SourcingAI
Try for free
Powered by Made-in-China.com
Double Extraction Condensing Steam Turbine Power Station
Negotiable
1 Piece

Product profile

Voltage

1000kV

Generating Methods

Hydroelectric Power Generation

Phase

Three Phase

Model NO.

steam turbine

Capacity

12mw~60mw

Speed

3000r/M; 5600r/M; 6500r/M

Inlet Steam Pressure

3.43mpa~8.83mpa

Inlet Temperature

435c~535c

Maximum Inlet Steam Quantity

100tph~500tph

Cooling Type

Air Cooling/ Water Cooling

First Stage Extraction Steam Pressure

0.49mpa~3.92mpa

First Extraction Steam Qualtity

35tph~150tph

Second Stage Extraction Steam Pressure

0.196mpa~1.57mpa

Secondary Extraction Steam Qualtity

40tph~150tph

Transport Package

Standard Packing

Specification

1MW~60MW

Trademark

Runh power

Origin

China

HS Code

8402119000

Production Capacity

20/Year

Key features

18 Years Industry Experience: 18 years of development in power projects across Turkey, Ukraine, and India.
Full EPC Turnkey Service: Complete equipment supply including STG, BTG, BOP for various power plant types.
Customizable Capacity: Capacity is customizable from 12MW to 60MW based on project requirements.
Flexible Speed Options: Speed is customizable with options for 3000r/M, 5600r/M, and 6500r/M.
Adjustable Steam Parameters: Inlet steam pressure and temperature are customizable within specified ranges.
Versatile Cooling Types: Cooling type is customizable, offering both Air Cooling and Water Cooling options.
OEM and ODM Services: Full customization available from samples, designs, or complete OEM/ODM support.
Professional Design Institute: Backed by a professional design institute ensuring high-quality engineering solutions.

Company profile

Runh Power Corp., Ltd.
Years of Export ExperienceExperienced TeamExhibition ExperienceManagement Certification
Runh Power Corp., Ltd.Shandong, China
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 19 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤15h

About Our Factory & Business Background

AddressBlock C, Yinfeng Fortune Plaza, No. 1 Longao West Road, Lixia District, Jinan, Shandong, China
Plant Area3636 square meters
Number of Employees167
Registered Capital80,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months, 6-12 months, more than 12 months Off Season Lead Time: 3-6 months, 6-12 months, more than 12 months
Minimum Order Quantity1 Set
Supply Chain Partners120

Our Production Capability & Technical Expertise

Main ProductsPower Plant, Steam Turbine, Boiler, Energy Boiler, Power Plant EPC Contractor, Power Plant Turnkey Contractor, Generator, Combined Cycle Power Plant, Biomass Power Plant, Coal-Fired Power Plant
QA/QC inspectors9 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers25 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2004-04-14
Main MarketsSouth America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Domestic
Repeat Buyers Choice30%~50%
Annual Export Revenue35,000,000 USD
Number of Foreign Trading Staff84
Overseas Agent/BranchYes
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500Yes

Product Q&A

Q:What is the typical capacity range for this turbine?
A:
The capacity is customizable, ranging from 12MW to 60MW depending on specific project needs.
Q:Does the supplier offer EPC services?
A:
Yes, Runh Power provides EPC/turnkey services and complete equipment for various power projects.
Q:What are the available speed options?
A:
Speed is customizable with options including 3000r/M, 5600r/M, and 6500r/M.
Q:Is OEM or ODM service available?
A:
Yes, both OEM and ODM services are available, including full customization from samples or designs.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 set.

Send Inquiry

*To:Runh Power Corp., Ltd.Runh Power Corp., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

CNG to Power Plant 500kw

CNG to Power Plant 500kw

US$99,999.00
1 Set(MOQ)
Made-in-China.com
Industrial Power Station Upgrading and Rebuilding
Made-in-China.com
1MW Gas Piston Power Plant Installation
Made-in-China.com
500kw Bio CNG Plant

500kw Bio CNG Plant

US$99,999,999.00
1 Set(MOQ)
Made-in-China.com
40MW Used Gas Turbine for Data Center Fast Track

40MW Used Gas Turbine for Data Center Fast Track

US$3,000,000.00-5,000,000.00
1 Set(MOQ)
Made-in-China.com
Thermal Power Plant Equipment Supplier
Made-in-China.com
100MW- 300MW Used Gas Turbine

100MW- 300MW Used Gas Turbine

US$25,000,000.00-50,000,000.00
1 Set(MOQ)
Made-in-China.com
Second Hand/Used Steam Turbine Power Plant
Made-in-China.com