Powered by Made-in-China.com

Steel Prop Formwork for High Load-Bearing Capacity
US$50.00-100.00
1 Square Meter
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearsModel NO.
MPCertification
ISO, CEMaterial
SteelType
Wall FormworkCode
6061-T6Construction Period
5 DaysLoad Capacity
60knAfter Sale Service
AvailableTransport Package
StandardTrademark
MACPEXOrigin
ChinaHS Code
8480411000Production Capacity
50000Key features
High Load Bearing: Supports 60 KN load per square meter for stable construction.
Fast Construction: Construction period is 3-5 days per storey with easy installation.
No Plastering Needed: Smooth surface after removal eliminates plastering costs.
High Scrap Value: Scrap value is approximately 50% of the new panel price.
Crane Efficient: No crane required for assembly, saving time and resources.
Durable Material: Made of 6061-T6 aluminum alloy for firmness and longevity.
Certified Quality: Products hold ISO and CE certifications for safety.
After-Sales Support: Available after-sales service and 1-year warranty included.
Company profile
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤3.82h
About Our Factory & Business Background
AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter, ensuring stability and uniform load distribution.
Q:How long does the construction period take?
A:
The construction period is typically 3-5 days per storey.
Q:Is crane assistance required for installation?
A:
No, the system does not require a crane for shifting and assembly, allowing the crane to be used for other activities.
Q:What is the scrap value of the formwork?
A:
The scrap value is about 50% of the new panel price.
Q:Do I need to plaster the concrete after removing the formwork?
A:
No, the smooth effect after removing the formwork means there is no need for plastering, saving costs.
Send Inquiry
*To:
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Lianggong High-Load Capacity and Modular Flying Formwork with High Load Capacity for Modern Buildings
US$70.00-90.00
100 Pieces(MOQ)
Steel Prop Formwork for High Load Capacity
US$50.00-100.00
1 Square Meter(MOQ)
Drop Head Slab Formwork with High Strength and Optimized Load Bearing Capacity
US$900.00-1,300.00
10 Tons(MOQ)
High Load Bearing for Large Scale Civil Building Project Concrete Formwork
US$100.00-120.00
500 Square Meters(MOQ)
Innovative Steel Formwork for Commercial Projects - Strong Load-Bearing Capacity Factory Price
US$13.70-37.80
50 Piece(MOQ)
Good Load Bearing Capacity for Civil Engineering Concrete Formwork
US$100.00-120.00
500 Square Meters(MOQ)
Innovative Steel Formwork for Commercial Projects - Strong Load-Bearing Capacity Hot Sale
US$13.70-37.80
50 Piece(MOQ)
Heavy Load Steel Formwork High Bearing Capacity for Large Foundation Works
US$99.00-130.00
4,999 Pieces(MOQ)
High Load-Bearing Capacity Modular Building Aluminum Formwork for Engineering Construction
US$70.00-100.00
50 Square Meters(MOQ)
Innovative Steel Formwork for Commercial Projects - Strong Load-Bearing Capacity Sell
US$13.70-37.80
50 Piece(MOQ)
High-Load-Bearing Wall and Column Steel Frame Formwork for Precast Structures
US$62.00-65.00
100 Square Meters(MOQ)
High Load Capacity Galvanized Slab U Head Formwork for Concrete Building
US$2.88-3.50
3,000 Pieces(MOQ)
Lianggong Corrosion-Resistant High Load Capacity Concrete Steel Tunnel Slab Formwork for Housing Construction
US$1,000.00-1,200.00
50 Square Meters(MOQ)
H20 Timber Beam Formwork Modular System for Flexible Slab and Wall Construction with High Load Capacity
US$60.00-70.00
1,000 Meters(MOQ)
Low-Cost High Load-Bearing Concrete Molding Steel Frame Plywood Plastic Column Formwork for Construction
US$90.00-180.00
30 Square Meters(MOQ)
Reusable Steel Frame Formwork with High Load-Bearing Capacity for South Africa
US$5.00-10.00
200 Pieces(MOQ)
Steel Prop Formwork for Robust Load Capacity
US$50.00-100.00
1 Square Meter(MOQ)
High Load-Bearing Capacity Custom Scaffolding Prop Green Formwork for Industrial Construction
US$80.00-150.00
300 Square Meters(MOQ)
Low-Cost High Load-Bearing Concrete Mould Steel Frame Plywood Plastic Column Formwork for Construction
US$90.00-180.00
30 Square Meters(MOQ)
Low-Cost High Load-Bearing Concrete Mold Steel Frame Plywood Plastic Column Formwork for Building Construction
US$90.00-180.00
30 Square Meters(MOQ)



















