Powered by Made-in-China.com
Advanced Dual Clamping Vibro Hammer for Superior Piling Efficiency
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-200Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
104kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
4.6 KgmCentrifugal Force
459 kNVibration Frequency
2300~3000 RpmSide Clamp Force
335kNBottom Clamp Force
385kNOperation Pressure
32 MPaWork Flow
170~230 L/MinWeight
2280 KgSuitable Excavator
20~25 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Dual Clamping System: Side and bottom clamps securely grip piles, eliminating extra equipment.
360-Degree Rotation: Full rotation allows precise pile positioning from any angle.
Low Clearance Capability: Designed for piling in minimal vertical clearance where top-drive hammers fail.
Versatile Pile Compatibility: Accommodates steel sheets, H-beams, and pipes with quick changeovers.
ISO 9001:2015 Certified: Ensures quality through high-strength materials and durable frame.
24/7 Technical Support: Global support available with spare parts supply and engineers.
Customizable Configuration: Color scheme and logo application can be customized to match fleet.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for Southeast Asia, India, Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme and logo application.
Q:How is the machine's quality and durability assured?
A:
ISO 9001:2015 compliance ensures quality. High-strength materials and durable frame minimize maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency effectively target compacted soils/mixed layers.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Dual Clamping Vibro Hammer for Efficient Foundation Work
US$100,000.00-10,000,000.00
1 Set(MOQ)
Dual Clamping Vibro Hammer for Advanced Foundation Piling Techniques
US$100,000.00-10,000,000.00
1 Set(MOQ)
High-Efficiency Juxiang S600 Hydraulic Vibro Hammer for Steel Piling Projects
US$23,000.00-24,000.00
1 Piece(MOQ)
Advanced Low Clearance Hydraulic Vibro Hammer for Piling Efficiency
US$100,000.00-10,000,000.00
1 Set(MOQ)
Dual Clamping Hammer for Enhanced Vibro Piling Performance
US$100,000.00-10,000,000.00
1 Set(MOQ)
Advanced 360-Degree Rotating Vibro Hammer for Piling Projects
US$22,000.00-23,000.00
1 Piece(MOQ)
High-Efficiency Juxiang Hydraulic Vibro Piling Hammer for Excavators
US$34,500.00-35,000.00
1 Piece(MOQ)
High Efficiency Rt-150A 150kw Electric Vibro Pile Hammer for Piling and Foundation Work on Construction Sites
US$62,900.00-83,900.00
1 Piece(MOQ)
Advanced Juxiang S350 Vibro Piling Hammer for Construction Projects
US$22,000.00-23,000.00
1 Piece(MOQ)
High Efficiency Side Grip Pile Driver Vibro Hammer for 20-30 Ton Excavator
US$23,200.00
1 Piece(MOQ)
Excavator Vibratory Concrete Sheet Pile Pipes Drivers Rotary Hydraulic Vibro Hammer for Piling
US$1,000.00-3,000.00
1 sets(MOQ)
Heavy-Duty Hydraulic Vibro Pile Hammer for Sheet Piling Efficiency
US$16,500.00-30,000.00
1 sets(MOQ)
Crane Type Electric Vibro Hammer for Pile Driving Efficiency
US$26,800.00-29,800.00
1 Set/Sets(MOQ)
Efficient for Cat320 8-12m Pile Driving Machine Side Clamp Vibro Hammer
US$23,400.00
1 Piece(MOQ)
Ray Vibratory Drivers Piling Hammer Hydraulic Vibro Hammer for Piling
US$18,300.00
1 Set(MOQ)
High-Efficiency Electric Vibro Hammer for Foundation Improvement Works
US$62,900.00-83,900.00
1 Piece(MOQ)
Powerful Excavator Mounted Vibro Hammer for Efficient Piling
US$20,000.00
1 Piece(MOQ)
5.9 Ton High Efficiency Hydraulic Piling Hammer Suitable for Piling and Pulling out Piles in Building Construction
US$100,000.00-1,000,000.00
1 Piece(MOQ)
High-Performance Zss500 Hydraulic Vibro Hammer for Piling Applications
US$10,000.00
1 Piece(MOQ)



















