SourcingAI
Try for free
Powered by Made-in-China.com
Steel Prop Formwork for High Load Capacity
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

High Load Capacity: Supports 60 KN per square meter for stable and uniform load distribution.
Fast Construction: Reduces construction period to 3-5 days per storey with easy installation.
No Plastering Needed: Smooth surface finish eliminates the need for additional plastering costs.
Crane-Free Assembly: Does not require crane for shifting, allowing crane to be used for other tasks.
High Scrap Value: Scrap value is approximately 50% of the new panel cost.
Durable Material: Made from strong aluminum alloy 6061-T6 for firmness and longevity.
Quality Certifications: Certified with ISO and CE standards for reliable performance.
Available After-Sales: Comprehensive after-sales service is available for customer support.

Company profile

Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤6.47h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter, ensuring good integrality and uniform load.
Q:How long does the construction period take?
A:
The construction period is 3-5 days per storey.
Q:Is crane assistance required for installation?
A:
No, it does not require crane for shifting and assembly, allowing the crane to be used for other activities.
Q:What is the scrap value of the formwork?
A:
The scrap value is about 50% of the new panel.
Q:Do I need to plaster after removing the formwork?
A:
No, there is no need to plaster due to the smooth effect after removing the formwork.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Steel Prop Formwork for Robust Load Capacity

Steel Prop Formwork for Robust Load Capacity

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com
Steel Prop Formwork for High Load-Bearing Capacity

Steel Prop Formwork for High Load-Bearing Capacity

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com