Powered by Made-in-China.com
Eccentric Pile Driver for Enhanced Foundation Strength and Efficiency
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-400Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
6.6kgmCentrifugal Force
656 kNVibration Frequency
2300~3000 RpmSide Clamp Force
465kNBottom Clamp Force
520kNOperation Pressure
32 MPaWork Flow
280~360 L/MinWeight
3870 KgSuitable Excavator
32~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
360-Degree Continuous Rotation: Ensures precise pile positioning from any angle for complex foundation work.
Low Clearance Capability: Side grip design operates in minimal headroom where top-drive hammers cannot fit.
Dual Clamping System: Secure side and bottom clamps eliminate extra handling during driving and extraction.
Versatile Pile Compatibility: Handles steel sheets, H-beams, and pipe piles with quick changeover interfaces.
ISO 9001:2015 Certified: Compliance ensures high-quality manufacturing and durable high-strength materials.
Global 24/7 Technical Support: Engineers available around the clock for help and spare parts supply.
Customizable Color and Logo: Machine appearance can be tailored to match your fleet branding.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics for SE Asia, India, Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color and logo.
Q:How is the machine's quality and durability assured?
A:
ISO 9001:2015 compliance. High-strength materials ensure minimal upkeep.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High force and adjustable frequency for compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Silent Hydraulic Pile Driver for Spun and Square Foundations
US$120,000.00-278,697.00
1 Set(MOQ)
High Efficiency Vibro Hammer and Smart Driver for Foundations
US$100,000.00-1,000,000.00
1 Set(MOQ)
High-Efficiency Static Pile Driver for Round and Square Foundations
US$140,000.00-478,697.00
1 Set(MOQ)
Versatile Static Pile Drivers for Triangular and Square Foundations
US$140,000.00-478,697.00
1 Set(MOQ)
Heavy-Duty Eccentric Pile Driver for 24m PC Foundations
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Static Pile Driver for Bridges and High-Rise Foundations
US$278,600.00-279,000.00
1 Set(MOQ)
High Efficiency Hydraulic Pile Driver for Solar Farm Foundation
US$14,210.00-14,610.00
1 Piece(MOQ)
Heavy-Duty Side Grip Pile Driver for Enhanced Construction Efficiency
US$100,000.00-10,000,000.00
1 Set(MOQ)
High-Efficiency Eccentric Pile Driver Fv-500 for Rapid Construction Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
Efficient Hydraulic Vibro Pile Driver for Photovoltaic and Bridge Foundations
US$11,040.00
1 Piece(MOQ)
Durable Jzb120 Pile Driver for Foundation Installation and Repair
US$175,000.00-180,000.00
1 Piece(MOQ)
Powerful Hydraulic Pile Driver for Steel and Concrete Foundations
US$13,500.00-14,000.00
1 Piece(MOQ)
Durable Hydraulic Vibro Pile Driver for River Embankment and Foundation Engineering
US$11,040.00
1 Piece(MOQ)
Efficient Excavator Mounted Pile Driver for Foundation and Infrastructure Construction
US$11,040.00
1 Piece(MOQ)
SDLQ full hydraulic drill rig machine for electric tower foundations, bridge works, and road engineering rotary pile driver
US$70,000.00-80,000.00
1 Piece(MOQ)
Heavy Duty Vibratory Pile Driver for Building and Infrastructure Foundation Works
US$11,040.00
1 Piece(MOQ)
High-Torque Solar Screw Pile Driver for Fast and Accurate Foundation Work
US$10,000.00-39,800.00
1 Set(MOQ)
High-Efficiency Hydraulic Solar Pile Driver for Photovoltaic Ground Mounting Systems
US$10,000.00-39,800.00
1 Set(MOQ)
Excavator Attachment Hydraulic Pile Driver for Building, Highway and Railway Foundations
US$8,888.00-16,666.00
1 Piece(MOQ)
All-Terrain Wheeled Solar Pile Driver for Efficient Solar Farm Construction and Maintenance
US$10,000.00-39,800.00
1 Set(MOQ)



















