Powered by Made-in-China.com
Coupler Scaffolding Clamp for Tube and Fitting Scaffolding Structures
US$670.00
5-49 Tons
US$660.00
50+ Tons
Product profile
Customization
AvailableAfter-sales Service
ProvideWarranty
1 YearMaterial
SteelType
MobileStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Floor Type ScaffoldingLapping Form
Full ScaffoldingErection Position
External ScaffoldingMove Method
Integral Lifting ScaffoldingScaffolding Part Type
Scaffolding PropsConstruction Properties
Building ScaffoldProduct Name
Ringlock Scaffolding CouplerSurtace Finish
Galvanised, PaintedApplication
Decorations, ConstructionsFeature
High Load-Bearing CapacityTransport Package
StandardSpecification
CustomizableTrademark
/Origin
ChinaKey features
High Load-Bearing Capacity: Designed for heavy-duty applications in construction and decoration projects.
Customization Available: Offers full, minor, and flexible customization options based on specific designs.
Durable Steel Material: Constructed from high-quality steel with galvanised or painted surface finishes.
1 Year Warranty: Includes a comprehensive 1-year warranty period for product reliability.
After-Sales Service: Dedicated after-sales support provided for all scaffolding systems.
Fast Lead Time: Production completed within 15 working days for both peak and off-peak seasons.
Large Production Capacity: Annual output exceeds 100,000 tons to meet large-scale construction demands.
Global Export Experience: Products exported to Turkey, UK, Russia, Indonesia, and other international markets.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 2 years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤1.68h CertifiedTerms of Payment: T/T
AI-Powered supplier vetting
SummaryHebei Shuangtai Mould and Scaffolding Technology Co., Ltd. is identified as an Asian scaffolding manufacturer offering cup-lock, bowl-lock, plate-type, and disc-type scaffolding. It reports customization capability, available SDK support, CAD-based R&D, inventory capability, and lead times within 15 working days in both peak and off-season periods. However, the investigation identifies substantial documentation and control gaps: no raw-material traceability, finished-product checks performed by packing staff with random inspection, no written service-capability procedures or corrective-action records, no written customer-complaint procedures, and no R&D audit documentation. The supplier has one R&D engineer and three quality inspectors. It has no overseas agents, branches, warehouse, or showroom, and no offline trade-show participation. Financial-capacity indicators are present for 2023–2025, but the slices do not provide sufficient detail to assess financial strength. No certification evidence or...
Supplier typeThe supplier’s stated business scope covers construction-related metal structures, mechanical components, steel products, metal products, building materials, and hardware, while its listed core products are four scaffolding types. The legal name and representative title also identify it as a scaffolding manufacturer.
After-Sales capabilityAfter-sales and service controls appear weakly documented: there are no written customer-complaint procedures or records, no written service-capability assessment or corrective-action procedures, and no overseas agents, branches, warehouse, or showroom. The supplier does report inventory capability and accepts FOB, CIF, and EXW service quotations, but this does not establish effective after-sales support.
R&D capabilityThe supplier reports an available SDK, CAD capability, and one R&D engineer whose responsibilities include adapting product length, thickness, and shape to customer requirements. However, no design-input, output, review, verification, or validation documentation is available for audit, limiting evidence of a mature innovation system.
Customization capabilityThe supplier explicitly reports full, minor, flexible, and design-based customization, and its R&D engineer adjusts product length, thickness, and shape according to customer requirements. CAD is used for R&D, although the absence of auditable design documentation reduces confidence in formal customization control.
Product Q&A
Q:What customization options are available?
A:
We offer full customization, minor customization, and flexible customization based on your specific designs.
Q:What is the warranty period for the scaffolding?
A:
The product comes with a 1-year warranty coverage.
Q:How long does it take to produce an order?
A:
The average lead time is within 15 working days, regardless of whether it is peak or off-peak season.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 28 tons.
Q:What payment terms do you accept?
A:
We accept payment via T/T (Telegraphic Transfer).
Send Inquiry
*To:
Hebei Shuangtai Mould Frame Technology Co., Ltd
Hebei Shuangtai Mould Frame Technology Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
BS1139 Scaffolding Tubes Fittings Materials Parts Cross Swivel Clamp for Scaffolding Tubular
US$1.20-2.10
1,000 Pieces(MOQ)
Scaffolding Couplers and Clamps Light Weight Scaffold Fitting Swivel Clamp
US$1.62-1.76
1,000 Pieces(MOQ)
Easy Installing 105 Range C Frame Clamp for Tube and Fittings
US$3.90-3.96
800 Pieces(MOQ)
Best Load Capacity Masonry Construction Tube and Fittings Stee Tubular Scaffolding Clamp
US$1.00-2.00
1,000 Pieces(MOQ)
Heavy-Duty Scaffold Tube Coupler Swivel Clamp for Secure Scaffolding Structures
US$0.90
5,000 Pieces(MOQ)
Steel Galvanized Single Scaffolding Coupler Tube Pipe Fitting Half Coupler Clamp for Construction
US$2.82-2.85
1,000 Pieces(MOQ)
BS1139 Scaffolding Clamp, Tube and Clamp Scaffold, Pipe Clamp Fittings Scaffolding
US$1.20-2.10
1,000 Pieces(MOQ)
Scaffolding Tube and Fittings fastener Double Couplers Fixed Clamps BS 1139
US$0.90-1.50
100 Pieces(MOQ)
Factory Swivel Coupler and Double Coupler Scaffolding Clamps for Scaffolding Construction Material
US$1.20-2.10
1,000 Pieces(MOQ)
Steel Scaffolding Components Swivel Coupler and Clamp for Scaffold Building
US$5.00-60.00
100 Pieces(MOQ)
Drop Forged T Bolt with Nut and Washer for Scaffolding Clamp &Coupler
US$0.75-2.00
2,000 Pieces(MOQ)
Pressed Steel Scaffold Clamp for Secure and Fast Tube Connection
US$660.00-670.00
5 Tons(MOQ)
Secure Scaffold Tube Swivel Coupler Durable Clamp for Scaffolding Applications
US$0.90
5,000 Pieces(MOQ)
Pressed Steel Factory Swivel Coupler and Double Coupler Scaffolding Clamps for Scaffolding Construction Material
US$1.20-2.10
1,000 Pieces(MOQ)
Flexible British Standard Drop Forged Double Swivel Scaffolding Coupler Clamp for Oil and Gas Project
US$0.50-1.20
100 Pieces(MOQ)



















