Powered by Made-in-China.com
High Quality and Efficient Back Pressure Steam Turbines Power Plants
US$1,000,000.00
1 Piece
Sample price:US$1000000.00/piece.Request sample
Product profile
Voltage
380VGenerating Methods
Thermal Power GenerationPhase
Three PhaseModel NO.
Power plantPower
10MW - 100MWFuel
Coal, Gas, Oil, Biaboss etcCustomerized
AvailableTransport Package
Standard PackingSpecification
15mw POWERTrademark
RUNHOrigin
ChinaHS Code
8402119000Production Capacity
100/ YearKey features
High Efficiency Turbines: Back pressure steam turbines with power range 10MW-100MW and voltage 380V.
Flexible Fuel Options: Supports Coal, Gas, Oil, and Biomass for versatile thermal power generation.
Full EPC Turnkey Service: Complete design, construction, installation, and equipment supply for power plants.
28 Years Experience: Proven track record with over 20 international projects in Turkey, Ukraine, and India.
Competitive Delivery: Guaranteed schedule via dedicated design institute and prioritized OEM manufacturing.
Global After-Sales Support: One-to-one service, periodic visits, and global maintenance team to reduce risks.
Second-Hand Equipment: Renovated units with shorter construction periods and same warranty as new equipment.
Customizable Power: Power output is customizable from 10MW to 100MW based on customer requirements.
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 19 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤15h
About Our Factory & Business Background
AddressBlock C, Yinfeng Fortune Plaza, No. 1 Longao West Road, Lixia District, Jinan, Shandong, China
Plant Area3636 square meters
Number of Employees167
Registered Capital80,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months, 6-12 months, more than 12 months Off Season Lead Time: 3-6 months, 6-12 months, more than 12 months
Minimum Order Quantity1 Set
Supply Chain Partners120
Our Production Capability & Technical Expertise
Main ProductsPower Plant, Steam Turbine, Boiler, Energy Boiler, Power Plant EPC Contractor, Power Plant Turnkey Contractor, Generator, Combined Cycle Power Plant, Biomass Power Plant, Coal-Fired Power Plant
QA/QC inspectors9 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers25 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2004-04-14
Main MarketsSouth America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Domestic
Repeat Buyers Choice30%~50%
Annual Export Revenue35,000,000 USD
Number of Foreign Trading Staff84
Overseas Agent/BranchYes
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500Yes
Product Q&A
Q:What is the power capacity range?
A:
The power plant capacity ranges from 10MW to 100MW, with general plant capacity up to 1000 MW.
Q:What fuels can be used?
A:
The system supports multiple fuel types including Coal, Gas, Oil, and Biomass.
Q:What is the warranty period?
A:
We provide a one-year warranty period for the equipment.
Q:Do you offer EPC services?
A:
Yes, we provide professional EPC/turnkey services including design, construction, installation, and complete equipment supply.
Q:What is the lead time for delivery?
A:
Lead time varies by season: 3-6 months off-peak, 6-12 months peak, or more than 12 months for complex projects.
Send Inquiry
*To:
Runh Power Corp., Ltd.
Runh Power Corp., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Power Generation Project Plant with High Pressure Steam Turbine
US$1,000,000.00
1 Piece(MOQ)
Steam Turbine Generator Set Power Plant
Negotiable
1 Piece(MOQ)
CNG to Power Plant 500kw
US$99,999.00
1 Set(MOQ)
Steam Turbine Power Plants 10MW 20 MW 30 MW 50MW 100MW
US$1,000,000.00
1 Piece(MOQ)
Coal Fire Steam Turbine Power Plant 6 MW 12 MW 20 MW 25MW 100MW 125MW 200 MW
US$1,000,000.00
1 Piece(MOQ)
1MW Gas Piston Power Plant Installation
US$99,999.00
1 Set(MOQ)
Horizontal Tubular/ Water Turbine/ Hydro Turbine/Power Plant
US$99,999.00
1 Piece(MOQ)
500kw Bio CNG Plant
US$99,999,999.00
1 Set(MOQ)
Coal to Fire Power Plant 20 MW 30 MW 50 MW 100MW 200MW 300MW Ethiopia
US$1,000,000.00
1 Piece(MOQ)
Competitive Price Agricultural Waste Coal-Fired Steel Structure Power Plant
US$1,000,000.00
1 Piece(MOQ)
100MW- 300MW Used Gas Turbine
US$25,000,000.00-50,000,000.00
1 Set(MOQ)
Reference: 51MW Lignite Coal-Firing Power Plant in Turkey
Negotiable
1 Piece(MOQ)
Philippines Coal Fired Biomass Thermal Power Plant EPC
US$1,000,000.00
1 Piece(MOQ)
Wheat Straw Biomass Generator Thermal Electricity Generation System Power Plant
US$1,000,000.00
1 Piece(MOQ)
Wheat Straw Thermal Electricity Generation System Biomass Generatorbiomass Generator Power Plant
US$1,000,000.00
1 Piece(MOQ)
40MW Used Gas Turbine for Data Center Fast Track
US$3,000,000.00-5,000,000.00
1 Set(MOQ)
China EPC Constractor for High Efficiency and Low Power Consumption Thermal Power Plant
US$1,000,000.00
1 Piece(MOQ)
Mini Water Turbine for Mini Hydro Power Station
US$100.00
1 Piece(MOQ)
High-Precision CNC Machined Gas Turbine Wheel Components for Generators
US$50.00
10 Pieces(MOQ)



















