Powered by Made-in-China.com

Efficient Prefabricated Substation with Smart 3 Phase Transformer
US$2,000.00
1-9 Pieces
US$1,000.00
10+ Pieces
Product profile
Customization
AvailableApplication
Power, High-Rise Buildings, Factory, Hydropower StationPhase
ThreeModel NO.
YBCore
Core-type TransformerCooling Method
Oil-immersed Type TransformerWinding Type
Multi-winding TransformerCertification
ISO9001-2000, CCC, CEUsage
Combined Transformer, Power Transformer, Distribution Transformer, Prefabricated SubstationFrequency Characteristics
Low FrequencyShape of Core
RingBrand
TianrunRated Capacity
up to 1250kVA(Customized)Operation Voltage
High Voltage(Customized)Low Voltage
0.4kv(Customized)Shell Material
Stainless SteelShell Protection Grade
IP56Impedance Voltage
4%Frequency
50/60HzTransport Package
Wooden CaseSpecification
1800*1500*2300mmTrademark
TRNEOrigin
ChinaHS Code
8537209000Production Capacity
30 Unit/DayKey features
Factory Prefabricated Design: Fully assembled and tested in factory for plug-and-play installation and reduced on-site workload.
Customizable Rated Capacity: Rated capacity adjustable up to 1250kVA to meet specific project requirements.
Modular & Integrated Structure: Supports horizontal and vertical splicing with flexible combination for diverse project demands.
Intelligent Remote Monitoring: Equipped with remote control, protection, fire alarm, and gas detection for unattended operation.
Durable Outdoor Protection: Three-layer composite wall with IP54 protection level, suitable for harsh climates and seismic zones.
Wide Application Scenarios: Ideal for new energy, industrial mining, power grids, offshore platforms, and transportation fields.
Comprehensive Auxiliary Systems: Includes air conditioning, lighting, fire extinguishing, and drainage for stable long-term operation.
Fast Delivery Options: Peak season lead time one month; off-season delivery within 15 workdays.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 Year CertifiedNearest Port: Ningbo Port, Shanghai PortAverage Response Time: ≤0.31h
About Our Factory & Business Background
AddressNo. 788 Wenyi Road, Bihu Industrial Park, Liandu District, Lishui, Zhejiang, China
Plant Area50369.12 square meters
Number of Employees167
Registered Capital107,580,000 RMB
Terms of PaymentT/T
International Commercial Terms(Incoterms)FOB, CIF
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity1
Supply Chain Partners80
Our Production Capability & Technical Expertise
Main ProductsTransformer Switchgear Substation
Production Lines2
Production MachinesPunching machine, Laser cutting machine, CNC bending machine, Winding machine, Drying machine
QA/QC inspectors3 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers7 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2003-12-05
Main MarketsDomestic
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff1
Overseas Agent/BranchYes
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO14001, ISO45001:2018
Product CertificationCE
Cooperated with Fortune 500No
Product Q&A
Q:What is the maximum rated capacity?
A:
The rated capacity can be customized up to 1250kVA.
Q:Is the operation voltage customizable?
A:
Yes, both high voltage and low voltage levels are customizable.
Q:What is the protection grade of the enclosure?
A:
The enclosure features a three-layer composite wall with an overall protection level of IP54.
Q:Can the substation be customized based on my design?
A:
Yes, we offer full customization, minor customization, and customization from samples or designs.
Q:What is the lead time for production?
A:
Peak season lead time is one month, while off-season lead time is within 15 workdays.
Send Inquiry
*To:
Zhejiang Tianrun Electric Co., Ltd.
Zhejiang Tianrun Electric Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Smart Prefabricated Substation with High Voltage Transformer Integration
US$1,000.00-2,000.00
1 Piece(MOQ)
25kv 35kv 5000kVA 4000kVA Three Phase Prefabricated Compact Substation with Transformer
US$1,000.00-70,000.00
1 Piece(MOQ)
Innovative Compact Substation with 3 Phase Transformer Capabilities
US$1,000.00-2,000.00
1 Piece(MOQ)
Smart 630kVA 35kv Three Phase Prefabricated American Type Box Substation for Home
US$1,000.00-3,000.00
1 Piece(MOQ)
Smart Grid Connected Prefabricated Substation with Energy Storage and Management Function
US$5,000.00-50,000.00
1 Piece(MOQ)
Advanced Prefabricated Substation with Smart Step Down Transformer
US$1,000.00-2,000.00
1 Piece(MOQ)
OEM 1250kVA 3 Phase 33kv Compact Distribution Transformer Prefabricated Substation
US$1,000.00-70,000.00
1 Piece(MOQ)
Switchgear Cabinet Prefabricated Transformer Compartment Substation with Prefabricated Modular Steel Enclosure
US$110,000.00-115,000.00
1 Piece(MOQ)
Customized 11kv 630kVA 1250kVA Rainproof Compact Substation with Three Phase Transformer
US$1,000.00-70,000.00
1 Piece(MOQ)
Solar Park Supporting Smart Overload Resistant Transformer Prefabricated Substation
US$500.00-20,000.00
1 Piece(MOQ)
Mobile Prefabricated Combined Substation with Oil Immersed Transformer for Power Distribution Systems
US$110,000.00-115,000.00
1 Piece(MOQ)
250kVA Prefabricated Substation 630kVA Three Phase 50Hz Distribution Compact Transformer Substation
US$1,000.00-70,000.00
1 Piece(MOQ)
3 Phase Transformer High-Voltage Transformer Prefabricated Substation for Power Supply
US$1,000.00-2,000.00
1 Piece(MOQ)
Full Overload Protection Residential Park Transformer Prefabricated Substation with Compact Design
US$500.00-20,000.00
1 Piece(MOQ)
Reliable 630kVA 35kv Three Phase Compact Prefabricated Substation for Step up Transformer
US$1,000.00-3,000.00
1 Piece(MOQ)
Prefabricated Three Phase Pad Mounted Transformer Substation 33kv for Residential Area
US$1,580.00-7,650.00
1 Piece(MOQ)



















