SourcingAI
Try for free
Powered by Made-in-China.com
Steam Turbine Generator Set Power Plant
Negotiable
1 Piece

Product profile

Voltage

10kV

Generating Methods

Thermal Power Generation

Phase

Three Phase

Model NO.

RUNH

Capacity

25MW~1000MW

OEM

Yes

Customerized

Yes

Fuel

Biomass and Coal

Transport Package

Standard Packing

Specification

1MW-660MW

Trademark

RUNH

Origin

China

HS Code

8402119000

Production Capacity

7-8/Year

Key features

Customizable Capacity: Capacity ranges from 25MW to 1000MW to match specific project needs.
OEM and ODM Services: Full customization available from samples or designs with OEM/ODM support.
Fuel Flexibility: Supports biomass and coal fuel sources for diverse power generation.
Experienced Design Team: 50 professional engineers provide proposals for power projects of various sizes.
Competitive Delivery: Guaranteed delivery time through optimized design, manufacturing, and local branches.
Comprehensive After-Sales: Includes one-to-one service, periodic visits, and global maintenance teams.
Second-Hand Equipment: Renovated units with shorter construction periods and same guarantee as new.
Global Project Experience: Over 20 international projects delivered in Turkey, Ukraine, India, and more.

Company profile

Runh Power Corp., Ltd.
Years of Export ExperienceExperienced TeamExhibition ExperienceManagement Certification
Runh Power Corp., Ltd.Shandong, China
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 19 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤15h

About Our Factory & Business Background

AddressBlock C, Yinfeng Fortune Plaza, No. 1 Longao West Road, Lixia District, Jinan, Shandong, China
Plant Area3636 square meters
Number of Employees167
Registered Capital80,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months, 6-12 months, more than 12 months Off Season Lead Time: 3-6 months, 6-12 months, more than 12 months
Minimum Order Quantity1 Set
Supply Chain Partners120

Our Production Capability & Technical Expertise

Main ProductsPower Plant, Steam Turbine, Boiler, Energy Boiler, Power Plant EPC Contractor, Power Plant Turnkey Contractor, Generator, Combined Cycle Power Plant, Biomass Power Plant, Coal-Fired Power Plant
QA/QC inspectors9 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers25 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2004-04-14
Main MarketsSouth America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Domestic
Repeat Buyers Choice30%~50%
Annual Export Revenue35,000,000 USD
Number of Foreign Trading Staff84
Overseas Agent/BranchYes
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500Yes

Product Q&A

Q:What is the capacity range for the Steam Turbine Generator Set?
A:
The capacity is customizable from 25MW to 1000MW.
Q:Do you offer OEM and ODM services?
A:
Yes, we provide full customization from samples or designs, along with OEM and ODM services.
Q:What types of fuel can this power plant use?
A:
The system supports both biomass and coal as fuel sources.
Q:How many engineers are in your design institute?
A:
We have 50 experienced and professional engineers dedicated to power plant systems.
Q:What is the lead time for delivery?
A:
Lead time varies by season: 3-6 months, 6-12 months, or more than 12 months.

Send Inquiry

*To:Runh Power Corp., Ltd.Runh Power Corp., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Steam Turbine Generator Set Power Plant
Made-in-China.com
CNG to Power Plant 500kw

CNG to Power Plant 500kw

US$99,999.00
1 Set(MOQ)
Made-in-China.com
1MW Gas Piston Power Plant Installation
Made-in-China.com
500kw Bio CNG Plant

500kw Bio CNG Plant

US$99,999,999.00
1 Set(MOQ)
Made-in-China.com
40MW Used Gas Turbine for Data Center Fast Track

40MW Used Gas Turbine for Data Center Fast Track

US$3,000,000.00-5,000,000.00
1 Set(MOQ)
Made-in-China.com
100MW- 300MW Used Gas Turbine

100MW- 300MW Used Gas Turbine

US$25,000,000.00-50,000,000.00
1 Set(MOQ)
Made-in-China.com
Thermal Power Plant Equipment Supplier
Made-in-China.com
Chinese Contractor of Thermal Power Plant Project
Made-in-China.com