SourcingAI
Try for free
Powered by Made-in-China.com
Peri Aluma Slab Formwork for Concrete Work
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP deck

Certification

ISO, CE

Material

Steel

Type

Slab Formwork

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Ergonomic & Fast Assembly: Low weight panels and systematic sequence facilitate non-tiring, ergonomic, and fast operations.
Reduced Site Material Needs: Early striking with drophead system minimizes on-site material requirements and accelerates deployment.
Easy Maintenance & Cleaning: Powder-coated elements, plastic components, and undercut edges ensure easy cleaning and handling.
Certified Quality & Support: ISO and CE certified with 1-year warranty and available after-sales service for reliability.

Company profile

Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤6.76h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What are the main features of this slab formwork?
A:
It features low weight, compact dimensions, and a systematic assembly sequence for fast, ergonomic operations with easy cleaning.
Q:How does the drophead system benefit construction?
A:
The drophead system allows for early striking, which reduces on-site material requirements and speeds up the deployment of panels for the next storey.
Q:What certifications does the product have?
A:
The product is certified with ISO and CE standards to ensure quality and safety.
Q:What is the warranty period and after-sales service?
A:
We provide a 1-year warranty and available after-sales service to support your project needs.
Q:What is the lead time for shipment?
A:
The average lead time is one month during the peak season, and 1-3 months during the off-season.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Flying Table Formwork with H20 for Deck Concrete Works
Made-in-China.com
Flying Table Slab Formwork with H20 for Deck Concrete Work
Made-in-China.com
Flying Table Formworks Mould with H20 for Deck Concrete Works
Made-in-China.com