SourcingAI
Try for free
Powered by Made-in-China.com
H20 Formwork for Strong and Long-Lasting Construction
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Fast Construction Cycle: Installation and dismantling take only 3-5 days per storey with minimal training.
High Load Capacity: Supports 60 KN per square meter ensuring stability and uniform load distribution.
No Plastering Required: Smooth surface after removal eliminates the need for additional plastering costs.
Crane-Free Assembly: Does not require crane assistance for shifting, allowing crane to be used elsewhere.
High Scrap Value: Scrap value is approximately 50% of the new panel cost, offering economic benefits.
Durable Aluminum Material: Made from high-quality 6061-T6 aluminum alloy for firmness and long-lasting use.
Certified Quality: Products hold ISO and CE certifications ensuring safety and compliance standards.
Versatile Application: Suitable for concrete walls, stairs, columns, and monolithic casting solutions.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤5.28h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the construction period for this formwork?
A:
The construction period is 3-5 days per storey, allowing for rapid installation and dismantling.
Q:Does the formwork require a crane for assembly?
A:
No, the system does not require a crane for shifting and assembly, allowing the crane to be used for other activities.
Q:What is the load capacity of the aluminum formwork?
A:
The load capacity is 60 KN per square meter, ensuring good integrality and uniform load distribution.
Q:Is plastering required after removing the formwork?
A:
No, the smooth effect after removing the formwork means there is no need for plastering, saving cleaning and labor costs.
Q:What is the scrap value of the formwork panels?
A:
The scrap value is about 50% of the new panel, providing significant residual value.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

H20 Formwork for Strong and Durable Construction

H20 Formwork for Strong and Durable Construction

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com
Innovative Formwork Solutions for Strong and Long-Lasting Columns
Made-in-China.com
Robust Wall Formwork Solutions for Strong and Lasting Structures
Made-in-China.com
Robust Column Formwork for Quick Setup and Long-Lasting Performance
Made-in-China.com
Premium Heavy Duty Formwork for Long-Lasting Walls and Columns
Made-in-China.com
Versatile and Long-Lasting Formwork for Modern Construction Needs
Made-in-China.com
H20 Formwork for Reliable and Sturdy Construction

H20 Formwork for Reliable and Sturdy Construction

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com