SourcingAI
Try for free
Powered by Made-in-China.com
Efficient Counterflow Spray Tower for Reducing So2 Emissions Effectively
US$600.00-7,500.00
1 Piece

Product profile

Customization

Available

Condition

New

Certification

ISO, CE

Model NO.

LYPL-5000

Automation

Automatic

Treatment

Chemical Treatment

Product Name

Spray Tower

Keywords

Spray Tower Scrubber

Specifications

φ1200*3500mm

Air Volume

5000m³/H

Power

2.2kw

Efficiency

99%

Transport Package

Standard Packaging or Customized

Specification

Standard Specifications or Customized

Origin

Hebei, Chian

Production Capacity

50000pieces/Year

Key features

High SO2 Removal Efficiency: Achieves up to 99% efficiency in removing SO2 and particulates through counter-current scrubbing.
Energy-Efficient Design: Features low-energy pumps and variable drives to minimize power consumption and operational costs.
Compact Footprint: Vertical tower design minimizes space requirements while maintaining full treatment capacity.
Easy Maintenance Access: Equipped with inspection doors, walkways, and quick-disconnect parts to reduce downtime.
Advanced Spray Nozzles: Precision nozzles ensure uniform liquid distribution, optimal droplet size, and clog resistance.
12-Month Warranty: Covers mechanical defects from materials or manufacturing for 12 months from port arrival.
Multi-Level Technical Support: Offers 7x24 remote support, spare parts shipping, and optional on-site engineer service.
Flexible Customization: Supports full customization, minor customization, and customization from samples or designs.

Company profile

Botou Lingyue Environmental Protection Equipment Co., Ltd
Importers and ExportersIn-stock CapacityFast DeliveryQuality Assurance
CertifiedBusiness Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤0.70h

About Our Factory & Business Background

Address30-2 North Outer Ring Hardware Trade City, Botou City, Cangzhou, Hebei, China
Plant Area1900 square meters
Number of Employees14
Registered Capital800,000 RMB
Terms of PaymentLC, T/T, PayPal, D/P, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, EXW, CFR
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 set
Supply Chain Partners5

Our Production Capability & Technical Expertise

Main Productsspray tower, welding fume extractor, industrial dust collector, dust filter bag, filter cage, dust collector
Production MachinesWelding machine, Plate shearing machine, Bending machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2017-12-22
Main MarketsSoutheast Asia, Eastern Asia, Mid East
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:How do I request a quote and place an order?
A:
Request a quote via website, email, or direct contact. Provide product info, working conditions, and configuration needs. After confirmation, we issue a Proforma Invoice (PI) for payment and production arrangements.
Q:Can an order be modified or canceled after confirmation?
A:
Changes before production are usually accommodated. If materials are procured or production started, changes or cancellation may incur costs and require negotiation.
Q:What payment methods do you accept?
A:
We accept Telegraphic Transfer (T/T) with 30% deposit and 70% pre-shipment. Other negotiable methods include PayPal, bank drafts, etc. We do not accept Letters of Credit (L/C).
Q:How long after payment is shipment arranged?
A:
Standard products ship in 5-7 business days after full payment. Customized products have a separate production cycle confirmed before shipment.
Q:What shipping methods do you offer, and how is freight calculated?
A:
We offer sea freight (FCL/LCL), railway, and multimodal transport. Freight is calculated based on cargo volume, weight, destination, and method, detailed in the PI.

Send Inquiry

*To:Botou Lingyue Environmental Protection Equipment Co., LtdBotou Lingyue Environmental Protection Equipment Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Spray Tower for Industrial Chemical Emissions

Spray Tower for Industrial Chemical Emissions

US$999.00-19,999.00
1 Piece(MOQ)
Made-in-China.com