SourcingAI
Try for free
Powered by Made-in-China.com
Panel Formwork for Rapid Construction Periods
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Rapid Construction Speed: 3-5 days construction period per storey for efficient project completion.
No Plastering Required: Smooth surface finish eliminates the need for additional plastering costs.
High Load Capacity: Supports 60 KN per square meter ensuring stability and uniform load.
Crane-Free Assembly: Does not require crane for shifting, allowing crane use for other tasks.
High Scrap Value: Scrap value is approximately 50% of the new panel cost.
Durable Aluminum Material: Made from 6061-T6 aluminum alloy, firm enough to prevent bursting.
Easy Installation: Workers can easily learn to install and dismantle after short training.
Versatile Application: Suitable for wall, stair, column, slab, beam, and scaffold construction.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤4.66h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the construction period for this formwork?
A:
The construction period is 3-5 days per storey, allowing for rapid building progress.
Q:Does the formwork require a crane for installation?
A:
No, the system does not require a crane for shifting and assembly, freeing up cranes for other activities.
Q:Is plastering needed after removing the formwork?
A:
No, the smooth effect after removing the formwork means there is no need for plastering.
Q:What is the load capacity of the aluminum formwork?
A:
The load capacity is 60 KN per square meter, ensuring good integrality and uniform load.
Q:What is the scrap value of the formwork panels?
A:
The scrap value is about 50% of the new panel price.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Panel Formwork for Efficient Construction Periods

Panel Formwork for Efficient Construction Periods

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com
Panel Formwork for Quick Construction Periods

Panel Formwork for Quick Construction Periods

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com
Panel Formwork for Fast Construction Periods

Panel Formwork for Fast Construction Periods

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com