Powered by Made-in-China.com
Versatile 4 Axles 80tons Excavator Storage Lorry Method Statement Rigid Doordash Maintenance Forward Haul Loading End Rear Dump Semi Trailer Tipper Dumper
US$12,999.00-16,999.00
1 Piece
Sample price:US$14999.00/piece.Request sample
Product profile
After-sales Service
withWarranty
1 YearType
Semi-TrailerModel NO.
WD9960TIT006Load Capacity
60tCertification
ISO9001, CCC, ISO/TS16949Wheel Base
1350mmTread
1820mmGrade
Heavy DutyTypes of Suspension Systems
Mechanical SuspensionShape
U ShapeAxle Number
3Tire Number
12Self-dumping
Self-dumpingABS Anti-lock Braking System
ABS Anti-lock Braking SystemMaterial
SteelCondition
NewName
Dump Semi TrailerTotal Volume
50tAxle
3, 4, 5 AxlesRim
9.00-22.5/8.00-20/8.5-20 China BrandTire
/12.00r22.5/315 80r22.5/11.00r20 /12.00r20Suspension
American Type Mechanical SuspensionSpring Leaf
90(W)mm*16(Thickness)mm*10 Layer, 3 PiecesKing Pin
Jost 3.5 Inch Bolt-in King PinLanding Gear
Jost China Brand 28tMain Beam
OptionalPneumatic Braking System
6 Relay Valves; Spring Brake ChamberLifting System
Full Set of Hyva FC196 Hydraulic Lifting CylinderSide Wall Thickness
4mm Q235 SteelBottom Plate Thickness
6mm Q235 SteelTare Weight
15.6tTransport Package
NakedSpecification
11*2.5*3.9mTrademark
WonderfulOrigin
ChinaHS Code
8716100000Production Capacity
5000 Pieces/YearCompany profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2024-06-06Nearest Port: Tianjin, Qingdao, ShanghaiAverage Response Time: ≤2.49hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, FCA
AI-Powered supplier vetting
SummarySHANDONG WONDERFUL AUTO COMPANY LIMITED is a Chinese supplier located in Qingdao, Shandong, operating as both a trading company and manufacturer. They specialize in auto spare parts and have a strong export focus, with 90% of sales from international markets. However, the company shows limited innovation ability with only one R&D engineer and no new products launched in the past year. The supplier lacks written procedures for handling customer complaints and corrective actions, indicating potentially weak after-sales service capabilities. Their financial credibility is unclear due to insufficient evaluative data. Customization services are comprehensive, spanning various levels of customization, which could appeal to diverse client needs.
Supplier typeThe supplier operates as both a trading company and manufacturer based in Qingdao, China.
CertificationsThe supplier has undergone an audit by TUVRHEINLAND, but the result of the evaluation was 0, indicating potential issues.
After-Sales capabilityThe supplier lacks written procedures or records for handling customer complaints and corrective actions, indicating weak after-sales service capability.
R&D capabilityInnovation capability is limited, with only one R&D engineer and no new products launched last year.
Production capacityThere is no evidence of significant production capability or new product development.
Customization capabilityThe supplier offers flexible customization services, including full and minor customization based on designs or samples.
Send Inquiry
*To:
SHANDONG WONDERFUL AUTO COMPANY LIMITED.
SHANDONG WONDERFUL AUTO COMPANY LIMITED.*Content:
Supplier replies will be sent to your registered email
You may also like
Sinotruk 3 Axles 40 Tons 45 Tons Heavy Duty Dumper
US$22,300.00-28,900.00
1 unit(MOQ)
3 Axles 4 Axle 40t 50t U Shape Side Semi Tipper Dumper
US$11,000.00-16,000.00
1 unit(MOQ)
Versatile Mini Loader Dumper for Agricultural and Construction Tasks
US$899.00
1 Piece(MOQ)
Fengyuan 3 Axle Tipper Trailer Semi Truck Trailer Dumper
US$10,000.00-13,000.00
1 Piece(MOQ)
Sinotruk 6X4 Heavy Dumper for Nigeria Earthwork Construction Project
US$7,000.00-9,880.00
1 Piece(MOQ)
Durable Sinotruk HOWO Dumper 371HP 6X4 for Port Yard Cargo Handling
US$7,000.00-15,000.00
1 Piece(MOQ)
Advanced Mobile Truck Dumper for Efficient Retail Operations
US$13,299.00-25,999.00
1 Piece(MOQ)
Heavy Duty Mining Dumper Truck for Seamless Material Handling
US$8,000.00-14,000.00
1 Unit(MOQ)
Side Tipper Semi Trailer Road Train Dumper
US$12,500.00-15,500.00
1 Piece(MOQ)
Fengyuan Dump Semi Trailer 25cbm Tipper Dumper
US$10,000.00-12,000.00
1 Piece(MOQ)
Sinotruk 8X4 Rear Dumper for Africa Big Construction Project Material Haulage
US$7,000.00-9,880.00
1 Piece(MOQ)
Semi Trailer Dumper with Air Suspension and 295/80r22 5 Tires
US$14,000.00-15,000.00
1 Piece(MOQ)
Heavy-Duty U-Type Dumper Trailer for Efficient Material Transport
US$10,000.00-20,000.00
1 Piece(MOQ)
40/50ton HOWO 8X4 12-Wheel Heavy 6X4 Duty Dump Truck Diesel Engine New Heavy Duty Cargo Dumper for Mining
US$14,500.00-15,600.00
1 Piece(MOQ)
Chary Brand Heavy Duty Good Quality 25cbm 32cbm U-Shaped End Rear Tipper Dumper
US$20,000.00
1 Piece(MOQ)



















