Powered by Made-in-China.com

CHP Back Pressure Steam Turbine
Shandong, ChinaRunh Power Corp., Ltd.
CHP Back Pressure Steam Turbine
Negotiable
1 Piece
Product profile
Phase
Three PhaseCapacity
1.5mw~30mwSpeed
3000r/M; 5600r/M; 6500r/MModel NO.
steam turbineInlet Steam Pressure
2.35mpa~8.83mpaInlet Temperature
390c~535cMaximum Inlet Steam Quantity
15tph~550tphCooling Type
Air Cooling/ Water CoolingExhaust Steam Pressure
0.294mpa~3.92mpaTransport Package
Standard PackingSpecification
1MW~60MWOrigin
ChinaHS Code
8402119000Production Capacity
20/YearKey features
Wide Capacity Range: Capacity adjustable from 1.5MW to 30MW to suit various project scales.
Flexible Speed Options: Available speeds include 3000, 5600, and 6500 RPM for diverse applications.
Customizable Parameters: Inlet pressure, temperature, and exhaust pressure are fully customizable.
EPC Turnkey Service: Complete equipment supply and EPC services for coal, biomass, and waste heat plants.
Professional Design Team: 50 experienced engineers provide proposals for power projects of various sizes.
Competitive Delivery: Guaranteed delivery time through prioritized manufacturing and local branches.
Global After-Sales Support: One-to-one service, periodic visits, and a global maintenance team.
Second-Hand Equipment: Renovated units with shorter construction periods and same warranty as new.
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 19 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤15h
About Our Factory & Business Background
AddressBlock C, Yinfeng Fortune Plaza, No. 1 Longao West Road, Lixia District, Jinan, Shandong, China
Plant Area3636 square meters
Number of Employees167
Registered Capital80,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months, 6-12 months, more than 12 months Off Season Lead Time: 3-6 months, 6-12 months, more than 12 months
Minimum Order Quantity1 Set
Supply Chain Partners120
Our Production Capability & Technical Expertise
Main ProductsPower Plant, Steam Turbine, Boiler, Energy Boiler, Power Plant EPC Contractor, Power Plant Turnkey Contractor, Generator, Combined Cycle Power Plant, Biomass Power Plant, Coal-Fired Power Plant
QA/QC inspectors9 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers25 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2004-04-14
Main MarketsSouth America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Domestic
Repeat Buyers Choice30%~50%
Annual Export Revenue35,000,000 USD
Number of Foreign Trading Staff84
Overseas Agent/BranchYes
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500Yes
Product Q&A
Q:What is the capacity range of the CHP Back Pressure Steam Turbine?
A:
The capacity ranges from 1.5MW to 30MW, allowing for customization based on specific project requirements.
Q:What types of power plants can this turbine be used for?
A:
It is applicable for coal-fired, biomass, CCPP, waste heat, and new energy power plants, serving as a cogeneration steam turbine.
Q:Does Runh Power provide EPC or turnkey services?
A:
Yes, Runh Power is an EPC contractor and complete equipment supplier, offering turnkey services for various power projects.
Q:What is the minimum order quantity (MOQ)?
A:
The minimum order quantity is 1 set.
Q:What are the payment terms?
A:
Payment terms include LC (Letter of Credit) and T/T (Telegraphic Transfer).
Send Inquiry
*To:
Runh Power Corp., Ltd.
Runh Power Corp., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
7MW Used Back Pressure Steam Turbine Price
US$100,000.00-250,000.00
1 Set(MOQ)
Extraction Back Pressure Steam Turbine
Negotiable
1 Piece(MOQ)
Used15MW Back Pressure Steam Turbine Price
US$300,000.00-500,000.00
1 Set(MOQ)
Industrial Back Pressure Steam Turbine
US$150,000.00
1 Piece(MOQ)
Adjustable Blades Kaplan Turbine for Power House
Negotiable
1 Piece(MOQ)
7.5MW Used Back Pressure Steam Turbine Price
US$100,000.00-200,000.00
1 Set(MOQ)
Back Pressure Steam Turbine with Generator
US$1,000,000.00
1 Piece(MOQ)
12MW Used Back Pressure Steam Turbine Price
US$250,000.00-400,000.00
1 Set(MOQ)
Back Pressure Steam Turbine Power Plant
Negotiable
1 Piece(MOQ)
Kaplan Turbine Generator Unit for Hydro Power Project
Negotiable
1 Piece(MOQ)
Single Crystal Turbine Blade for Advanced Aircraft and Steam Engines
US$50.00
10 Pieces(MOQ)
Hydropower Station Impact Type Runner, Francis Runner, Pipeline Turbine, Distributor
US$20,000.00-50,000.00
1 Piece(MOQ)
OEM Nickel Alloy Turbine Impeller Hastelloy W Nickel Aviation Patrs
US$50.00
10 Pieces(MOQ)
Micro Water Turbine/ Small Hydro Turbine (300W-50kw type)
US$280.00-9,600.00
1 Piece(MOQ)
Titanium Turbine Impeller Wheel for Industrial Machinery Engine Parts Custom Manufacture
US$50.00
10 Pieces(MOQ)
Double Nozzle Mincro Turgo Turbine
Negotiable
1 Piece(MOQ)
Coal to Fire Power Plant 20 MW 30 MW 50 MW 100MW 200MW 300MW Ethiopia
US$1,000,000.00
1 Piece(MOQ)
Coal Fire Steam Turbine Power Plant 6 MW 12 MW 20 MW 25MW 100MW 125MW 200 MW
US$1,000,000.00
1 Piece(MOQ)
CNG to Power Plant 500kw
US$99,999.00
1 Set(MOQ)



















