SourcingAI
Try for free
Powered by Made-in-China.com
Formwork System Tie Rod Steel Water Stop/Water Stopper/Water Barrier
US$0.40-2.00
2,000 Pieces
Sample price:US$0.50/piece.Request sample

Product profile

Customization

Available

Application

Formwork Accessories

Certification

ISO, SGS

Model NO.

SLM

Surface Treatment

Natural, Eg, HDG

Technics

Casting

Material

Ductile Casted Iron Qt450-10

Type

Fasteners

Colour

Self Color (Black), Silver Galvanized or C

Scaffolding Part Type

Formwork Accessories

Delivery Time

20 to 30 Days Deponds on Quantity

Standard

European, American, Australian Standards

Service

OEM Is Available. Samples Are Vailable

Transport Package

Samll Woven Bag and Ton Bag, Customized Package Is

Specification

0.5/0.55/0.6/0.65/0.7

Trademark

SHLOM

Origin

China

HS Code

730840

Production Capacity

100000PCS/Month

Key features

Customizable Color Options: Available in Self Color (Black), Silver Galvanized, or Customized Color.
OEM and ODM Services: Professional R&D team designs and manufactures products based on customer ideas, samples, or drawings.
Durable Material Quality: Made from Ductile Casted Iron Qt450-10 with Casting technics for superior strength.
Multiple Surface Treatments: Options include Natural, EG, and HDG to suit various environmental needs.
Wide Application Scope: Suitable for wall, slab, column, climbing, and slip formwork as well as scaffolding.
International Standards Compliance: Meets European, American, and Australian standards for global reliability.
Certified Product Quality: ISO and SGS certified with strict quality control from raw material to pre-packing.
Flexible Delivery Schedule: Production time is 20-30 days depending on quantity and order specifics.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2008-08-08Nearest Port: Qingdao,China, Tianjin,ChinaAverage Response Time: ≤24hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW, Others

About Our Factory & Business Background

AddressNo. 4931 Beihai Road, Weifang, Shandong, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork Accessories, Scaffolding Accessories, Shoring Prop/Steel Prop, Ringlock Scaffolding, Kwikstage Scaffolding, Frame Scaffolding, Swivel Nut/Wing Nut/Anchor Nut, Formwork Steel Clamp, Scaffolding Coupler, Push Pull Prop

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What materials are used for the tie rod?
A:
The tie rod is made of Ductile Casted Iron Qt450-10 using Casting technics.
Q:Can the color be customized?
A:
Yes, we offer Self Color (Black), Silver Galvanized, or customized colors.
Q:Do you offer OEM or ODM services?
A:
Yes, our R&D team can design and make OEM/ODM products according to your ideas, samples, or drawings.
Q:What is the delivery time?
A:
Production typically takes 20 to 30 days depending on the quantity ordered.
Q:What certifications does the product have?
A:
The product is certified under ISO and SGS standards.

Send Inquiry

*To:Shandong Shlomi Machinery Co., Ltd.Shandong Shlomi Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Powerful Ceiling Fasteners Nails for Ceiling Gun
Made-in-China.com