Powered by Made-in-China.com
Efficient Vibration Frequency Driver for Heavy-Duty Pile Installation
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-300Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
133.3kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
5.6 KgmCentrifugal Force
558 kNVibration Frequency
2300~3000 RpmSide Clamp Force
385kNBottom Clamp Force
490kNOperation Pressure
32 MPaWork Flow
220~280 L/MinWeight
3150 KgSuitable Excavator
25~32 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Dual Clamping System: Side and bottom clamps grip piles for driving and extraction without extra equipment.
360-Degree Rotation: Full rotation enables precise pile positioning from any angle without repositioning the excavator.
Low Clearance Capability: Side grip design allows operations in limited headroom environments like factories and tunnels.
Versatile Pile Compatibility: Accommodates steel sheets, H-beams, and pipes with quick-change clamp seats.
Self-Sufficient Operation: Completes clamping, positioning, driving, and extraction independently without cranes.
ISO 9001:2015 Certified: High-strength materials ensure durability and minimize maintenance requirements.
Custom Configurations: Tailored designs available for specific needs including colors and logos.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time?
A:
Lead time is 15-35 days ex-works. Logistics are optimized for Asia, India, and Russia.
Q:Can the machine match our fleet?
A:
Yes. Custom colors and logos are available.
Q:What ensures the machine's quality and durability?
A:
The machine is ISO 9001:2015 certified and uses high-strength materials to minimize maintenance.
Q:Is the machine suitable for hard soil conditions?
A:
Yes. It features high force and adjustable frequency for compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy-Duty Pile Driver Attachment for 7-12 Ton Excavators
US$100,000.00-1,000,000.00
1 Set(MOQ)
Dual Action Side Grip Pile Driver for Efficient Installation
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Jzb60 Construction Pile Driver for Efficient Groundwork
US$135,000.00-140,000.00
1 Piece(MOQ)
Durable Hydraulic Pile Driver for Heavy-Duty Machinery Use
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver for Efficient Construction Projects
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver Zyc120b-B for Reliable Construction
US$130,000.00
1 Set(MOQ)
Heavy-Duty Sheet Pile Driver for Efficient Construction Projects
US$300,000.00
1 Set(MOQ)
Heavy-Duty Jzb60 Pile Driver for Efficient Ground Foundation Work
US$135,000.00-140,000.00
1 Piece(MOQ)
Heavy-Duty 90-Ton Hydraulic Pile Driver for Construction Excellence
US$130,000.00
1 Set(MOQ)
Heavy-Duty Pile Driver for Fast and Reliable Installation Solutions
US$120,000.00-478,697.00
1 Set(MOQ)
Heavy-Duty 40 Ton Hydraulic Vibro Pile Driver for Efficient Construction
US$23,000.00-24,000.00
1 Piece(MOQ)
Powerful Heavy-Duty Hydraulic Vibro Driver for Pile Installation
US$22,000.00-23,000.00
1 Piece(MOQ)
LG-3.5 Heavy-Duty Foundation Pile Driver – 3.5m Deep, 500mm Diameter for Secure Installations
US$22,000.00-26,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver for Efficient Foundation Construction
US$22,000.00-23,000.00
1 Piece(MOQ)
Heavy-Duty Jzl60 Hydraulic Pile Driver for Efficient Construction Projects
US$155,000.00-160,000.00
1 Piece(MOQ)
Heavy-Duty Pile Driver for Photovoltaic and Guardrail Installation
US$20,999.00-24,999.00
1 Piece(MOQ)
Heavy-Duty Jzl120 Hydraulic Pile Driver for Efficient Construction
US$175,000.00-180,000.00
1 Piece(MOQ)
Heavy-Duty Solar Pile Driver for Efficient Ground Installation
US$28,500.00-29,500.00
1 Piece(MOQ)
Versatile Vibratory Pile Driver for Efficient Foundation Installation
US$28,499.00-30,499.00
1 Piece(MOQ)
Heavy Duty 30 Ton Hydraulic Pile Driver for Efficient Sheet Piling
US$22,000.00-23,000.00
1 Piece(MOQ)



















