Powered by Made-in-China.com
Drop Forged Cuplock Vertical Cuplock Scaffolding Standard Formwork Building Fitting Scaffold Accessories
US$2.66
1,500-1,799 Pieces
US$2.54
1,800-1,999 Pieces
US$2.42
2,000+ Pieces
Sample price:US$2.66/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
ProvideWarranty
1 YearsModel NO.
Cuplock Scaffold StandardApplication
Construction MaterialCertification
ISOSurface Treatment
YesTechnics
ForgedMaterial
SteelType
Scaffold FramesSurface Treatment Type
PaintedProduct Name
Cuplock Scaffolding StandardCustomzation
AvailableProject Type
Decorations, ConstructionsFeaturw
High Load- Bearing CapacilyStructural Form
Multi-Pole ScaffoldingArchitectural Approach
Combined ScaffoldingSupport Method
Full ScaffoldingSetting Method
External ScaffoldingMovement Method
Integral Lifting ScaffoldingScaffolding Parts
Scaffolding StandardTransport Package
Standard PackagingSpecification
CustomizableTrademark
/Origin
ChinaProduction Capacity
5000000Key features
High Load-Bearing Capacity: Designed for heavy-duty construction applications with superior strength.
Customization Available: Offers full customization, minor customization, and flexible customization options.
ISO Certified Quality: Manufactured with ISO certification ensuring high quality standards.
Forged Steel Construction: Made from Q235 steel with forged technics for durability.
Painted Surface Treatment: Features painted surface treatment for corrosion resistance.
1-Year Warranty: Comes with a 1-year warranty covering mechanical defects.
After-Sales Service: Dedicated after-sales service provided for customer support.
Large Stock Availability: Maintains large stock for immediate delivery needs.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 2 years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤0.66h CertifiedTerms of Payment: T/T
AI-Powered supplier vetting
SummaryHebei Shuangtai Mould and Scaffolding Technology Co., Ltd. is identified as an Asian scaffolding manufacturer offering cup-lock, bowl-lock, plate-type, and disc-type scaffolding. It reports customization capability, available SDK support, CAD-based R&D, inventory capability, and lead times within 15 working days in both peak and off-season periods. However, the investigation identifies substantial documentation and control gaps: no raw-material traceability, finished-product checks performed by packing staff with random inspection, no written service-capability procedures or corrective-action records, no written customer-complaint procedures, and no R&D audit documentation. The supplier has one R&D engineer and three quality inspectors. It has no overseas agents, branches, warehouse, or showroom, and no offline trade-show participation. Financial-capacity indicators are present for 2023–2025, but the slices do not provide sufficient detail to assess financial strength. No certification evidence or...
Supplier typeThe supplier’s stated business scope covers construction-related metal structures, mechanical components, steel products, metal products, building materials, and hardware, while its listed core products are four scaffolding types. The legal name and representative title also identify it as a scaffolding manufacturer.
After-Sales capabilityAfter-sales and service controls appear weakly documented: there are no written customer-complaint procedures or records, no written service-capability assessment or corrective-action procedures, and no overseas agents, branches, warehouse, or showroom. The supplier does report inventory capability and accepts FOB, CIF, and EXW service quotations, but this does not establish effective after-sales support.
R&D capabilityThe supplier reports an available SDK, CAD capability, and one R&D engineer whose responsibilities include adapting product length, thickness, and shape to customer requirements. However, no design-input, output, review, verification, or validation documentation is available for audit, limiting evidence of a mature innovation system.
Customization capabilityThe supplier explicitly reports full, minor, flexible, and design-based customization, and its R&D engineer adjusts product length, thickness, and shape according to customer requirements. CAD is used for R&D, although the absence of auditable design documentation reduces confidence in formal customization control.
Product Q&A
Q:What is the warranty period?
A:
We provide a 1-year warranty for this scaffolding product.
Q:Is customization available?
A:
Yes, we offer full customization, minor customization, and flexible customization options based on designs.
Q:What material is used?
A:
The product is made of Q235 steel with forged technics.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 28 tons.
Q:What is the lead time for delivery?
A:
The average lead time is within 15 workdays for both peak and off-peak seasons.
Send Inquiry
*To:
Hebei Shuangtai Mould Frame Technology Co., Ltd
Hebei Shuangtai Mould Frame Technology Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Robust Cast Cuplock Scaffolding Forged Ledger Blade Scaffold Accessories for Civil Construction Works
US$0.128-0.14
21,739 Pieces(MOQ)
Premium HDG Finished Cuplock Scaffolding Forged Ledger Blade Scaffold Accessories Made of Quality Cast Steel
US$0.128-0.14
21,739 Pieces(MOQ)
Drop Forged HDG Finished Scaffolding U Head Jack Construction Site Fitting Scaffold Accessories
US$4.42-4.92
859 Pieces(MOQ)
En74 Standard Board Clamp Scaffold Accessories in Building with Wedge Lock System Scaffolding
US$0.643
2,750 Pieces(MOQ)
Forged Swivel Coupler Scaffold Accessories Used in Construction
US$1.00-3.00
1,000 Pieces(MOQ)
Early Stripping Support Slab Formwork Scaffolding Early Striking Head Jacks Prop Accessories
US$7.70-8.10
500 Pieces(MOQ)
Early Form Removal Support Striking Drop Head Steel Shuttering Shoring Accessories for Slab Formwork
US$7.70-8.10
500 Pieces(MOQ)
Adjustable Support Early Stripping Form Drop Head Steel Prop Accessories for Slab Formwork Concrete Mould
US$7.70-8.10
500 Pieces(MOQ)
Early Form Removal Adjustable Support Striking Drop Head Steel Prop Accessories for Slab Formwork
US$7.70-8.10
500 Pieces(MOQ)
Wedge Pin, Wedge Bolt, , Aluminium Formwork Accessories
US$0.01
10,000 Pieces(MOQ)
Malleable Iron Key Clamp Fence Pipe Fitting Accessories
US$1.00-10.00
100 Pieces(MOQ)
Wall Formwork Accessories for Construction
US$0.02
1 Piece(MOQ)



















