SourcingAI
Try for free
Powered by Made-in-China.com
Panel Formwork for Quick Construction Periods
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Quick Construction Period: 3-5 days construction time per storey for faster project completion.
High Load Capacity: Supports 60 KN load per square meter for excellent stability and uniformity.
No Plastering Required: Smooth surface after removal eliminates the need for additional plastering costs.
Crane-Free Assembly: Easy installation and dismantling without requiring crane assistance for shifting.
High Scrap Value: Scrap value is approximately 50% of the new panel price.
Durable Material: Made from Aluminium alloy 6061-T6, firm enough to prevent bursting.
Cost Effective: Saves cleaning costs and prevents concrete waste due to high quality.
Versatile Application: Suitable for walls, columns, stairs, slabs, and beams in modern construction.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤4.66h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the construction period for this formwork?
A:
The construction period is 3-5 days per storey, allowing for quick construction.
Q:What material is the formwork made of?
A:
The formwork is made of Aluminium alloy 6061-T6, which is durable and firm.
Q:Does the installation require a crane?
A:
No, the formwork does not require a crane for shifting and assembly.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter, ensuring good integrality.
Q:Is plastering needed after removing the formwork?
A:
No, the smooth effect after removal means there is no need to plaster.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Panel Formwork for Quick High Rise Building Construction
Made-in-China.com
Panel Formwork for Rapid Construction Periods

Panel Formwork for Rapid Construction Periods

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com
Panel Formwork for Fast Construction Periods

Panel Formwork for Fast Construction Periods

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com