Powered by Made-in-China.com
Advanced Dual Clamping Vibro Hammer for Efficient Foundation Work
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-300Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
133.3kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
5.6 KgmCentrifugal Force
558 kNVibration Frequency
2300~3000 RpmSide Clamp Force
385kNBottom Clamp Force
490kNOperation Pressure
32 MPaWork Flow
220~280 L/MinWeight
3150 KgSuitable Excavator
25~32 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Dual Clamping System: Side and bottom clamps securely grip piles during driving and extraction without extra equipment.
360-Degree Rotation: Full rotation enables precise pile positioning from any angle for improved efficiency.
Low Clearance Capability: Designed for piling in minimal vertical clearance areas like tunnels and under bridges.
Versatile Pile Compatibility: Accommodates steel sheet piles, H-beams, and pipe piles using the same machine.
ISO 9001:2015 Certified: Quality assured through adherence to international standards and high-strength materials.
Complete Piling Cycle: Performs clamping, positioning, driving, and extraction independently without auxiliary equipment.
Global Technical Support: 24/7 tech assistance and spare parts supply available worldwide.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for Southeast Asia, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color and logo.
Q:How is the machine's quality and durability assured?
A:
We adhere to ISO 9001:2015. High-strength materials ensure minimal maintenance.
Q:Is it suitable for hard soil conditions in our area?
A:
Yes. High centrifugal force effectively targets compacted and mixed soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Electric Vibro Hammer for Efficient Soft Soil Foundation Works
US$62,900.00-83,900.00
1 Piece(MOQ)
Advanced Dz150A Electric Vibratory Hammer for Efficient Deep Foundation Work
US$100,000.00-1,000,000.00
1 Roll(MOQ)
Heavy-Duty Vibro Hammer for Efficient Piling and Foundation Work S350 S500
US$22,000.00-23,000.00
1 Piece(MOQ)
Efficient Vibro Hammer with Dual Clamping System for Piling Tasks
US$100,000.00-10,000,000.00
1 Set(MOQ)
Efficient Electric Vibro Hammer for Advanced Foundation Improvement
US$62,900.00-83,900.00
1 Piece(MOQ)
Advanced Dual Clamping Vibro Hammer for Superior Piling Efficiency
US$100,000.00-10,000,000.00
1 Set(MOQ)
Advanced Dual Clamping Vibro Hammer for Foundation Piling
US$100,000.00-10,000,000.00
1 Set(MOQ)
Premium Excavator Vibro Pile Hammer for Efficient Foundation Work
US$22,000.00-23,000.00
1 Piece(MOQ)
Efficient for Cat320 8-12m Pile Driving Machine Side Clamp Vibro Hammer
US$23,400.00
1 Piece(MOQ)
Advanced Electric Vibro Pile Hammer for Precise Foundation Work
US$62,900.00-83,900.00
1 Piece(MOQ)
One-Stop Solution Multiple Piles Suitable Pile Driver Side Grip Vibro Hammer for Foundation Work
US$23,350.00
1 Piece(MOQ)
Heavy-Duty Vibro Pile Hammer for Efficient Foundation Work
US$33,000.00-35,000.00
1 Piece(MOQ)
Manual Slide Hammer Driver Fence Post Drilling Machinery for Efficient Sampling Works
US$1,762.00
16 Pieces(MOQ)
Advanced Juxiang Motor Tilting Vibro Hammer for Efficient Sheet Pile Driving
US$21,500.00-22,000.00
1 Piece(MOQ)
Powerful Excavator Mounted Vibro Hammer for Efficient Piling
US$20,000.00
1 Piece(MOQ)
375 kVA Convert Start Power 150kw Electric Vibro Pile Hammer for Lime Piles in Soil Stabilization and Foundation Reinforcement Works
US$62,900.00-83,900.00
1 Piece(MOQ)
Advanced Solar-Powered Hammer for Fast and Efficient Pile Driving
US$9,800.00-25,000.00
1 Piece(MOQ)
Hot Selling High Efficiency Fully Hydraulic System Vibro Hammer for Foundation Works
US$25,000.00-25,300.00
1 sets(MOQ)
Premium Vibro Hammer for Efficient Pile Driving Solutions
US$20,000.00-22,000.00
1 Piece(MOQ)



















