQ)
Lightweight H20 Timber Beam Formwork for Durable Column Construction
US$90.00-100.00
200 Square Meters(MOQ)
Durable Formwork Systems for Strong Column and Wall Structures
US$75.00-129.00
100 Square Meters(MOQ)
Good Price Wholesale Adjustable Height and Durable Single-Side Bracket Formwork for Wall Construction
US$60.00-70.00
100 Meters(MOQ)
Lianggong Manufacture Modular H20 Timber Beam Formwork for Durable Wall and Column Construction
US$60.00-70.00
100 pieces(MOQ)
Practical Popular Strong Durable Circular H20 Timber Beam Formwork for Construction
US$6.00-10.00
1,000 Meters(MOQ)
Customizable Aluminum Wall Formwork for Strong and Durable Construction
US$99.00-130.00
100 Square Meters(MOQ)
H20 Formwork for Strong and Long-Lasting Construction
US$50.00-100.00
1 Square Meter(MOQ)
Durable Formwork Solutions for Strong Walls and Columns
US$75.00-129.00
100 Square Meters(MOQ)
Adjustable and Durable Plastic Formwork for The Column Construction
US$40.00-45.00
100 Square Meters(MOQ)
Low-Cost Durable Formwork System for Concrete Balances Affordability and Performance in Construction
US$78.00-128.00
500 Square Meters(MOQ)
Durable Steel Formwork for Walls and Columns in Concrete Construction
US$19.99-35.99
100 Pieces(MOQ)
Premium Durable Plastic Formwork for Wall and Column Construction
US$35.00-40.00
100 Pieces(MOQ)
Practical Popular Strong Durable Circular H20 Timber Beam Formwork for Concrete
US$5.45-5.91
500 Meters(MOQ)



















