Powered by Made-in-China.com
Tecon High Efficiency Automatic Self Climbing Formwork for Concrete Construction
US$3,000.00-5,000.00
2 Sets
Product profile
Customization
AvailableAfter-sales Service
on- Site SupervisionHigh Carring Capacity
80kn Per CylinderModel NO.
TECON Self-climbing FormworkSpeed
0.5 Hours Per ClimbingHight
4.5m, 5m, >5mProduct Name
Hydraulic Self-Climbing Steel Formwork for ConstruFeature
Steady&High-Safety Progress During Self-ClimbingTransport Package
by Pallet or as CusomizedSpecification
SGSTrademark
TECONOrigin
ChinaHS Code
848060Production Capacity
50000sets/ YearKey features
Self-Climbing Efficiency: Climbs automatically without crane lift, taking around 0.5 hours per floor.
High Safety System: Features double embedding anchor system and climbing shoes for steady progress.
Customizable Planning: Adapts to different geometry plans and floor heights via customized planning.
High Reutilization Rate: Up to 90% reutilization rate from different projects, saving costs.
Sealed Protection: Fully sealed outer protection minimizes weather effects and ensures safety.
Comprehensive Service: Includes technical planning, on-site supervision, and training support.
Versatile Application: Suitable for residential, commercial, bridges, dams, and civil engineering.
Flexible Payment Terms: Accepts LC and T/T payment terms for international transactions.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤18hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
About Our Factory & Business Background
Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East
Product Q&A
Q:Does the formwork require a crane for climbing?
A:
No, the self-climbing platform climbs automatically without the need for a crane lift.
Q:What is the climbing speed per floor?
A:
The climbing speed per floor is around 0.5 hours.
Q:Can the formwork be customized for different project needs?
A:
Yes, it adapts to different geometry plans and floor heights via customized planning.
Q:What safety features are included?
A:
It features a double embedding anchor system and climbing shoes for steady and high-safety progress.
Q:What is the reutilization rate of the product?
A:
The reutilization rate is up to 90% from different projects.
Send Inquiry
*To:
Suzhou TECON Construction Technology Co., Ltd.
Suzhou TECON Construction Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Manufacturing High Strength Reusable Steel Formwork for Construction Concrete
US$80.00
30 Square Meters(MOQ)
High-Strength Reusable H20 Timber I-Joist for Concrete Formwork and Construction Support
US$8.56-10.56
100 Pieces(MOQ)
High Strength Waterproof Yellow H20 Beam Formwork for Construction
US$12.66-13.93
100 Pieces(MOQ)
Reusable High-Strength System Concrete Construction Steel Formwork
US$50.00
30 Square Meters(MOQ)
High-Strength H20 Timber Joist with I-Beam Profile for Building Formwork Construction
US$8.56-10.56
100 Pieces(MOQ)
Innovative H20 Concrete Formwork System for Efficient Construction
US$12.66-13.93
100 Pieces(MOQ)
Steel Frame Formwork Is Suitable for Various Types of Construction Projects
US$80.00
30 Square Meters(MOQ)
I-Beam Wooden Beam for China Formwork Reinforcement
US$8.00
200 Pieces(MOQ)
I-Beam Reinforcement Accessories for Reinforcing Plastic Formwork
US$8.00
200 Pieces(MOQ)
Tecon High Impact Strength Hollow Plastic Building Formwork for Construction Material
US$30.00-50.00
300 Pieces(MOQ)
Reusable and Convenient Steel Frame Formwork
US$80.00
30 Square Meters(MOQ)
Tecon High Efficiency Automatic Self Climbing Formwork for Central Shaft Core Wall
US$3,000.00-5,000.00
2 Sets(MOQ)
I-Beam Reinforcement Wood Accessories for The Plastic Formwork System
US$8.00
200 Pieces(MOQ)
Premium Heavy Duty Formwork Meva Formwork for Shandong Construction
US$100.00
2,000 Pieces(MOQ)
Aluminum Formwork Fabrication for High-Rise Concrete Construction
US$2,200.00-2,800.00
1 Ton(MOQ)
Tecon Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building
US$3,000.00-5,000.00
2 Sets(MOQ)
Aluminium Building Formwork Extrusion Profile for Concrete Construction
US$2,200.00-2,800.00
1 Ton(MOQ)
Tecon Reusable Slab Formwork System High-Efficiency Shuttering for Concrete Beam & Floor
US$70.00-110.00
300 Square Meters(MOQ)
High-Strength PP Plastic Formwork for Reliable Concrete Applications
US$12.00-18.00
200 Pieces(MOQ)
High-Performance Slab Formwork Panels Meva Formwork for Modern Design
US$100.00
2,000 Pieces(MOQ)



















