SourcingAI
Try for free
Powered by Made-in-China.com
Formwork System Tie Rod Steel Water Stop/Water Stopper/Water Barrier for Peri
US$0.40-2.00
2,000 Pieces
Sample price:US$0.50/piece.Request sample

Product profile

Customization

Available

Application

Formwork Accessories

Certification

ISO, SGS

Model NO.

SLM

Surface Treatment

Natural, Eg, HDG

Technics

Casting

Material

Ductile Casted Iron Qt450-10

Type

Fasteners

Colour

Self Color (Black), Silver Galvanized or C

Scaffolding Part Type

Formwork Accessories

Delivery Time

20 to 30 Days Deponds on Quantity

Standard

European, American, Australian Standards

Service

OEM Is Available. Samples Are Vailable

Transport Package

Samll Woven Bag and Ton Bag, Customized Package Is

Specification

0.5/0.55/0.6/0.65/0.7

Trademark

SHLOM

Origin

China

HS Code

730840

Production Capacity

100000PCS/Month

Key features

Ductile Iron Material: Made from Ductile Casted Iron Qt450-10 for superior strength and durability.
Multiple Surface Options: Available in Natural, Self Color (Black), Silver Galvanized, or HDG finishes.
OEM/ODM Customization: Full OEM and ODM services available based on customer ideas, samples, or drawings.
ISO and SGS Certified: Product quality certified by ISO and SGS standards for global reliability.
Wide Application Scope: Suitable for wall, slab, column, climbing, and slip formwork as well as scaffolding.
Multiple Weight Variants: Available in 500g, 550g, 600g, and 650g weights to meet specific needs.
Fast Production Time: Standard delivery within 20 to 30 days after receiving down payment.
Global Market Experience: Serving customers in Europe, America, Australia, Middle East, and South Africa since 2008.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2008-08-08Nearest Port: Qingdao,China, Tianjin,ChinaAverage Response Time: ≤24hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW, Others

About Our Factory & Business Background

AddressNo. 4931 Beihai Road, Weifang, Shandong, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork Accessories, Scaffolding Accessories, Shoring Prop/Steel Prop, Ringlock Scaffolding, Kwikstage Scaffolding, Frame Scaffolding, Swivel Nut/Wing Nut/Anchor Nut, Formwork Steel Clamp, Scaffolding Coupler, Push Pull Prop

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What materials are used for the tie rod?
A:
The tie rod is made of Ductile Casted Iron Qt450-10.
Q:What surface treatments are available?
A:
We offer Natural, Self Color (Black), Silver Galvanized, and HDG surface treatments.
Q:Do you offer OEM or ODM services?
A:
Yes, we provide full OEM and ODM services based on your ideas, samples, or drawings.
Q:What is the standard delivery time?
A:
Production typically takes 20 to 30 days after receiving the down payment.
Q:What certifications does the product have?
A:
The product holds ISO and SGS certifications.

Send Inquiry

*To:Shandong Shlomi Machinery Co., Ltd.Shandong Shlomi Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Formwork Concrete Tie Rod Water Stop /Water Barrier
Made-in-China.com
Powerful Ceiling Fasteners Nails for Ceiling Gun
Made-in-China.com