Powered by Made-in-China.com
Quick-Assembly Kwikstage Scaffolding for Fast Construction Schedules
US$6.50
500 Pieces
Sample price:US$0.50/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
Online Technical SupportWarranty
1Model NO.
HTXD-0001Material
Q235/Q355b/SteelType
FixedStructural Style
Soffit ScaffoldingFramework
Frame Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
Single Row ScaffoldingErection Position
External ScaffoldingMove Method
Attached Lifting ScaffoldingScaffolding Part Type
Scaffolding PropsConstruction Properties
Building ScaffoldStandard
A250/A500Application
ConstructionPerformance Level
High StrengthEngineering Solutions
Graphic DesignDesign Style
ModernScaffold Rail
Scaffold BoardsUsed Scaffolding
Used ScaffoldingSurface Treatment
Hop Dipped GalvanizationTransport Package
Steel PalletSpecification
48.3*3.2mm/48.3*2.5mmOrigin
ChinaHS Code
7308900000Production Capacity
100000tons/YearCompany profile

Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2009-07-01Nearest Port: TIANJINAverage Response Time: ≤2.61hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, FCA, EXW, Others
AI-Powered supplier vetting
SummaryHainan Huatongxinda Trade Co., Ltd. is identified as both a trading company and manufacturer/factory in China, with a factory in Hebei. It reports more than 10 production lines, 41–50 quality-control staff, 50 years of combined R&D-engineer experience, and access to a testing center with more than 80 test equipment sets. Its product scope covers scaffolding and multiple steel and pipeline products, with stated customization according to customer designs. The supplier lists numerous management-system certifications and supports several quotation and payment terms. Export sales are reported at 71%–90%, with exporting activity beginning in 2009. However, the provided evidence does not establish after-sales procedures, financial credibility, or verified customer case depth. Trade records shown cover three transactions with one associated buyer and one destination country.
Supplier typeThe supplier is explicitly classified as both a trading company and manufacturer/factory. Its stated business combines industrial and trading operations, including scaffolding, steel pipes, and pipeline products.
CertificationsThe supplier lists a broad portfolio of management-system certifications, including ISO 9001, ISO 14001, ISO 14000, ISO 29001, ISO 13485, TS 16949, ASME, BSCI, and others. The slice confirms the certifications are claimed, but does not provide certificate numbers, validity dates, or scope details.
Production capacityThe supplier reports abundant production capacity, full equipment, a professional production team, more than 10 production lines, and 41–50 quality-control staff. It also states that an affiliated testing center has more than 80 sets of test equipment, supporting production-quality verification.
Customization capabilityThe supplier explicitly states that its scaffolding and pipeline-related products can be customized according to customers’ special designs and requirements. No details are provided on engineering review, prototype development, minimum order requirements, or customization lead times.
Send Inquiry
*To:
Hainan Huatongxinda Trade Co., Ltd.
Hainan Huatongxinda Trade Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
OEM Custom Aluminium Galvanised Quick Stage Kwikstage Kwik Stage Scaffold Scaffolding System for Industrial Construction
US$650.00-800.00
10 Pieces(MOQ)
Sturdy Modular Ringlock Quick Assembly Scaffolding for Masonry Construction
US$3.00-20.00
100 Pieces(MOQ)
Quick Assembly Modular Multi-Directional Ringlock Scaffolding for Residential Building Construction
US$3.00-20.00
100 Pieces(MOQ)
Aluminum Movable Scaffolding for Quick Assembly of The Facade Is Used for Building Construction Platforms
US$300.00-600.00
1 Piece(MOQ)
Hot DIP Galvanized Ringlock Scaffolding Systems Fast Assembly Scaffold Materials for Construction
US$100.00-200.00
20 Sets(MOQ)
Reliable Fast Assembly Q235 Q355 Modern Ringlock Scaffolding for Construction Decoration
US$650.00-800.00
10 Pieces(MOQ)
Welded Ringlock Scaffolding Fast Assembly Q345 Building System for Construction
US$6.50
500 Pieces(MOQ)
Quick Assembly Painted Steel H Frame Ladder Scaffolding for Construction
US$20.00-35.00
1,000 Pieces(MOQ)
Reliable Quick Assembly Lightweight Aluminum Ringlock Scaffolding for Construction
US$650.00-800.00
10 Pieces(MOQ)
Fast Assembly Commercial Grade Site Safety Scaffolding for Bridge Construction Projects
US$15.00-20.00
1,000 Pieces(MOQ)
Reliable ODM Quick Assembly Cuplock Scaffolding Tower System for Construction
US$1,100.00-1,350.00
20 Tons(MOQ)
Durable Kwikstage Quicklock Metal Scaffolding System for Sale Quick Setup Brand New and Used Scaffolding for Construction
US$1,020.00-1,180.00
49 Tons(MOQ)
Quick Assembly Ringlock Scaffolding System for Bridge Construction
US$800.00-1,400.00
20 Tons(MOQ)
Long Service Life Modular Ringlock Quick Assembly Scaffolding for Masonry Construction
US$3.00-20.00
100 Pieces(MOQ)
Reliable Scaffolding Solutions with Quick Setup for Fast-Paced Construction Sites
US$5.00-30.00
20 Tons(MOQ)
Fast Assembly Commercial Grade Site Safety Scaffolding for Building Construction Works
US$15.00-20.00
1,000 Pieces(MOQ)



















