Powered by Made-in-China.com
Heavy-Duty 360° Rotating Pile Driver for Bridge Construction Efficiency
US$100,000.00-1,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
FV-150RPressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
56.3kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewVibration Frequency
2500 RpmCentrifugal Force
117 kNEccentric Moment
2.6 KgmOperation Pressure
30 MPaWork Flow
112.5 L/MinMax.Pile Length
8mSuitable Excavator
12~17 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
High Pressure Rotary Joint: Features 40MPa pressure resistance and large flow capacity for smooth operation.
Axial Pull Force: Delivers 90 tons of axial pull for efficient extraction of steel sheet and pipe piles.
ISO 9001:2015 Certified: Manufactured under strict quality standards ensuring durability and minimal maintenance.
Extended Tubing Life: High pressure motor rotates joint to vibrate tubing, preventing friction bursts and wear.
Global 24/7 Support: Provides round-the-clock technical assistance and spare parts supply worldwide.
Multiple Model Options: Available in FV-100R to FV-330R to suit excavators from 7 to 38 tons.
Custom Configuration: Tailored designs available for color, logo, and specific project requirements.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for Southeast Asia, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme and logo application.
Q:How is the machine's quality and durability assured?
A:
We adhere to ISO 9001:2015. High-strength materials and a durable frame ensure minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency effectively target compacted soils and mixed layers.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Versatile Drill Rig Static Pile Driver for Efficient Piling Operations Heavy Construction Equipment
US$261,000.00-270,000.00
1 Set(MOQ)
High-Efficiency Fv-280 Hydraulic Pile Driver for Heavy-Duty Construction
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Static Pile Driver for Concrete Foundations
US$150,000.00-278,697.00
1 Set(MOQ)
Heavy-Duty Jzb60 Construction Pile Driver for Efficient Groundwork
US$135,000.00-140,000.00
1 Piece(MOQ)
Heavy-Duty Static Pressure Pile Driver for Construction Efficiency
US$120,000.00-378,697.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver for Efficient Construction Projects
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Eccentric Pile Driver Fv-900 for Construction Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver for Long-Lasting Construction Solutions
US$22,000.00-23,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver with 360° Rotating Grip for Construction
US$100,000.00-10,000,000.00
1 Set(MOQ)
Advanced Hydraulic Pile Driver Gear Rotating for Versatile Construction Tasks
US$25,000.00-25,300.00
1 sets(MOQ)
Heavy-Duty 40 Ton Hydraulic Vibro Pile Driver for Efficient Construction
US$23,000.00-24,000.00
1 Piece(MOQ)
Heavy Duty 30 Ton Excvator Hydraulic Tilt Pile Driver for Construction Projects
US$14,500.00
1 Piece(MOQ)
Heavy Duty Pile Driver for Construction Site
US$184,600.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver for Efficient Foundation Construction
US$22,000.00-23,000.00
1 Piece(MOQ)
Heavy-Duty Jzl90 Pile Driver for Fast Construction Success
US$165,000.00-170,000.00
1 Piece(MOQ)
Heavy-Duty Vibro Pile Driver for Robust Construction Projects
US$11,500.00-13,000.00
1 Piece(MOQ)
Heavy-Duty Jzl60 Hydraulic Pile Driver for Efficient Construction Projects
US$155,000.00-160,000.00
1 Piece(MOQ)
Heavy-Duty Excavator-Mounted Pile Driver for Road, Bridge & Port Construction
US$11,000.00-20,000.00
1 piece(MOQ)
Heavy-Duty SDLQ LG-5 Pile Driver for Bridges and Billboards
US$22,000.00-26,000.00
1 Piece(MOQ)



















