Powered by Made-in-China.com
1-50MW Waste to Energy Power Plant EPC
Shandong, ChinaRunh Power Corp., Ltd.
1-50MW Waste to Energy Power Plant EPC
US$1,000,000.00
1 Piece
Product profile
Voltage
380VGenerating Methods
Thermal Power GenerationPhase
Three PhaseModel NO.
RUNH-WTETransport Package
Standard PackingSpecification
1-50mwTrademark
RUNHOrigin
ChinaHS Code
8402119000Production Capacity
2 Projects/YearCompany profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 19 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤15h
About Our Factory & Business Background
AddressBlock C, Yinfeng Fortune Plaza, No. 1 Longao West Road, Lixia District, Jinan, Shandong, China
Plant Area3636 square meters
Number of Employees167
Registered Capital80,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months, 6-12 months, more than 12 months Off Season Lead Time: 3-6 months, 6-12 months, more than 12 months
Minimum Order Quantity1 Set
Supply Chain Partners120
Our Production Capability & Technical Expertise
Main ProductsPower Plant, Steam Turbine, Boiler, Energy Boiler, Power Plant EPC Contractor, Power Plant Turnkey Contractor, Generator, Combined Cycle Power Plant, Biomass Power Plant, Coal-Fired Power Plant
QA/QC inspectors9 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers25 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2004-04-14
Main MarketsSouth America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Domestic
Repeat Buyers Choice30%~50%
Annual Export Revenue35,000,000 USD
Number of Foreign Trading Staff84
Overseas Agent/BranchYes
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500Yes
Send Inquiry
*To:
Runh Power Corp., Ltd.
Runh Power Corp., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Municipal Waste to Energy Plant to Generate Electricity 20 MW 30 MW 50MW 100MW 130MW 165MW 200MW
US$1,000,000.00
1 Piece(MOQ)
Municipal Solid Waste Power Plant Biopower 30MW 35 MW 40 MW 50MW
US$1,000,000.00
1 Piece(MOQ)
CNG to Power Plant 500kw
US$99,999.00
1 Set(MOQ)
Biomass Energy Power Plant From Agricultural Waste Bagasse
US$1,000,000.00
1 Piece(MOQ)
1-10MW Sugarcane Bagasse Power Plant EPC Contractor
US$1,000,000.00
1 Piece(MOQ)
1MW Gas Piston Power Plant Installation
US$99,999.00
1 Set(MOQ)
Horizontal Tubular/ Water Turbine/ Hydro Turbine/Power Plant
US$99,999.00
1 Piece(MOQ)
500kw Bio CNG Plant
US$99,999,999.00
1 Set(MOQ)
Coal Fire Steam Turbine Power Plant 6 MW 12 MW 20 MW 25MW 100MW 125MW 200 MW
US$1,000,000.00
1 Piece(MOQ)
Coal to Fire Power Plant 20 MW 30 MW 50 MW 100MW 200MW 300MW Ethiopia
US$1,000,000.00
1 Piece(MOQ)
40MW Used Gas Turbine for Data Center Fast Track
US$3,000,000.00-5,000,000.00
1 Set(MOQ)
Indonesia Coal Fired Power Plant EPC Contractor
US$1,000,000.00
1 Piece(MOQ)
Coal-Fired Power Plants with a Capacity Ranging From 10 to 300 Megawatts for Electricity Generation
US$1,000,000.00
1 Piece(MOQ)
Wheat Straw Biomass Generator Thermal Electricity Generation System Power Plant
US$1,000,000.00
1 Piece(MOQ)
Chinese Contractor of Thermal Power Plant Project
US$1,000,000.00
1 Piece(MOQ)
100MW- 300MW Used Gas Turbine
US$25,000,000.00-50,000,000.00
1 Set(MOQ)
Thermal Power Plant Equipment Supplier
Negotiable
1 Piece(MOQ)
China EPC Constractor for High Efficiency and Low Power Consumption Thermal Power Plant
US$1,000,000.00
1 Piece(MOQ)
Mini Water Turbine for Mini Hydro Power Station
US$100.00
1 Piece(MOQ)



















