SourcingAI
Try for free
Powered by Made-in-China.com
Metal Kitchen Shelf Storage Two Tier Dish Rack Dish Drying Counter Storage
US$15.00
500-999 Pieces
US$14.20
1,000-1,999 Pieces
US$12.68
2,000+ Pieces
Sample price:US$19.50/piece.Request sample

Product profile

Material

Iron

Usage

Kitchenware Storage

Number of Layers

Two

Model NO.

KO-016

Feature

Two Tier

Design

Two Tier

Packaging

Single

Color

White/Black

Size

Medium

Shape

Common

Brand

OEM

Weight

3.216kg

Transport Package

Carton

Specification

52.5*28*38cm

Trademark

OEM

Origin

Zhejiang China

HS Code

3924100000

Production Capacity

50000sets/Year

Key features

Durable Iron Construction: Made of high-quality iron material for long-lasting kitchenware storage.
Two-Tier Design: Efficient two-layer structure maximizes counter space for dish drying.
OEM & ODM Services: Professional design team supports full customization and flexible orders.
100% Quality Inspection: Every item undergoes strict QC inspection to ensure low defect rates.
Fast Sample Delivery: Samples are ready for shipment within 5-7 days after confirmation.
Flexible Payment Terms: Accepts 30% T/T deposit with balance before shipment or via LC.
60-Day Quality Warranty: Comprehensive warranty coverage for 60 days after shipment.
Compact Medium Size: Dimensions 52.5*28*38cm fit standard kitchen counters perfectly.

Company profile

Market Union Co. Ltd.
Market Union Co. Ltd.Zhejiang, China
Business Type: Trading Company

About Our Factory & Business Background

Address12F, Building B10(East Area), No. 2560, Yongjiang Avenue, Yinzhou District, Ningbo, Zhejiang, China.

Our Production Capability & Technical Expertise

Main ProductsN/A

Product Q&A

Q:Can you accept small quantity orders with custom designs?
A:
Yes, we have a professional design team and own warehouse, allowing us to support low MOQ and different categories.
Q:How do you control product quality?
A:
We have our own QC team that inspects every item and order, providing reports for confirmation with 100% inspection to ensure low defects.
Q:What is the delivery time for samples and bulk orders?
A:
Samples take about 5-7 days. Bulk orders typically take 30 days after receiving the deposit and confirming all details.
Q:What are your payment terms?
A:
We usually accept 30% T/T in advance and 70% before shipment or against copy of BL, though terms can be negotiated.
Q:What is the process for placing an order?
A:
The process includes sample approval, 30% deposit or LC, PP sample approval, shipping arrangement, document preparation, balance payment, and final document release.

Send Inquiry

*To:Market Union Co. Ltd.Market Union Co. Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Metal Wire Dish Drying Rack with Utensil Holder
Made-in-China.com