Powered by Made-in-China.com

High Rise Building Formwork at Competitive Prices
US$50.00-100.00
1 Square Meter
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearsModel NO.
MPCertification
ISO, CEMaterial
SteelType
Wall FormworkCode
6061-T6Construction Period
5 DaysLoad Capacity
60knAfter Sale Service
AvailableTransport Package
StandardTrademark
MACPEXOrigin
ChinaHS Code
8480411000Production Capacity
50000Key features
Fast Construction Period: 3-5 days per storey with minimal machine assistance required.
No Plastering Required: Smooth finish after removal eliminates plastering costs.
High Load Capacity: Supports 60 KN per square meter for uniform load distribution.
Durable Material: Made from high-strength Aluminium alloy 6061-T6.
Significant Scrap Value: Scrap value is approximately 50% of the new panel price.
Certified Quality: ISO and CE certified for reliable performance.
Easy Installation: Workers can learn to install and dismantle after short training.
Available After-Sales Service: Professional support available for all formwork systems.
Company profile
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤3.91h
About Our Factory & Business Background
AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the construction period for one storey?
A:
The construction period is 3-5 days per storey.
Q:Do I need a crane for installation?
A:
No, the system does not require a crane for shifting and assembly.
Q:Is plastering required after removing the formwork?
A:
No, the smooth effect after removal means no plastering is needed.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:What material is used for the formwork?
A:
It is made of Aluminium alloy 6061-T6.
Send Inquiry
*To:
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
High Rise Building Aluminum Formwork at Competitive Prices
US$50.00-100.00
1 Square Meter(MOQ)
High Rise Building Formwork at Competitive Rates
US$50.00-100.00
1 Square Meter(MOQ)
Light Weight Aluminum Formwork for High Rise Building by 6061-T6 with Competitive Price
US$50.00-100.00
1 Square Meter(MOQ)
High Rise Building Aluminum Slab Concrete Formwork with Competitive Price
US$50.00-100.00
1 Square Meter(MOQ)
Factory Price Durable Wall Column Steel Formwork for High-Rise Buildings
US$1,000.00-1,200.00
2 Sets(MOQ)
Zulin Construction Steel Formwork Price Flat Form for High-Rise Building
US$3,000.00-10,000.00
10 Sets(MOQ)
Lianggong Climbing Formwork Construction Steel Price Building Material Flat Form for High-Rise with High Quality
US$2,888.00-7,888.00
1 Set(MOQ)
Climbing Construction Steel Formwork Price Flat Form for High-Rise Building
US$3,000.00-10,000.00
10 Sets(MOQ)
Climbing Formwork Construction Steel Price Building Material Flat Form for High-Rise with High Quality
US$2,587.00-2,887.00
10 Meters(MOQ)
Galvanized Steel Waler Beam Formwork Systems Used for High-Rise Buildings
US$168.00-459.00
1 Piece(MOQ)
High-Rise Building Lianggong Factory Price PP Hollow Board Plastic Formwork for Wall and Slab Fomwork
US$10.00-20.00
1,000 Pieces(MOQ)
Customized Climbing Zulin Steel Construction Price Formwork for Sale Flat Form High-Rise Building
US$3,000.00-10,000.00
10 Sets(MOQ)
Lianggong Factory-Price and Easy Assembly Steel Frame Formwork for High-Rise Building Construction
US$1,000.00-1,300.00
50 Tons(MOQ)
Climbing Formwork Zulin Construction Steel Price Building Material Flat Form for High-Rise Factory
US$3,000.00-10,000.00
10 Sets(MOQ)
Hot-Selling High-Rise Building Bridge Construction Cantilever Climbing Formwork with Factory Price
US$1,100.00-1,400.00
1 Set(MOQ)
Concrete Form Steel Metalcantilever Climbing Wall Jump Formwork for High-Rise Building Construction
US$220.00-380.00
200 Square Meters(MOQ)
Aluminum Alloy Formwork - Lightweight for High-Rise Projects Price Cheap
US$13.70-37.80
50 Piece(MOQ)
Concrete Form Cantilever Climbing Jump Formwork for Concrete High-Rise Building Construction
US$220.00-380.00
200 Square Meters(MOQ)



















