SourcingAI
Try for free
Powered by Made-in-China.com
Back Pressure Steam Turbine with Generator
US$1,000,000.00
1 Piece

Product profile

Voltage

420

Generating Methods

Thermal Power Generation

Phase

Three Phase

Model NO.

RUNH

Capacity

1MW~60MW

Speed

3000r/M; 5600r/M; 6500r/M

Inlet Steam Pressure

3.43MPa~8.83MPa

Inlet Temperature

435c~535c

Maximum Inlet Steam Quantity

100tph~500tph

Cooling Type

Air Cooling/ Water Cooling

First Stage Extraction Steam Pressure

0.49MPa~3.92MPa

First Extraction Steam Qualtity

35tph~150tph

Second Stage Extraction Steam Pressure

0.196MPa~1.57MPa

Secondary Extraction Steam Qualtity

40tph~150tph

Transport Package

Standard Packing

Specification

1MW~50MW

Trademark

Runh power

Origin

China

HS Code

8402119000

Production Capacity

20/Year

Key features

Customizable Capacity & Pressure: Capacity 1-60MW, Inlet Pressure 3.43-8.83MPa, Temperature 435-535C.
Flexible Extraction Options: First/Second stage extraction pressure and quantity fully adjustable.
Hydraulic & DEH Governing: Fully hydraulic and DEH governing system for sensitive and smooth running.
EPC & Turnkey Service: Complete equipment supply including STG, BTG, BOP for various power projects.
Global After-Sales Support: One-to-one service, periodic visiting, and global maintenance team.
Competitive Delivery Time: Guaranteed schedule via design institute, preferential OEM manufacturing, and local branches.
Second-Hand Equipment Service: Renovation, retrofit, relocation, and upgrade with same guarantee as new equipment.
Proven International Experience: Over 100 international projects in Turkey, Ukraine, India, etc., with 20 years development.

Company profile

Runh Power Corp., Ltd.
Years of Export ExperienceExperienced TeamExhibition ExperienceManagement Certification
Runh Power Corp., Ltd.Shandong, China
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 19 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤15h

About Our Factory & Business Background

AddressBlock C, Yinfeng Fortune Plaza, No. 1 Longao West Road, Lixia District, Jinan, Shandong, China
Plant Area3636 square meters
Number of Employees167
Registered Capital80,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months, 6-12 months, more than 12 months Off Season Lead Time: 3-6 months, 6-12 months, more than 12 months
Minimum Order Quantity1 Set
Supply Chain Partners120

Our Production Capability & Technical Expertise

Main ProductsPower Plant, Steam Turbine, Boiler, Energy Boiler, Power Plant EPC Contractor, Power Plant Turnkey Contractor, Generator, Combined Cycle Power Plant, Biomass Power Plant, Coal-Fired Power Plant
QA/QC inspectors9 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers25 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2004-04-14
Main MarketsSouth America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Domestic
Repeat Buyers Choice30%~50%
Annual Export Revenue35,000,000 USD
Number of Foreign Trading Staff84
Overseas Agent/BranchYes
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500Yes

Product Q&A

Q:What is the MOQ for this steam turbine?
A:
The Minimum Order Quantity is 1 Set.
Q:What are the payment terms?
A:
We accept LC (Letter of Credit) and T/T (Telegraphic Transfer).
Q:What is the lead time for delivery?
A:
Lead time varies by season: Peak season is 3-6 months, 6-12 months, or more than 12 months. Off-season is 3-6 months, 6-12 months, or more than 12 months.
Q:Can the product be customized?
A:
Yes, we offer customization from samples, designs, and full customization. Capacity, speed, pressure, and temperature are adjustable.
Q:What is the warranty period?
A:
We provide a guarantee period for second-hand equipment that is the same as that for new equipment. Specific warranty details for new units should be confirmed upon order.

Send Inquiry

*To:Runh Power Corp., Ltd.Runh Power Corp., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

CHP Back Pressure Steam Turbine

CHP Back Pressure Steam Turbine

Negotiable
1 Piece(MOQ)
Made-in-China.com
Used15MW Back Pressure Steam Turbine Price

Used15MW Back Pressure Steam Turbine Price

US$300,000.00-500,000.00
1 Set(MOQ)
Made-in-China.com
Extraction Back Pressure Steam Turbine
Made-in-China.com
12MW Used Back Pressure Steam Turbine Price

12MW Used Back Pressure Steam Turbine Price

US$250,000.00-400,000.00
1 Set(MOQ)
Made-in-China.com
Industrial Back Pressure Steam Turbine
Made-in-China.com
7MW Used Back Pressure Steam Turbine Price

7MW Used Back Pressure Steam Turbine Price

US$100,000.00-250,000.00
1 Set(MOQ)
Made-in-China.com
Back Pressure Steam Turbine Power Plant
Made-in-China.com
CNG to Power Plant 500kw

CNG to Power Plant 500kw

US$99,999.00
1 Set(MOQ)
Made-in-China.com