Powered by Made-in-China.com
Extraction Condensing Steam Turbine
Shandong, ChinaRunh Power Corp., Ltd.
Extraction Condensing Steam Turbine
US$1,000,000.00
1 Piece
Product profile
Voltage
380VGenerating Methods
Thermal Power GenerationPhase
Three PhaseModel NO.
RUNHCapacity
12MW~200MWSpeed
3000r/M; 5600r/M; 6500r/MInlet Steam Pressure
3.43MPa~8.83MPaInlet Temperature
435c~535cMaximum Inlet Steam Quantity
100tph~500tphCooling Type
Air Cooling/ Water CoolingFirst Stage Extraction Steam Pressure
0.49MPa~3.92MPaFirst Extraction Steam Qualtity
35tph~150tphSecond Stage Extraction Steam Pressure
0.196MPa~1.57MPaSecondary Extraction Steam Qualtity
40tph~150tphTransport Package
Standard PackingSpecification
1MW~660MWTrademark
RUNHOrigin
ChinaHS Code
8402119000Production Capacity
20/YearKey features
Customizable Capacity & Parameters: Capacity 12-200MW, Speed 3000-6500r/M, Pressure 3.43-8.83MPa, Temp 435-535C.
Flexible Operating Modes: Runs under extraction or pure condensing conditions with adjustable thermal/electric loading.
Advanced Governing System: Features fully hydraulic and DEH governing system for sensitive and smooth running.
EPC Turnkey Service: Complete equipment supply including STG, BTG, BOP for coal, biomass, CCPP, and waste heat plants.
Professional Design Institute: 50 experienced engineers provide proposals for power projects of various sizes.
Competitive Delivery Guarantee: Guaranteed schedule via design priority, OEM cooperation, local branches, and expert teams.
Global After-Sales Support: One-to-one service, periodic visits, customer documents, and global maintenance team.
Second-Hand Equipment Options: Renovation, relocation, upgrade, and energy-saving proposals with same warranty as new units.
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 19 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤18h
About Our Factory & Business Background
AddressBlock C, Yinfeng Fortune Plaza, No. 1 Longao West Road, Lixia District, Jinan, Shandong, China
Plant Area3636 square meters
Number of Employees167
Registered Capital80,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months, 6-12 months, more than 12 months Off Season Lead Time: 3-6 months, 6-12 months, more than 12 months
Minimum Order Quantity1 Set
Supply Chain Partners120
Our Production Capability & Technical Expertise
Main ProductsPower Plant, Steam Turbine, Boiler, Energy Boiler, Power Plant EPC Contractor, Power Plant Turnkey Contractor, Generator, Combined Cycle Power Plant, Biomass Power Plant, Coal-Fired Power Plant
QA/QC inspectors9 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers25 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2004-04-14
Main MarketsSouth America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Domestic
Repeat Buyers Choice30%~50%
Annual Export Revenue35,000,000 USD
Number of Foreign Trading Staff84
Overseas Agent/BranchYes
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500Yes
Product Q&A
Q:What is the customizable capacity range?
A:
The capacity can be customized from 12MW to 200MW.
Q:Does the turbine support extraction or condensing modes?
A:
Yes, it can run under extraction or pure condensing operating conditions.
Q:What types of power plants are supported?
A:
It supports coal-fired, biomass, CCPP, waste heat, and new energy power plants.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 Set.
Q:What are the payment terms?
A:
Payment terms include LC (Letter of Credit) and T/T (Telegraphic Transfer).
Send Inquiry
*To:
Runh Power Corp., Ltd.
Runh Power Corp., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Used 330MW Extraction Steam Turbine for Power Plant, Data Center
US$3,000,000.00-6,000,000.00
1 Set(MOQ)
Double Extraction Condensing Steam Turbine
US$1,000,000.00-1,500,000.00
1 Piece(MOQ)
25MW Used Extraction Steam Turbine Price
US$500,000.00-700,000.00
1 Set(MOQ)
Double Extraction Condensing Steam Turbine Power Station
Negotiable
1 Piece(MOQ)
Hydropower Station Impact Type Runner, Francis Runner, Pipeline Turbine, Distributor
US$20,000.00-50,000.00
1 Piece(MOQ)
Single Crystal Turbine Blade for Advanced Aircraft and Steam Engines
US$50.00
10 Pieces(MOQ)
Used 18MW Extraction Steam Turbine for Power Plant
US$400,000.00-600,000.00
1 Set(MOQ)
High Quality Extraction Condensing Steam Turbine
Negotiable
1 Piece(MOQ)
3MW Used Extraction Steam Turbine Price
US$70,000.00-150,000.00
1 Set(MOQ)
Mini Water Turbine for Mini Hydro Power Station
US$100.00
1 Piece(MOQ)
Kaplan Turbine Unit/Axial Flow Turbine
US$99,999.00
1 Piece(MOQ)
High-Precision CNC Machined Gas Turbine Wheel Components for Generators
US$50.00
10 Pieces(MOQ)
Francis Turbine / Hydro Francis Turbine / Water Turbine
Negotiable
1 Set(MOQ)
Inconel 722 High Dimensional Accuracy Turbine Compressor Wheel Billet Aviation Wheels
US$50.00
10 Pieces(MOQ)
Adjustable Blades Kaplan Turbine for Power House
Negotiable
1 Piece(MOQ)
Coal Fire Steam Turbine Power Plant 6 MW 12 MW 20 MW 25MW 100MW 125MW 200 MW
US$1,000,000.00
1 Piece(MOQ)
Coal to Fire Power Plant 20 MW 30 MW 50 MW 100MW 200MW 300MW Ethiopia
US$1,000,000.00
1 Piece(MOQ)
CNG to Power Plant 500kw
US$99,999.00
1 Set(MOQ)



















