Powered by Made-in-China.com
Durable and Adaptable Scaffolding Parts for Construction Projects
US$600.00
1-27 Tons
US$592.00
28+ Tons
Sample price:US$0.00/piece.Request sample
Product profile
Customization
AvailableFinish
GalvanizedMaterial
SteelModel NO.
Scaffolding PartsType
Scaffolding AccessoriesProduct Name
Scaffolding AccessoriesApplication
Decorations, ConstructionsFeature
Cost Effective, No Welding, High Quality,etcKeywords
Scaffolding PartsSample
AvailableTransport Package
Standard PackagingSpecification
CustomizableTrademark
/Origin
ChinaKey features
Galvanized Finish: Provides superior corrosion resistance for long-lasting durability in various environments.
High-Quality Steel: Manufactured from premium steel materials ensuring structural integrity and safety.
No Welding Required: Designed for easy assembly without welding, saving time and labor costs on site.
Full Customization: Offers flexible customization options including designs, minor, and full customization.
Cost Effective: Provides high quality at a competitive price point for construction projects.
Fast Lead Time: Peak and off-peak season lead times are both within 15 workdays for quick delivery.
Samples Available: Product samples are available for customers to verify quality before bulk orders.
Strict Quality Control: Features random visual inspections by 3 dedicated QA/QC inspectors before shipping.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 2 years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤0.61h CertifiedTerms of Payment: T/T
AI-Powered supplier vetting
SummaryHebei Shuangtai Mould and Scaffolding Technology Co., Ltd. is identified as an Asian scaffolding manufacturer offering cup-lock, bowl-lock, plate-type, and disc-type scaffolding. It reports customization capability, available SDK support, CAD-based R&D, inventory capability, and lead times within 15 working days in both peak and off-season periods. However, the investigation identifies substantial documentation and control gaps: no raw-material traceability, finished-product checks performed by packing staff with random inspection, no written service-capability procedures or corrective-action records, no written customer-complaint procedures, and no R&D audit documentation. The supplier has one R&D engineer and three quality inspectors. It has no overseas agents, branches, warehouse, or showroom, and no offline trade-show participation. Financial-capacity indicators are present for 2023–2025, but the slices do not provide sufficient detail to assess financial strength. No certification evidence or...
Supplier typeThe supplier’s stated business scope covers construction-related metal structures, mechanical components, steel products, metal products, building materials, and hardware, while its listed core products are four scaffolding types. The legal name and representative title also identify it as a scaffolding manufacturer.
After-Sales capabilityAfter-sales and service controls appear weakly documented: there are no written customer-complaint procedures or records, no written service-capability assessment or corrective-action procedures, and no overseas agents, branches, warehouse, or showroom. The supplier does report inventory capability and accepts FOB, CIF, and EXW service quotations, but this does not establish effective after-sales support.
R&D capabilityThe supplier reports an available SDK, CAD capability, and one R&D engineer whose responsibilities include adapting product length, thickness, and shape to customer requirements. However, no design-input, output, review, verification, or validation documentation is available for audit, limiting evidence of a mature innovation system.
Customization capabilityThe supplier explicitly reports full, minor, flexible, and design-based customization, and its R&D engineer adjusts product length, thickness, and shape according to customer requirements. CAD is used for R&D, although the absence of auditable design documentation reduces confidence in formal customization control.
Product Q&A
Q:What is the minimum order quantity?
A:
The minimum order quantity is 28 tons.
Q:Do you offer customization services?
A:
Yes, we offer full customization, minor customization, and flexible customization from designs.
Q:What are the payment terms?
A:
We accept payment via T/T (Telegraphic Transfer).
Q:How long is the lead time for production?
A:
The lead time is within 15 workdays for both peak and off-peak seasons.
Q:Is the product suitable for construction applications?
A:
Yes, our scaffolding accessories are designed for decorations and constructions.
Send Inquiry
*To:
Hebei Shuangtai Mould Frame Technology Co., Ltd
Hebei Shuangtai Mould Frame Technology Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Durable Adjustable Steel Scaffolding Parts for Construction Projects
US$592.00-600.00
1 Ton(MOQ)
Durable Steel Scaffolding System Scaffolding Parts for Reliable Support in Building Maintenance and Repair Works
US$1.00-3.00
1,000 Pieces(MOQ)
Durable High Precision Scaffolding Parts for Reliable Construction Projects
US$592.00-600.00
1 Ton(MOQ)
Durable and Adaptable Scaffolding Parts for Quick Setup
US$592.00-600.00
1 Ton(MOQ)
Heavy Duty Scaffolding System Scaffolding Parts for Industrial Construction and Building
US$1.00-3.00
1,000 Pieces(MOQ)
Versatile Scaffolding Material Parts for Durable Construction Needs
US$592.00-600.00
1 Ton(MOQ)
Scaffolding System Scaffolding Parts for Safe and Reliable Construction and Building Site Applications
US$1.00-3.00
1,000 Pieces(MOQ)
Heavy Duty Carbon Steel Scaffolding System Fittings Accessories and Parts for Building Construction
US$1.00-3.00
1,000 Pieces(MOQ)
Quality Prop Accessory Plate Durable Steel Scaffolding Parts for Stability
US$1.50
1,000 Pieces(MOQ)
Adjustable Height Gi Steel Scaffolding Parts for Construction Projects
US$5.00
100 Pieces(MOQ)
Versatile Scaffolding Nut Durable Steel Prop Parts for Reliable Support
US$1.50
1,000 Pieces(MOQ)
Heavy Duty Scaffolding Parts for Easy Assembling and Durability
US$6.00-12.00
500 Pieces(MOQ)
High Quality Factory Supply Scaffolding for Construction Scaffolding Couplers Parts
US$0.90-9.90
500 Pieces(MOQ)
Forging Scaffolding Accessories Rosette Ringlock Scaffolding Parts System for Construction
US$1.19-5.99
50 Pieces(MOQ)
Heavy Duty Hot DIP Galvanized Ringlock Scaffolding Parts for Construction
US$500.00-660.00
50 Tons(MOQ)
Reliable Gi Steel Scaffolding Parts for Enhanced Construction Stability
US$5.00
100 Pieces(MOQ)
Customized Ring Lock Scaffolding Parts Casting Steel Brace End for Construction
US$0.80-1.50
1,000 Pieces(MOQ)
Professional Casting Factory Aluminium Scaffolding Foldable T Joint for Construstion Parts
US$2.80-9.99
1,000 Pieces(MOQ)



















