SourcingAI
Try for free
Powered by Made-in-China.com
Stair Formworks for Easy and Efficient Construction Process
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Fast Construction Speed: Construction period is only 3-5 days per storey, significantly accelerating project timelines.
No Plastering Required: Smooth surface after removal eliminates the need for plastering, saving cleaning and material costs.
High Load Capacity: Supports 60 KN per square meter, ensuring stability and preventing formwork shifting.
No Crane Needed: Does not require crane for shifting and assembly, allowing crane to be used for other activities.
High Scrap Value: Scrap value is about 50% of the new panel, offering significant residual economic value.
Durable Aluminum Material: Made from Aluminium alloy 6061-T6, firm enough to prevent bursting and concrete waste.
Easy Installation: Workers can easily learn to install and dismantle after a short period of training.
Certified Quality: Products are certified with ISO and CE standards for reliable performance.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤5.78h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the construction period for this formwork?
A:
The construction period is 3-5 days per storey.
Q:Does the installation require a crane?
A:
No, it does not require a crane for shifting and assembly, allowing the crane to be used for other activities.
Q:Is plastering needed after removing the formwork?
A:
No, there is no need to plaster because the surface is smooth after removing the formwork.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:What is the scrap value of the aluminum formwork?
A:
The scrap value is about 50% of the new panel.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Premium Formwork Systems for Efficient Wall and Column Construction
Made-in-China.com
Stair Formworks for Safe and Efficient Construction

Stair Formworks for Safe and Efficient Construction

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com
Stair Formwork for Safe and Easy Construction

Stair Formwork for Safe and Easy Construction

US$225.00-230.00
200 Square Meters(MOQ)
Made-in-China.com
Stair Formwork for Safe and Easy Construction Hot Sale
Made-in-China.com