SourcingAI
Try for free
Powered by Made-in-China.com
Heavy Load Quad Axle Container Width Method Statement Excavator Removal Maintenance Solution Control Forward Tipping Dump Semi Trailer Dumper
US$12,999.00-16,999.00
1 Piece
Sample price:US$14999.00/piece.Request sample

Product profile

After-sales Service

with

Warranty

1 Year

Type

Semi-Trailer

Model NO.

WD9960TIT006

Load Capacity

60t

Certification

ISO9001, CCC, ISO/TS16949

Wheel Base

1350mm

Tread

1820mm

Grade

Heavy Duty

Types of Suspension Systems

Mechanical Suspension

Shape

U Shape

Axle Number

3

Tire Number

12

Self-dumping

Self-dumping

ABS Anti-lock Braking System

ABS Anti-lock Braking System

Material

Steel

Condition

New

Name

Dump Semi Trailer

Total Volume

50t

Axle

3, 4, 5 Axles

Rim

9.00-22.5/8.00-20/8.5-20 China Brand

Tire

/12.00r22.5/315 80r22.5/11.00r20 /12.00r20

Suspension

American Type Mechanical Suspension

Spring Leaf

90(W)mm*16(Thickness)mm*10 Layer, 3 Pieces

King Pin

Jost 3.5 Inch Bolt-in King Pin

Landing Gear

Jost China Brand 28t

Main Beam

Optional

Pneumatic Braking System

6 Relay Valves; Spring Brake Chamber

Lifting System

Full Set of Hyva FC196 Hydraulic Lifting Cylinder

Side Wall Thickness

4mm Q235 Steel

Bottom Plate Thickness

6mm Q235 Steel

Tare Weight

15.6t

Transport Package

Naked

Specification

11*2.5*3.9m

Trademark

Wonderful

Origin

China

HS Code

8716100000

Production Capacity

5000 Pieces/Year

Key features

High Load Capacity: Capable of carrying up to 60 tons with a total volume of 40-50 cubic meters.
Durable Steel Construction: Constructed with 4mm side walls and 6mm bottom plates using Q235 steel.
Robust Axle System: Equipped with 3 heavy-duty axles rated at 13 tons each.
Reliable Braking System: Features ABS anti-lock braking system with 6 relay valves and spring brake chambers.
Efficient Hydraulic Lifting: Includes a full set of Hyva FC196 hydraulic lifting cylinders for self-dumping.
Premium Suspension: Uses American type mechanical suspension with 10-layer leaf springs.
Strong King Pin: Fitted with Jost 3.5-inch bolt-in king pin for secure towing.
Comprehensive Warranty: Backed by a 1-year warranty covering mechanical defects.

Company profile

SHANDONG WONDERFUL AUTO COMPANY LIMITED.
Importers and Exporters
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2024-06-06Nearest Port: Tianjin, Qingdao, ShanghaiAverage Response Time: ≤2.49hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, FCA

AI-Powered supplier vetting

SummarySHANDONG WONDERFUL AUTO COMPANY LIMITED is a Chinese supplier located in Qingdao, Shandong, operating as both a trading company and manufacturer. They specialize in auto spare parts and have a strong export focus, with 90% of sales from international markets. However, the company shows limited innovation ability with only one R&D engineer and no new products launched in the past year. The supplier lacks written procedures for handling customer complaints and corrective actions, indicating potentially weak after-sales service capabilities. Their financial credibility is unclear due to insufficient evaluative data. Customization services are comprehensive, spanning various levels of customization, which could appeal to diverse client needs.
Supplier typeThe supplier operates as both a trading company and manufacturer based in Qingdao, China.
CertificationsThe supplier has undergone an audit by TUVRHEINLAND, but the result of the evaluation was 0, indicating potential issues.
After-Sales capabilityThe supplier lacks written procedures or records for handling customer complaints and corrective actions, indicating weak after-sales service capability.
R&D capabilityInnovation capability is limited, with only one R&D engineer and no new products launched last year.
Production capacityThere is no evidence of significant production capability or new product development.
Customization capabilityThe supplier offers flexible customization services, including full and minor customization based on designs or samples.

Product Q&A

Q:What payment methods do you support?
A:
We support a variety of payment methods including T/T and LC, among others to meet your needs.
Q:What is your minimum order quantity?
A:
Our minimum order quantity is just one unit.
Q:How about the delivery time?
A:
Typically, delivery takes between 10 to 30 days after we receive your deposit. The exact date will depend on your order and specific item. We will confirm the delivery date with you and track the shipment continuously until it reaches its destination.
Q:How can I confirm whether your products will meet my needs?
A:
Provide us with details such as size, material, volume, and height, and our professional sales team will offer tailored solutions to meet your needs.
Q:How do you pack the products?
A:
We use standard shipping packaging to ensure the safety and integrity of your products.

Send Inquiry

*To:SHANDONG WONDERFUL AUTO COMPANY LIMITED.SHANDONG WONDERFUL AUTO COMPANY LIMITED.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Sinotruk 3 Axles 40 Tons 45 Tons Heavy Duty Dumper
Made-in-China.com
Fengyuan 3 Axle Tipper Trailer Semi Truck Trailer Dumper
Made-in-China.com
3 Axles 4 Axle 40t 50t U Shape Side Semi Tipper Dumper
Made-in-China.com
Fengyuan Dump Semi Trailer 25cbm Tipper Dumper

Fengyuan Dump Semi Trailer 25cbm Tipper Dumper

US$10,000.00-12,000.00
1 Piece(MOQ)
Made-in-China.com
Side Tipper Semi Trailer Road Train Dumper

Side Tipper Semi Trailer Road Train Dumper

US$12,500.00-15,500.00
1 Piece(MOQ)
Made-in-China.com
Premium Sinotruck HOWO Tipper Dumper for Global Distribution
Made-in-China.com
Advanced Mobile Truck Dumper for Efficient Retail Operations
Made-in-China.com