Powered by Made-in-China.com

Tecon Climbing Formwork, Jump Formwork Construction
Negotiable
1 Piece
Product profile
Customization
AvailableCertification
SGSMaterial
SteelModel NO.
TECON Jump formworkType
Climbing FormworkTrademark
TECONOrigin
JiangsuHS Code
8480600000Production Capacity
3000 Square Meter / YearKey features
Self-Climbing Capability: Climbs rapidly at 14cm/min without crane lift, saving time and labor.
High Safety Protection: Fully closed working area with anti-falling devices and reliable structural design.
Versatile Height Range: Platform total height adjustable from 12m to 18m for high-rise buildings.
Fast Operation Cycle: Requires only 0.5 to 2.0 hours to climb one floor with minimal workers.
Durable Steel Material: Constructed with galvanized steel and 1.5mm riffled plate to avoid fire hazards.
Customized Solutions: Tailored platform solutions available for various specific project structures.
Overseas Engineer Support: Engineers available for overseas service, assembly training, and usage guidance.
SGS Certified Quality: Product meets international standards with SGS certification.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤15hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
About Our Factory & Business Background
Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East
Product Q&A
Q:What is the maximum height of the platform?
A:
The platform total height ranges from 12m to 18m.
Q:Does the system require a crane for climbing?
A:
No, it climbs by itself rapidly without crane lift.
Q:How long does it take to climb one floor?
A:
It takes between 0.5 hours to 2.0 hours to climb one floor.
Q:Is the product customizable for different structures?
A:
Yes, customized solutions are available for any structures.
Q:What kind of after-sales support is provided?
A:
We provide training on assembly and usage, and engineers are available for overseas service.
Send Inquiry
*To:
Suzhou TECON Construction Technology Co., Ltd.
Suzhou TECON Construction Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Cantilever Climbing Jump Wall Concrete Construction Formwork for High Rise Building
US$480.00-1,200.00
1 Piece(MOQ)
Lianggong High Efficiency Automatic Self Climbing Formwork for Concrete Construction for Wall Jump Form for Wall
US$500.00-560.00
2 Pieces(MOQ)
The Automatic Hydraulic Jump, Self - Climbing Formwork
US$1,000.00
20 Sets(MOQ)
Lianggong Hydraulic Self-Climbing Formwork Jump Sliding Formwork for High-Rise Building Construction
US$3,998.00-4,998.00
10 Sets(MOQ)
Lianggong Manufacture Jump Formwork Hydraulic Auto Climbing Formwork for Concrete Construction
US$4,958.00-4,998.00
10 Sets(MOQ)
Tecon Long Service Life Aluminum Formwork for Concrete Construction
US$150.00-200.00
300 Square Meters(MOQ)
Tecon Timber Beam Formwork for Core Wall and Columns Construction
US$75.00-130.00
300 Square Meters(MOQ)
Building Construction Concrete Climbing Reusable Aluminum Adjustable Plastic Beam Column Slab Steel Formwork
US$55.00-70.00
1,000 Meters(MOQ)
Labor-Saving Efficient Durable Hydraulic Auto-Climbing Formwork for High Rise Buildings Concrete Construction
US$1,200.00-1,800.00
1 Ton(MOQ)
Lianggong Steel Concrete Hydraulic Self-Climbing Formwork for Bridge Pier Construction
US$700.00-1,050.00
50 Sets(MOQ)
High Pier Steel Formwork Climbing System for Railway Bridge Construction
US$16.00-35.00
20 Pieces(MOQ)
Direct Sales Construction Formwork Systems Column Metal Steel Climbing Formwork for Concrete
US$10.00-25.00
100 Pieces(MOQ)
China Total Contec Concrete Automatic Climbing Formwork for High-Rise Building Construction
US$2,587.00-2,887.00
10 Meters(MOQ)
Tecon H20 Timber Beam Formwork System for Core Wall and Columns Construction
US$75.00-130.00
300 Square Meters(MOQ)
Concrete Steel H20 Timber Beam Aluminum Wall Tunnel Form Dam Climbing Flex Table Slab Formwork for House Wall Slab Coulumn Construction
US$79.00-109.00
50 Square Meters(MOQ)
High-Rise Construction Climbing Formwork with Superior Surface Finish Quality
US$450.00-1,150.00
1 Set(MOQ)
Steel Cantilever Climbing Formwork for Building Concrete Construction
US$60.00-70.00
100 Meters(MOQ)



















