Powered by Made-in-China.com
Stair Formworks for Safe and Efficient Construction
US$50.00-100.001 Square Meter

Stair Formworks for Safe and Efficient Construction
US$50.00-100.00
1 Square Meter
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearsModel NO.
MPCertification
ISO, CEMaterial
SteelType
Wall FormworkCode
6061-T6Construction Period
5 DaysLoad Capacity
60knAfter Sale Service
AvailableTransport Package
StandardTrademark
MACPEXOrigin
ChinaHS Code
8480411000Production Capacity
50000Key features
Rapid Construction Cycle: Construction period is 3-5 days per storey for efficient project completion.
No Plastering Required: Smooth finish after removal eliminates the need for additional plastering costs.
Crane-Free Assembly: Does not require crane for shifting and assembly, optimizing crane usage.
High Load Capacity: Supports 60 KN per square meter ensuring stability and uniform load distribution.
Durable Material: Made from firm Aluminium alloy 6061-T6 that prevents bursting and waste.
Easy Installation: Workers can easily learn to install and dismantle after a short training period.
High Scrap Value: Scrap value is approximately 50% of the new panel cost.
1-Year Warranty: Includes a comprehensive 1-year warranty for peace of mind.
Company profile

Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤6.16h
About Our Factory & Business Background
AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the construction period for one storey?
A:
The construction period is 3-5 days per storey.
Q:Does this formwork require a crane for assembly?
A:
No, it does not require a crane for shifting and assembly.
Q:Is plastering needed after removing the formwork?
A:
No, the smooth effect after removing the formwork means there is no need to plaster.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:What material is used for the formwork?
A:
The formwork is made of Aluminium alloy 6061-T6.
Send Inquiry
*To:
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.*Content:
0/4000
Supplier replies will be sent to your registered email
You may also like
Stair Formworks for Easy and Safe Construction Hot Sale From Alurex
US$50.00-100.00
1 Square Meter(MOQ)
Stair Formworks for Easy and Efficient Construction Process
US$50.00-100.00
1 Square Meter(MOQ)
Efficient Reinforced Slab Formwork System for Safe Construction Practices
US$800.00-1,200.00
10 Tons(MOQ)
Stair Formworks for Easy and Safe Construction
US$50.00-100.00
1 Square Meter(MOQ)
Easy and Efficient Modular Construction Steel Shuttering for Wall Slab Stair Concrete Formwork
US$225.00-230.00
200 Square Meters(MOQ)
Stair Formworks for Convenient and Safe Construction by Aluminum Forms
US$50.00-100.00
1 Square Meter(MOQ)
Factory Price Concrete Molding Stair Formwork for Easy and Efficient Concrete Construction
US$225.00-230.00
200 Square Meters(MOQ)
Lianggong Manufacture Advanced Steel Frame Formwork Solutions for Safe and Efficient Construction
US$60.00-70.00
100 Square Meters(MOQ)
Advanced Formwork Options for Safe and Efficient Construction
US$52.00
10 Square Meters(MOQ)
Fineform Factory Price Plywood Shuttering Stair Formwork for Easy and Efficient Concrete Construction
US$225.00-230.00
200 Square Meters(MOQ)
Lianggong Reusable Drophead Slab Formwork for Efficient Concrete Slab and Beam Construction Projects
US$900.00-1,300.00
10 Tons(MOQ)
Lightweight Aluminum Formwork for Efficient Wall and Column Construction
US$118.00-120.00
20 Pieces(MOQ)
Factory Price Stair Formworks for Easy and Efficient Concrete Construction Process
US$225.00-230.00
200 Square Meters(MOQ)
Versatile Concrete Slab Formwork for Sustainable and Efficient Construction
US$85.00-110.00
250 Square Meters(MOQ)
Efficient Plastic Formwork Material for The Engineering and Construction Project
US$40.00-45.00
100 Square Meters(MOQ)
Efficient Slab Formwork for Fast and Level Concrete Floor Construction
US$5.00-10.00
200 Pieces(MOQ)
Efficient Concrete Steel Frame Formwork for Lightweight Wall and Column Construction
US$70.00-75.00
100 Square Meters(MOQ)
Safe High Strength Plastic Formwork for Foundation and Wall Construction Works
US$8.90-15.00
100 Pieces(MOQ)
Light Weight Formwork Systems Offering Safe and Efficient Construction Performance
US$100.00-120.00
500 Square Meters(MOQ)
Durable Building Formwork for Efficient Wall and Column Construction
US$75.00-129.00
100 Square Meters(MOQ)



















